Loading...
921 S NATALIE LNPermit Types BLD ELE MEC q X Permit Number: BLD2025-00909 Issued: 02/24/2025 wwri,ii.anahem.net/building (714)765-4626 Quarter Section: 215 Site Address: 921 S NATALIE LN ANAHEIM, CA 92808 Legal Description: N TR 12685 BLK LOT 4 APN: 35655204 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Electrical: Residential EV Charger and 200amp main panel upgrade Living Area: GarageArea: CarportArea: Balcony / Deck Area: Goof Roof: Number of Stories: t._ 1 Valuation: 0.00 construction Types: N/A Occupancy Groups: Fire Sprinklered Total Fees paid for Permk: 271.00 People Associated with Project: Contractor FLO-ELECTRIC 217 W HACIENDA DR CORONA, CA Permit Appliant Katie Flores Owner CHANG, CHRIS H 921 S NATALIE LANE Type Electrical Fixtures Cry Type Plumbing Fixtures Oty Mechanical Fixtures City EV Charger 1 Meter/Disc Sw - Under 600 V. up to 200 1 amps The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. P - t4EIM cq` Cityof Anaheim 04 a Building Division ti i DUNDED tsh Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS I DATE I INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final 31yl;s- Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed- Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migalion Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sionad Building Final (714 765-6153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical EWE :;,,, Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec- 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Insoections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Piaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backilow, (Testable Only) Water Service