Loading...
216 N LINDSEY STPermit Types BLD ELE MEC PLM X Permit Number: BLD2025-00817 Issued: 02/19/2025 www. anaheim. net/building (714)765-4626 Quarter Section: 39 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 216 N LINDSAY STANAHEIM, CA 92801 Legal Description: N TR 1851 1 LOT 59 APW 07245110 Project Description: Reroof: To remove and install (22) squares of composition shingles over house and attached garage Living Area: Number of Stones: 1 Valuatbn: 6,000.00 Garage Area: Construction Types: VB Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Bpnnklered: Cool Roof: Total Fees paid for Permit: 360.04 People Associated with Project: Contractor JOURNEY BUILDERS 3111 WINONAAVE UNIT 103 BURBANK, CA Permit Applicant Le von Gazdzhyan Owner STANLEY, ROBERT L TR 216 N LINDSAY Type Electrical Fixtures Oly Type Plumbing Futures Oty Mechanical Fixtures Oty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. �PHEIM C1 Cityof Anaheim OFP <,O Building Division _� i OVNDED tad^ Do not occupy this buildina until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are releaser+. Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete unfit the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765d591 Electrical Ground Electrode/Ufer Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour Floor slab until the follwing applicable items have been Building Final (714 7653153) Lest Inspection -Final Only After Above Completed Plumbing (GroundlUnderfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girdere) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have tat Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) / Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. 8 Fire Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New rnnntrointinn Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service