Permit Number: BLD2021-05614
Issued: 06/06/2022
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
4714) 765 -5153
www.anaheim.net/building
(714)765-4626
')uarter Section: 61
Sao Address: 900 W LA PALMA AVE, ANAHEIM, CA 92801
Legal Description: A TR ANAHEIM EXT BLK LOT 39 ANAHEIM EXT LOT 39 POR
APN: 25515107
Project Description: Site Work: Construct 1,685 LF masonry wall with motor operated rolling gale, 140 LFX 8-12 ft high retaining wall,
352 sq ft canopy, new concrete slab for tanks, install 800 amp sub panel and underground electrical conduit for water treatment plan
Living Area: Number of Stories: 0 Valuation: 9,667,800.00
Garage Area: Constmction Types: IIB
Carport Area: Occupancy Groups: C, C. C. C
Balcony / Deck Area: Fire Spnnkkred: No
Cool Roof Total Fees paid for Perma: 13,151.84
People Associated with Project
Contractor C D M CONSTRUCTORS INC 555 17TH STREET STE 500 DENVER, CO 80202
Permit Applicant Nicholas Rayson
Owner CITY OF ANAHEIM 201 S ANAHEIM BLVD 7TH FL
Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures Oty
Conduit and Conductors - per 50 ft. 13
Motors - Factory Wired Appliance, up to 1 3
h.p.
Motors - over 10 h.p. 1
Pole Light
Receptacle, switches, lights
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the
dale of permit issuance. A new permit Is required to commence or continue work.
I
City of Anaheim t�hNEIM ��(
04 A.
BUIICIIIICj Division F i
v S
A DONDED fib`'^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
F DATE INSPECTC'gi
All applicable items below must be signed before utilities are released 7
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765A280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
"_2 _
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 businesadays)2
Setback/Forms/Trenches (Footings)
-z;
1
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
%ionp.d
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
_
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
'r,
Floor (Joist/Girders)
IN1423 PL*
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
i
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele.. Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
n
lnam//'� A� �
1"ffi.,NCie. fi
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes NewConstruction
Exterior Plaster (Brown Coat)
a 24
Ele., or Mec.)
I
IntercoStruct,
Grease Interceptor�'-'^
GreT-Base
1Dp not hnrkfjjll,mlPss sinned off)_
IAY'Ft0.�- rrotJP/). ? cSGC of proved RI/AKremri,
Sewer
I2d -ZZ - tivl
Water Engineering Backflow (Testable Only)
Water Service
CDM
Smith
22965 Gateway Oaks, Or, Suite 250
Sacramento, CA 95628
te1: 916 657-9900
August 21, 2024
Subject: Statement of Structural Observation: La Palma
City of Anaheim Building Department
This letter serves as the structural observation as requested for the work at the La Palma site,
located at 900 W La Palma Ave, Anaheim CA 92801. The structural observation reports for the
individual visits are appended to this letter.
To the best of my knowledge the construction is in general conformance with the structural
drawings and specifications. To the best of my knowledge, there aren't any unresolved deficiencies.
Sincerely,
Carlos N. Ortiz, SE
Associate, Structural Engineer
CDM Smith Inc.
cc: Nate Lazewsld
WATER + ENVIRONMENT + TRANSPORTATION + ENERGY + FACILITIES
- -
cSmith
9220 Cleveland Ave.
SURe 100
Rancho Cucamonga, CA91730
June 4, 2024
Jacob Hester, PE
Water Engineering Manager
Anaheim Public Works
201 S. Anaheim Blvd., 61 Floor
Anaheim, CA 92905
Subject: La Palma
Certification of Work
Dear Mr. Hester:
Per the Agreement 9.5.1.6, CDM Smith hereby attests that the work has been completed in accordance
with the design and contract documents. The Engineer of Record (EOR) performed site walk with APU
representatives on May 21, 2024 and the La Palma site is found substantially completed with the FOR
observations attached to address during the next 30-days toward final completion of the site.
Sincerely,
Evelyn Chang
Engineer of Record Representative
CDM Smith Inc.
cc: Divya Agrawalla
Jerome Ruddins
Randy Lovan
Raul Garcia
Nate Lazewski
Kelly Roach
Roshan Aflaki
Leonel Almanzar