Loading...
300 S LAXORE ST (4)Permit Types BLD ELE MEC PLM CITY OF ANAHEIM X BUILDING DIVISION Permit Number: BLD2025-01309 200 S. ANAHEIM BLVD. Issued: 03/18/2025 (714)765. 5153 vivivicanaheim.net/building (714)765-4626 Quarter Section. 13 Site Address: 300 S LAXORE STANAHEIM, CA 92804 Legal Description: N TR 2655 BLK LOT 55 APN: 12610216 Project Description: Reroof. Remove and install (23) sq of composition shingles over the house and attached garage Living Area: Numberef Slones: 1 Valuation: Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Sponklered: Cool Roof. Total Fees paid for Permit: People Associated with Project: Permit Applicant Dion Coleman Owner DE, VANCE SONDRA TR 300 S LAXORE ST 6.000.00 NIA 359.78 Type Electrical Fixtures City Type Plumbing Fixtures City Mechanical Fixtures Cry The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the dale of permit Issuance. A new permit is required to commence or continue work. Nn1{EIM �� Cityof Anaheim D4 t^ `��O s' Building Division F Z u > SOUNDED vas^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 7664280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow, 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sianed Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Zi Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been stoned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele.. Mec. 8 Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec 8 Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service