Permit Number: BLD202540477
Issued: 01/30/2025
www.anahei m. net/bu i Iding
(714)765-4626
Quarter Section: 20
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
rn
4W <e
A
Site Address: 227 S TOLA PL ANAHEIM, CA 92804
Legal Description: N TR 2832 BLK LOT 22
APN: 12657125 _�,as.�,._
Project Description: Residential Remodel: To remove and install (1) square of drywall. Electrical for 200amp Main Service and (7)
receptacles. Mechanical to replace (1) exhaust fan. Plumbing to replace (1) gas line directly from the meter to the kitchen, Repipe using
PEX for bathroom and repair kitchen drain line using ABS
Lining Area: Number of Stones: 1 Valuation:
20.000.00
Garage Area: Construction Types:
Ve
Carport Area: Occupancy Groups.
Balcony / Deck Area: Fire Sprinklered:
Cool Roof: Total Fees paid for Permit:
706.60
People Associated with Project:
Contractor HORIZON CONSTRUCTION & REMODELIN 614 SOUTH EUCLID STREET201101251320140080 FULLERTON, CA 92832
Permit Applicant Daisy Sarmiento
Owner WILSON, GLENN ATR 227 S TOLA PL
Type Electrical Fixtures Oty Type Plumbing Fixtures City Mechanical Fixtures
City
Meter/Disc Sw - Under 600 V, up to 200 1 Gas System (outlets) 1 Ventilation Fan - <_ 300 cfm on single duct
1
amps Repair/Drainage AlterationtVent Piping 1
Receptacle, switches, lights 7
Water Distribution 1
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
PaPHEtM C1,
;, ity of Anaheim DF iO
Building Division F 2
• �DGNDED tad^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
Alt applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/FormslTrenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned
Building Final 7655153)
Last Inspection -Final Only After Above Completed
q7
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed
list Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond BeamlPre-Grout)
Rough Plumbing (Top Out) 2
y -1.j
iir—C
Rough Duct (Mechanical)
Rough Mechanical L
6
Rough Electrical
_
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg_ Ele.. Mec. & Fire) 2
/
G- - zs
r
Gam" C-
Insulation (Sound/Energy)
1 - 2 -
C— r,
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-:
business days after approval) Excludes Newenrignirtion
7-zS
V
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
On not hackfill unless gioned off)
Sewer
Water Engineering Backflow (Testable Only)