921 S NATALIE LNPermit Types
BLD ELE MEC q
X
Permit Number: BLD2025-00909
Issued: 02/24/2025
wwri,ii.anahem.net/building
(714)765-4626
Quarter Section: 215
Site Address: 921 S NATALIE LN ANAHEIM, CA 92808
Legal Description: N TR 12685 BLK LOT 4
APN: 35655204
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: Electrical: Residential EV Charger and 200amp main panel upgrade
Living Area:
GarageArea:
CarportArea:
Balcony / Deck Area:
Goof Roof:
Number of Stories:
t._
1 Valuation: 0.00
construction Types: N/A
Occupancy Groups:
Fire Sprinklered
Total Fees paid for Permk: 271.00
People Associated with Project:
Contractor FLO-ELECTRIC 217 W HACIENDA DR CORONA, CA
Permit Appliant Katie Flores
Owner CHANG, CHRIS H 921 S NATALIE LANE
Type Electrical Fixtures Cry Type Plumbing Fixtures Oty Mechanical Fixtures City
EV Charger 1
Meter/Disc Sw - Under 600 V. up to 200 1
amps
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
P - t4EIM cq`
Cityof Anaheim 04 a
Building Division ti i
DUNDED tsh
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS I DATE
I INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
31yl;s-
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed-
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migalion Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sionad
Building Final (714 765-6153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
EWE
:;,,,
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec- 8 Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Insoections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Piaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backilow, (Testable Only)
Water Service