621 S HARBOR BLVDPermit Types
BLD I ELE f MEC 4��q
X
Permit Number: BLD2025-00742
Issued: 02/13/2025
wWw.anaheim.net/building
(714)765-4626
Quarter Section: 73
SNe Address: 621 S HARBOR BLVD ANAHEIM, CA 92805
Legal Description: N TR 1453 BLK LOT 106
APN: 03617427
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Project Description: RerooE To remove and install (15) squares of composition shingles over (partial) area of house only.
Living Area. Number of Stones: 1 Valuation:
Garage Area'. Construction Types:
CarportArea: occupancy Groups:
Balcony / Deck Area: Fire Sprinklered:
Cool R.O. Total Fees paid for Permit:
People Associated with Project:
Contractor LOCAL SOCAL ROOFING 521 EADELE STREETANAHEIM, CA
Permit Applicant ANTHONY FGARCIA OWNER 521 E ADELE ST ANAHEIM, CA 92805
Owner BICKIYA, TARIQ A & ANISAH 2608 E MCKITTRICK PL
�-, -`shy ►. w
Type Electrical Fixtures City Type Plumbing Fixtures Qty Mechanical Fixtures
12,000.00
VB
360.56
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
?I EIM c
Cityof Anaheim OF PN d� O
Building Division _� i
• SOUNDED tah^
Do not occupvthis building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765.4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 7655041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-51194 (Allow 10 business days)
Setback/Forms/rrenches (Footings)
COA/Migation Measures
Do not install subtloor or pour Floor slab until the follwing applicable items have been
signed
Building Final (714 7655753)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Undernoor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed.
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)Lila)
Dr
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Somics Motor -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service