Loading...
265 S CHRISALTA WAY (4)Permit Types BLD ELE I MEC PLM X X X X Permit Number: BLD2024-01249 Issued: 03/11/2024 www, a na hei m. net/building (714)765-4626 Quarter Section: 174 CITY OF ANAHEIM Site Address: 265 S CHRISALTA WAY, ANAHEIM, CA 92807 Legal Description: P BK 89 PG 42 PAR 2 APN: 36120246 BUILDING DIVISION 200 S. ANAHEIM BLV 17ta1765 Project Description: Residential Remodel: To remove and replace shower tile in master bathroom, change out (1) retrofit window. Plumbing and Electrical fixture upgrades Living Area: Number of Stories: 2 Valuation: 20,000.00 Garage Area: Construction Types: N/A Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Spenders& Cool Rocf: Total Fees paid for Permit: 268.60 People Associated with Project: Permit Applicant Judy Joss Owner JOSS, DAVID R TR THE 265 S CHRISALTA WAY Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Receptacle, switches, lights 1 Shower 1 Ventilation Fan - <_ 300 cfm on single duct 1 The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. P�pFtEIM V Cityof Anaheim OF iO Building Division ' z V ' . youA'DED ysg^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do plot mslall subfloof or pour floor slab until the follwing applicable items have been n Building Final anal my After A Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do noI cover of GonCeM the work below until the following apphcaole fems have nFen Soiled 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbinq Inspections Framing iGnlya%et Ping rib Mef: & Fire, Insulation (Sound/Energy) Dc not tape or plaster unlil the following applicable items have been signeo. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set wNnn 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T•Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service