100 S ANAHEIM BLVD 200-250 (2)CITY OF ANAHEIM
PHLi,a1 x.
O
Permit Types
BUD
ELE
MEC
PLM
X
X
X
X
Permit Number: BLD2024-02221
Issued: 10/0212024
www.anaheim.neVbuild i ng
(714)765-4626
Quarter Section: 83
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(7141765 - 5153
Site Address: 100 S ANAHEIM BLVD 200-250, ANAHEIM, CA 92805
Legal Description: P BK 178 PG 22 PAR 1
APN: 03701437
Project Description: Change of Use: Suite 250: 6,677 sq ft to convert business office into a medical office with exam rooms, suspended
ceiling system, relocated demising wall and accessible restrooms. With mechanical, electrical and plumbing. Suite 200: 2,391 sq ft
absorbed from suite 250 and create opening in wall to incorporate added area.
Living Area:
Number of Stories: 3 Valuation:
590,000.00
Garage Area:
construction Types:
VB
Carport Area:
Occupancy Groups:
B, B, B, B
Balcony I Deck Area:
Fire Spnnklered:
yes
Cool Roof:
Total Fees paid for Permit:
26.138.30
People Associated with Project
Permit Applicant
Gregg Roseen
Owner
ANAHEIM HOLDINGS LLC
3200 INLAND EMPIRE BLVD 220
Engineer - Mechanical
Robert Harold Foster
14471 Chambers Rd 8104 Tustin, CA 92780
Contractor
ROSEEN BUILDERS INC
24 HAMMOND STE G200309301416057670 IRVINE, CA 92618
Architect
Niall F Saunders
2700 W Coast Highway 200 Newport Beach, CA 92663
Engineer- Electrical
Gary Edward Gray
3188 Shriver Or San Jose, CA 95132
Type Electrical
Fixtures City Type
Plumbing Fixtures City Mechanical Fixtures Qty
Conduit and Conductors - per 50 ft. 16 Bar Sink
7 Commercial System per 1.000 sq. 0. 7
Receptacle, switches, lights
465 Cleanout
17
Drinking Fountain 1
Floor Drain 1
Floor Sink 1
Lavatory 3
Sewer per 100 ft. 2
Shower 1
Water Closet 3
Water Heater 1
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
Nf,HEIM Cq
Cityof Anaheim D� P `��
Building Division F 2
u >
�OLNDEO ta"^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
•'� �'
Plumbing Final
Mechanical Final
-
Cross Connection Control (714) 766-4260
Engineering Final (714) 765.5126
INSPECTION
DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
S'
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 7655194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
ioned.
Building Final (714 765-5153)
last Inspection -Final Only After Above Completed
1
1
/
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Buildina Inspections
'alzo + v "`J`�•' ��� i
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoisUGirdets)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf.lBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
--
Rough Duct (Mechanical)
Rough Mechanical
( �?
Rough Electrical
P Q I
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow, (Testable Only)
Water Service
Roseen Builders
Incorporated
24 Hammond
Irvine, CA 92618
(949) 716-7900 Fax O49) 716-7901
TO: Niail Saun&rs
TO: Chris Beris
TO:
TO:
TO:
TO:
Request for Information
RF1 #: 4
Date: 10/8/2024
Project: OC GastroCare
Project #:
Email Niall Saunders <nialnarchitectsoo com>
Email Chris@architectsoc.com
Email
Email
Email
Email
1
During our box walk, the customer asked us to make some electrical changes at the exterior glass
wall. Our building insepector asked us for a letter from you approving these changes. see the
attached mark up showing the changes.
2
Please review the marked up drawing and stamp if you approve.
3
SENT BY: Dui
UA LB: w/6124
/
RECEIVED 9
REPLY:
BY. DATE: