405 S VALLEY ST (8)Permit Types
SO
BUD
ELE
MEC
PLM
CITY
OF ANAHEIM
X
BUILDING DIVISION
Permit Number: BLD2025-00243
200 S. ANAHEIM BLVD.
4D
Issued: 02/05/2025
(714) 765 - 5153
www.anaheim.net/building
(714)765-4626
Quarter Section: 40
Site Address: 405 S VALLEY STANAHEIM, CA 92804
Legal Description: N TR 2369 BLK LOT 9
APN: 12816502
Project Description: Seismic Upgrade: Voluntary seismic retrofit
Living Area: Number of Stories:
t Valuation:
3.960.00
Garage Area:
Construction Types:
NIA
CarportArea:
Occupancy Groups:
Balcony / DeckArea:
Fire Spruklered:
Cool Floor.
Total Fees paid for Pemrit:
407.51
People Associated with Project:
Contractor UNIQUE HOME REMODELING CO
1500 ROSENCRANS AVE STE 500 MANHATTAN BEACH, CA
Permit Applicant EFRAIM NIAKAN
1500 Rosecrans Ave. Suite 500 Manhattan Beach, CA 90266
Owner SOTO, MARIA
405 S VALLEY ST
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new penult is required to commence or continue work.
y
N11 EIM C�
City of Anaheim D� P <'�
Building Division _� i
>
• �DUNDEO t6`'^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground ElectrodelUfer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sionad
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
^-.
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed
1st Floor Shear
Firesprinkler(Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Dud (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA1Mitagation Measures
Plumbing Inspections
Framing iOni,, ar,er Plbg.. Ele., Mec & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed.
Drywall
Drywall Penetrations (Ele, Mee & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service