Loading...
230 N AVENIDA MALAGA (2)Permit Types LLD LE MEC PLM X X X X Permit Number: BLD2024-06372 Issued: 01/13/2025 CITY OF ANAHEIM www.anaheim.net/building (714)765-4626 Quarter Section: 196 Site Address: 230 N AVENIDA MALAGAANAHEIM, CA 92808 Legal Description: N TR 7735 BLK LOT 23 APN: 35823102 BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Project Description: Residential Remodel: 225 sq ft remodel of kitchen to include demolition of load bearing wall and install new beam. Living Area: Number of Stones: 1 Valuation: 40,0011 Garage Area, Construction Types: VB Carpon Area: Occupancy Groups: Balcony / Deck Area: Fire Spnnklered: No Cool Root: Total Fees paid for Peri 1,44oSo People Associated with Project: Contractor SMITH &AMP; BRECKENRIDGE INC OBA CUST P O BOX 580 YORBA LINDA, CA 92887 Permit Applicant Ted Lent Owner FRYXELL, RAYMOND J JR TR 230 N AVENIDA MALAGA Engineer Phong Twong na na, CA 0 Type Electrical Fixtures Cry Type Plumbing Fixtures Qty Mechanical Fixtures Cry Receptacle, switches, lights 1 Dishwasher 1 Residential Registers (ducts) 1 1 Ventilation Fan - <- 300 cfm on single duct 1 Garbage Disposal Gas System (outlets) Kitchen Sink The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit Is required to commence or continue work. P�pHEIM C.'` City of Anaheim o4 io Building Division F y OVNDED ts4 Do not occupvthis buildina until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test I9 z Electrical Final - Plumbing Final -3 iiyvb7PAli Mechanical Final a3�ry Cross Connection Control (714) 765-4280 Engineering Final (714) 765-6126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765.5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COAJMigation Measures Do not install subFloor or pour Floor slab until the follwing applicable items have been sianed Building Final (714765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinli Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) 2� �- Rough Duct (Mechanical) Rough Mechanical yt Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing -1mv after Plbg_ Ele.. Mec_ & Fire) �7,(,y- ry-K Insulation (Sound/Energy) '(.r( TG V",- ❑o not tape or plaster until the following applicable items have been signed: Drywall 7-(3 7,� Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 23 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless sinned off) Sewer Water Engineering Backflow (Testable Only) Water Service