Loading...
507 S EUCLID ST (2)Permit Types BUD 1 ELE MEC PLM CITY OF ANAHEIM X X X X BUILDING DIVISION Permit Number: BL02023-06682 200 S. ANAHEIM BLVD. Issued: 03/27/2024 (714) 765 - 5153 www.anaheim.net/building (714)765-4626 Quarter Section: 47 Site Address: 507 S EUCLID ST, Anaheim, CA 92802 Us Legal Description: S TWP 4 RGE 10 SEC 17 SEC 17 T 4 R 10 POR S1/2 SEi APN: 12809108 Project Description: Change of Use: 690 sq. ft. to convert (M) suite into a new massage parlor (B) with updated electrical, mechanical and plumbing "Ocean Massage" Living Area: Number of Stones: i Valuation: Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Spnnklered: Cool Roof: Total Fees paid for Permit: People Associated with Project 10.000.00 VB B, 6 ND 1,991.s0 Contractor DOAN CONSTRUCTION SERVICES 14302 HOPE ST GARDEN GROVE, CA 92843 Permit Applicant BRUCE CDOAN 14302 HOPE ST GARDEN GROVE, CA 92843 Owner PARK, SO YOUNG 2019 W EMBASSY AVE Engineer- Civil HUE C LUI 10732 LA BATISTA AVE201304181411521550 FOUNTAIN VALLEY, CA 92708 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Receptacle, switches, lights 6 Floor Sink 1 Commercial System Per 1,000 sq. ft. i Sub Panel/Temp Pwr - Under 600 V, up to 1 Washing Machine Rough 1 Ventilation Fan - <= 300 cfm on single duct 1 200 amps Water Heater 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit Is required to commence or continue work. PNP ILIM �q< Cityof Anaheim o4 To Building Division f Z O > • �DVNDED yW, Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 Fire Sprinkler (ONLY) (714) 765-5041 INSPECTION I DATE I INSPECTOR Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-6041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not Install subfloor or pour floor slab until the follwmg applicable items have been n Building Final (714 765-5163) Last Inspection -Final Only After Above Completed � Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections ✓ `�'/_tom , e) Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Rail I� Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cove, or Conreal the work below until the following applicable tlerns have been sianed 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) L Masonry (Reinf./Bond BeamlPre-Grout) Rough Plumbing (Top Out) b ) Rough Duct (Mechanical) Rough Mechanical Rough Electrical �- Rough COA/Mitagation Measures Plumbing Inspections Framing Only afw, Pin, Ele Mec 8 Fire) U Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signee Drywall Ith '> Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath / moal inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor dDr rr Sewer Water Engineering Backflow (Testable Only) Water Service