708 E WILHELMINA STPermit Types
SLID ELE MEC PLM
X
Permit Number: BL02009-03152
Issued: 09/25/2009
www.anaheim.net1building
(714)765-4626
Quarter Section: 82
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(7141765. 5153
Site Address: 708 E WILHELMINA ST ANAHEIM, CA
Legal Description:
APN: 03521008
Project Description: Install 200 amp temporary power pole.
Living Area: Number of Stories:
Valuation:
0.00
Garage Area:
Conssuc0on Types:
Not Appiic3Ne
CarportArea:
Occupancy Groups:
Balcony / Deck Area:
Fire Sprinklered:
Cool Roof:
Total Fees paid for Permk:
136.73
People Associated with Project:
Contractor NATIONAL CONSTRUCTION RENTALS INC
15319 CHATSWORTH STREETABCDE11153104 MISSION HILLS, CA92701
Permit Applicant AGUSTIN VALDOVINOS
Owner ROLAND COVEY
16561 BOLSA CHICA ST#202 HUNTINGTON BEACH, CA 92649
Type Electrical Fixtures Qty Type
Plumbing Fixtures Qty Mechanical Fixtures
Qty
Temp Power Pole/Pedestal (includes 1
meter)
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
PNPNEIM cqc
Cityof Anaheim O4 io
Building Division ' y
>
�OVNOEp ts�^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final — •o.
11��
`,x
1
RED
Cross Connection Control (714) 7654280I N
S P
C
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7654591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour Floor slab until the follmrig applicable items have been
sianed
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoisUGirders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing tOnly after Plbg Etc nlec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Bacli (Testable Only)
Water Service