276 N DALTON DR (3)Permit Types
CITY OF ANAHEIM
BLD
ELE
MEG
PLM
X
BUILDING DIVISION
Permit Number: BLD2025.00599 200 S. ANAHEIM BLVD.
Issued: 02/05/2025 (714) 765 -5153
www.anaheim.net/building
(714)765-4626
Quarter Section: 167
Site Address: 276 N DALTON DRANAHEIM, CA92807
Legal Description: N TR 17879 BLK LOT 55
APN: 35922221
Project Description: Electrical for EV Charger inside the garage
Living Area. Number of stories: 1
Valuation: 0.00
Garage Area.
Construction Types: NIA
Carport Area:
Occupancy Groups:
Balcony Deck Area:
Fire sprinklered:
Cool Roof: Total Fees paid for Pwmh: 177A0
People Associated with Project:
Contractor NATION ELECTRIC AND CONSTRUCTION INC 3415 S SEPULVEDA BLVD,STE 1147202106281213255688 LOS ANGELES, CA 90211
Permit Applicant Jesus Gonzalez
Owner OLIVER-MANDVIWALA, MELINDA 276 N DALTON DR
Type Electrical Fixtures Qty Type Plumbing Fixtures
Qty Mechanical Fixtures Qly
EV Charger 1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
PNptt EIM Cq<
Cityof Anaheim C io
Building Division _F i
u >
�OVNOEO tah�
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 7664280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7654591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subFloor or pour floor slab until the follwing applicable items have been
stonedBuilding
Final (714 765.5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele-, Mec. & Fire)
Insulation (Sound/Energy)
Co not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do nor hackfill unless stoned off I
Sewer
Water Engineering Backflow (Testable Only)
Water Service