Loading...
621 S HARBOR BLVDPermit Types BLD I ELE f MEC 4��q X Permit Number: BLD2025-00742 Issued: 02/13/2025 wWw.anaheim.net/building (714)765-4626 Quarter Section: 73 SNe Address: 621 S HARBOR BLVD ANAHEIM, CA 92805 Legal Description: N TR 1453 BLK LOT 106 APN: 03617427 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: RerooE To remove and install (15) squares of composition shingles over (partial) area of house only. Living Area. Number of Stones: 1 Valuation: Garage Area'. Construction Types: CarportArea: occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool R.O. Total Fees paid for Permit: People Associated with Project: Contractor LOCAL SOCAL ROOFING 521 EADELE STREETANAHEIM, CA Permit Applicant ANTHONY FGARCIA OWNER 521 E ADELE ST ANAHEIM, CA 92805 Owner BICKIYA, TARIQ A & ANISAH 2608 E MCKITTRICK PL �-, -`shy ►. w Type Electrical Fixtures City Type Plumbing Fixtures Qty Mechanical Fixtures 12,000.00 VB 360.56 The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. ?I EIM c Cityof Anaheim OF PN d� O Building Division _� i • SOUNDED tah^ Do not occupvthis building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 7655041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-51194 (Allow 10 business days) Setback/Forms/rrenches (Footings) COA/Migation Measures Do not install subtloor or pour Floor slab until the follwing applicable items have been signed Building Final (714 7655753) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Undernoor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been signed. 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame)Lila) Dr Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Somics Motor -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service