Loading...
269 N PASEO RIO BLANCOPermit Types BLD ELE MEC PLM X Permit Number: BLD202540833 Issued: 02/20/2025 www.anaheim.net(build i ng (714)765-4626 Quarter Section: 190 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141 765 •5153 Site Address: 269 N PASEO RIO BLANCO ANAHEIM, CA 92807 Legal Description: N TR 8080 BLK LOT 35 APN: 35814338 Project Description: Reroof: To remove and install (25) squares of composition shingles over house and attached garage Living Area: Number of Stories: 1 Valuation: 12,804.00 Garage Area: construction Types: VS Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Roof Tou it Fees paid for Permit: 360.66 People Associated with Project: Contractor DIAZ TOP ROOFING SERVICES 2051 E CERRITOS AVE #8C ANAHEIM, CA Owner TAKEMOTO, DWIGHT 8 YVETTE 269 N PASEO RIO BLANCO Type Electrical Fixtures Cry Type Plumbing Fixtures Cry Mechanical Fixtures Oty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. '�I,.V M C Cityof Anaheim p� io Building Division ' i u a �0 IVDEV tah^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lie. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (714 765-5153) Last Inspection -Final Only After Above Completed I() t Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been saned list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) r� - Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg_ Ele., Mec. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed. Drywall Drywall Penetrations (Ele, Mae & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Crinntrurtion Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not nffi Sewer Water Engineering Backflow (Testable Only) Water Service