Loading...
911 S WEBSTER AVE (3)Permit Types BLD ELE MEC PLM X Permit Number: BLD2025-00399 Issued: 01127/2025 www.anaheim.net/build i ng (714)765-4626 Quarter Section: 28 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714)765-5153 Site Address: 911 S W EBSTER AVE ANAHEIM, CA 92804 Legal Description: N TR 787 BLK LOT 15 TR 787 LOT 15 AND LOT 16 AND APN: 12730213 , _, Project Description: Reroof. Remove and install (23) sq of flat roof over the carport units (1-4 and 13-16) Living Area: Numberof Stones: 1 Valuation: Garage Area: Construction Types: CarportArea: Occupancy nc Grou s: P Balcony I Deck Area: Fire Spnnklered: Cool Roof: Total Fees field for PermH: People Associated with Project: Contractor ROYAL CONSTRUCTION RAMP; ROOFING CO 172 E ORANGETHORPE AVE PLACENTIA, CA Permit Applicant Miguel Chavez Owner WEBSTER PARTNERS LLC 1200 NEWPORT CENTER DR 260 10.475.00 N/A 361.93 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures City The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. PHEIM ��i ity of Anaheim OF P� q�'O Building Division F i u ' �gV/yDED t$�^ Do not occupy this buildina until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765<280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub LisVBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour Floor slab until the follwing applicable items have been qioned Building Final (714766-5153) Last Inspection -Final Only After Above Completed N v Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisVGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do nrn ernef or conceai the work below until the following applicable items have sinnedbeen list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Flog_ Ele., Mee 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2 3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Donet hankfill unless sinner! off) Sewer Water Engineering Backflow (Testable Only) Water Service