223 W HAMPSHIRE AVE (3)Permit Types
BLD
ELE
MEC
PLM
X
Permit Number: BLD2024-06666
Issued: 12/2312024
www.anaheim.net/building
(714)765-4626
Quarter Section: 85
CITY OF ANAHEIM
Site Address: 223 W HAMPSHIRE AVE, ANAHEIM, CA 92805
Legal Description: N TR 1653 BLK LOT 7
APN: 03628003
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Residential Remodel: Install 300 sq. ft. of drywall in garage.
Living Area:
Garage Area',
Carport Area:
Balcony / Deck Area:
Cool Raof:
Number of Stories-
1 Valuation: O,Do
Construction Types: VB
Occupancy Groups:
Fire Sptlnklered:
Total Fees paid for Penult: 235.00
People Associated with Project:
Owner NGUYEN, LARRY LUYEN 1711 IRVINE AVE
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qq
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
�p—EIM,-q
City of Anaheim h T
Final Gas Test
o
s
Building Division ,. Z
Electrical Final
>
Plumbing Final
-
Mechanical Final
late^
Cross Connection Control (714) 765.4280
D ED
Engineering Final (714) 766.5126
Do not occuOV this building until the final inspections have been made.
INSPECTION
I DATE
JINSPECTOR
Fire Sprinkler (ONLY) (714) 765.5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 7655041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Electrical Ground ElectrodelUfer
Setback/Forms/Trenches (Footings)
COA/Migation Measures
o Irotb until the fol wing appura items have been
Dinstall subfloor or pour floor sla
Building Final (714 7655153)
sianed
Last tnepection•Fhwl Only Alter Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Mechanical (Groundwork)
Building Inspections
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoistlGirders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following
applicable
items have
been s
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
L 3l
Drywall Penetrations (Ele, Mac & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service