550 S CITRON ST (2)Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2024-06449
Issued: 12/10/2024
www.anaheim.net/building
(714)765-4626
Quarter Section: 73
Site Address: 550 S CITRON ST, Anaheim, CA 92805
Legal Description: N TR 217 BLK A LOT 13
APN: 03616113
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 • 5153
Project Description: Reroof: To remove and install (19) squares of composition shingles over house only.
Living Area: Number of Stonev
1 Valuation: 7,790.00
Garage Area:
Construction Types: VB
Carport Area:
Occupancy Groups:
Balcony I Deck Area:
Fire Spnnklered:
Cool Roof:
Total Fees paid for Pennk: 361.01
People Associated with Project:
Permit Applicant Ramon Chaidez
Owner NEVAREZ, RAMON CHAIDEZ 550 S CITRON ST
Type Electrical Fixtures Qty Type Plumbing Fixtures
Qty Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
PNPFtEIM Cq<
City of Anaheim
OQ iO
Building DIVISIOn ti i
u a
�DVNDED eh
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 7654280
Engineering Final (714) 7654126
INSPECTION
DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7654591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Formsrrrenches (Footings)
COA/Migation Measures
Do not install sub0oor or pour Floor slab until the follmng applicable items have been
Building Final (714 7655163)
last Inspection -Final Only After Above Completed
1Z,liIJ
N:)S:l
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been si-ned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
_ Zy,(
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
-fr.
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unlesn sinned off)
Sewer
W
Water Engineering Backflow (Testable Only)
Water Service