Loading...
708 E WILHELMINA STPermit Types SLID ELE MEC PLM X Permit Number: BL02009-03152 Issued: 09/25/2009 www.anaheim.net1building (714)765-4626 Quarter Section: 82 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141765. 5153 Site Address: 708 E WILHELMINA ST ANAHEIM, CA Legal Description: APN: 03521008 Project Description: Install 200 amp temporary power pole. Living Area: Number of Stories: Valuation: 0.00 Garage Area: Conssuc0on Types: Not Appiic3Ne CarportArea: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permk: 136.73 People Associated with Project: Contractor NATIONAL CONSTRUCTION RENTALS INC 15319 CHATSWORTH STREETABCDE11153104 MISSION HILLS, CA92701 Permit Applicant AGUSTIN VALDOVINOS Owner ROLAND COVEY 16561 BOLSA CHICA ST#202 HUNTINGTON BEACH, CA 92649 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Temp Power Pole/Pedestal (includes 1 meter) The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. PNPNEIM cqc Cityof Anaheim O4 io Building Division ' y > �OVNOEp ts�^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final — •o. 11�� `,x 1 RED Cross Connection Control (714) 7654280I N S P C Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour Floor slab until the follmrig applicable items have been sianed Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisUGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing tOnly after Plbg Etc nlec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Bacli (Testable Only) Water Service