925 S WEIR CANYON RD (4)Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2024.02585
Issued: 12/19/2024
www.anaheim.net/building
(714)765-4626
Quarter Section: 226
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Site Address: 925 S WEIR CANYON RD, ANAHEIM, CA 92808
Legal Description: N TR 12992 BLK LOT 62
APN: 35438140
Project Description: Antenna Cell Site: Modification to existing cell site for "AT&T'.
Living Area: Number of Stories:
0 Valuation: 20,000.00
Garage Area:
Construction Types: NIA
Carport Area:
Occupancy Groups:
Balcony I Deck Area:
Fire Spdnklered:
Cool Root.
Total Fees paid for Permit: 855.60
People Associated with Project:
Contractor STC NETCOM INC
11611 INDUSTRY AVE199912161418559410 FONTANA, CA 92337
Permit Applicant Jeffrey Kinne
Owner CITY OF ANAHEIM
P O BOX 3222
Engineer - Civil CHRIS S LEE
27758 SANTA MARGARITA PKWY STE 238 MISSION VIEJO, CA 92691
Type Electrical Fixtures Cry Type Plumbing Fixtures Qty Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
ar, MIN! �'
City of Anaheim o4 P `v0
Building Division _� i
u s
• A0-- �b
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable Items below must be signed Ixefore utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 7655126
Fire Sprinkler (ONLY) (714) 765.5041
INSPECTION
I DATE
I INSPECTOR
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 766.5041
Plumbing (Ground/Underfloor Drain Waste)
Electrical Ground Electrode/Ufer
Water Engineering (714) 765-4591
Sub LfstlBus. Lic. (714) 765.5194 (Allow 10 business days)
Setback/Fonns/Trenches (Footings)
COA/Migation Measures
Do not Install subfloor or pour floor slab until the fo lmng applicable Rerrns have '
Building Final (714 7655153) J*c
laetYrpecdowlibrd brill' Allier Above completed
Plumbing (GroundNnderfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoistlGirders)
Undernoor Insulation (Raised Foundation Only)
_
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below una, the following appbceW Rernu have
been
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Forme)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Pbg., Ele., Mec. 8 Fire)
Insulation (SoundlEnergy)
Do not tape or Plaster until the following applicable Rams have been signed:
Drywall
Drywall Penetrations (Ele, Mec 8 Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
(Do not backfill unless s oned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service