Loading...
140 S HARBORPermit Types BLD ELE MEC PLM X X Permit Number: BLD2024-05781 Issued: 12/24/2024 www.anatheim.net/building (714)765-4626 Quarter Section: 72 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 140 S HARBOR BLVD Anaheim, CA 92805 Legal Description: N TR 16606 BLK LOT 1 UN 108 TRACT 16606, LOT 1 OF APN: 93823318 _ Project Description: Residential Remodel: Construct (2) non-loadbearing walls to create new office on first floor. Living Area: Numberof Stories: 2 Valuation: 3.000.00 Garage Area: Construction Types: VS Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Sprir lend: No Cool Roof: Total Fees paid for Permit: 1,598.M People Associated with Project: Permit Applicant Cesar Aguilar Owner AGUILAR, CESAR 174 W LINCOLN AVE 243 Type Electrical Fixtures Qty Type Plumbing Fixtures City Mechanical Fixtures City Receptacle, switches, lights 4 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. t•N�H Elm rqC City of Anaheim DF io Building Division h i NEED ts�^ Do not occupy this buildina until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final 0 a 7;1 Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Formsfrrenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have beensioned Building Final (714 765.5153) Last Inspection -Final Only After Above Completed 3//`A" ` L7 Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (CompactionlMembrane Reinf.) Floor (JoistiGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele., Mac. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mee.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service