Loading...
608 N ALAMO STPermit Types BLD ELE MEC PLM X Permit Number: BLD2025-00844 Issued: 02/20/2025 www. a nahe i m. neb b u i l d i ng (714)765-4626 Quarter Section: 31 CITY OF ANAHEIM Site Address: 608 N ALAMO ST-H-LITEANAH EIM, CA 92801 Legal Description: N TR 2962 BLK LOT 2 APN: 07145312 BUILDING DIVISION 200 S. ANAHEIM BLVD, (7141 765 •5153 Project Description: Reroof: To remove and install (11) squares of flat roof torch down over detached garage only. Living Area. Number of Stones'. 1 valuation: Garage Area: Consnuction Types: CarportArea: Occupancy Groups: Balcony / Deck A. Fire Sprinklerad. Cool Roof: Total Faec paid for Permit: People Associated with Project: Permit Applicant Pablo Barton Owner BARRON, PABLO 8 PATRICIA 2714 N EASTSIDE ST 8.000.00 N/A 357.24 Type Electrical Fixtures City Type Plumbing Fixtures Qty Mechanical Fixtures City The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. PaPHEIM c�( Cityof Anaheim Op iO Building Division _F i > �0 VDEV ishh Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-6041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub LisVBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COAIMigation Measures Do not install subfloor or pour Floor slab until the follwing applicable items have been sianed Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing(Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisVGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been stoned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond BeamlPre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering BackBow (Testable Only) Water Service