Loading...
811 S ROANNE STPermit Types BLD ELE MEC PLM X X Permit Number: BLD2025.00118 Issued: 01/09/2025 www.anahei m. net1building (714)765-4626 Quarter Section: 28 Site Address: 811 S ROANNE ST ANAHEIM, CA 92804 Legal Description: N TR 2468 BLK LOT 11 APN: 12729304 il - CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765. 5153 "�- --0vnl_o Project Description: Residential Remodel: Remove and install (24)sq of composition shingles over the entire house and attached garage and changeout(1) receptacle Living Area: Numberof Stones: 1 Valuation: 16.000.00 Garage Area: Construction Types: NIA Corpori Occupancy Groups: Balcony / Deck Area. Fire Spnndered: Cool Roof: Total Foes paid for Permit: 364.08 People Associated with Project: Contractor PROMISE LAND GENERAL CONSTRUCTION IN 926 SOUTH VERONA STREET201912231118331820 ANAHEIM, CA92804 Permit Applicant Esau Gutierrez Owner ROBLES, RICK R TR 17682 HEVER CIR Type Electrical Fixtures City Type Plumbing Fixtures Oty Mechanical Fixtures City Receptacle, switches, lights i The permit shall expire by limitation and become null and void lithe building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. PNPHEIM 01C City of Anaheim p� 10 Building Division 3 "I > OGNDED \E Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-6041 Dn not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/FormslTrenches (Footings) COA/Migation Measures Do not install subfloor or pour Floor slab until the follwing applicable items have been sinnedBuilding Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been signed tat Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/DiaphragmlFrame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele.. Meg & Fire) Insulation (SoundlEnergy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor f Do not backfill unless anned off) Sewer Water Engineering Backflow, (Testable Only) Water Service