Loading...
550 S CITRON ST (2)Permit Types BLD ELE MEC PLM X Permit Number: BLD2024-06449 Issued: 12/10/2024 www.anaheim.net/building (714)765-4626 Quarter Section: 73 Site Address: 550 S CITRON ST, Anaheim, CA 92805 Legal Description: N TR 217 BLK A LOT 13 APN: 03616113 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 • 5153 Project Description: Reroof: To remove and install (19) squares of composition shingles over house only. Living Area: Number of Stonev 1 Valuation: 7,790.00 Garage Area: Construction Types: VB Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Spnnklered: Cool Roof: Total Fees paid for Pennk: 361.01 People Associated with Project: Permit Applicant Ramon Chaidez Owner NEVAREZ, RAMON CHAIDEZ 550 S CITRON ST Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. PNPFtEIM Cq< City of Anaheim OQ iO Building DIVISIOn ti i u a �DVNDED eh Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 7654280 Engineering Final (714) 7654126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Formsrrrenches (Footings) COA/Migation Measures Do not install sub0oor or pour Floor slab until the follmng applicable items have been Building Final (714 7655163) last Inspection -Final Only After Above Completed 1Z,liIJ N:)S:l Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been si-ned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) _ Zy,( Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) -fr. T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unlesn sinned off) Sewer W Water Engineering Backflow (Testable Only) Water Service