Permit Number: BLD2025.00118
Issued: 01/09/2025
www.anahei m. net1building
(714)765-4626
Quarter Section: 28
Site Address: 811 S ROANNE ST ANAHEIM, CA 92804
Legal Description: N TR 2468 BLK LOT 11
APN: 12729304 il -
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765. 5153
"�-
--0vnl_o
Project Description: Residential Remodel: Remove and install (24)sq of composition shingles over the entire house and attached
garage and changeout(1) receptacle
Living Area: Numberof Stones: 1 Valuation: 16.000.00
Garage Area: Construction Types: NIA
Corpori Occupancy Groups:
Balcony / Deck Area. Fire Spnndered:
Cool Roof: Total Foes paid for Permit: 364.08
People Associated with Project:
Contractor PROMISE LAND GENERAL CONSTRUCTION IN 926 SOUTH VERONA STREET201912231118331820 ANAHEIM, CA92804
Permit Applicant Esau Gutierrez
Owner ROBLES, RICK R TR 17682 HEVER CIR
Type Electrical Fixtures City Type Plumbing Fixtures Oty Mechanical Fixtures City
Receptacle, switches, lights i
The permit shall expire by limitation and become null and void lithe building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
PNPHEIM 01C
City of Anaheim p� 10
Building Division 3
"I >
OGNDED \E
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-6041
Dn not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/FormslTrenches (Footings)
COA/Migation Measures
Do not install subfloor or pour Floor slab until the follwing applicable items have been
sinnedBuilding
Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed
tat Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/DiaphragmlFrame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele.. Meg & Fire)
Insulation (SoundlEnergy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
f Do not backfill unless anned off)
Sewer
Water Engineering Backflow, (Testable Only)
Water Service