Loading...
716 N FAIRHAVEN ST (3)Permit Types BLD E MEC PLM X Permi!'Number: BLD202405624 Issued: 12/23/2024 www.anaheim. nettbuild ing (714)765-4626 Quarter Section: 45 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 716 N FAIRHAVEN ST, Anaheim, CA 92801 Legal Description: N TR 5226 BLK LOT 131 ' " "- APN:27203317 M Project Description: Residential Remodel: Repair damaged wall and install (250) sq. fL of stucco and (200) sq. ft. of drywall in living room area. Living Area: Number of Stories: 1 Valuation: 24.000.00 Garage Area: Construction Types: VS Carport Area: Occupancy Groups: Balcony I Deck Area: Fire Spnnklereo Cool Roof: Total Fees paid for Permit: 1.394.12 People Associated with Project: Contractor FRC RESTORATION INC DBA FREEDOM REST 1521 E MCFADDEN AVE STE B SANTA ANA, CA 92887 Permit Applicant Jaime Herrera Owner WONG. YUKI 716 N FAIRHAVEN ST Type Electrical Fixtures Oty Type Plumbing Fixtures Cry Mechanical Fixtures Oty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. PNhHEIM Cd< City of Anaheim 0� io Building Division z V > �0VNDrb It, Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are rNeaaed Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 766.4280 Engineering Final (714) 765-6126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete unit the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 7654591 Electrical Ground Electrode/Ufer Sub LisVBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not b ebeft sublloor or pour floor slab until the foliwing applicable tam have been -oned Building Final (714 765-5153) Log linspectlowFleal Only After Above completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (CompactionlMembrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable gem have been signed list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Forme) Masonry (Reinf.Bond BeamlPre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. d Fire)1 Insulation (Sound/Energy) L Do not tape or plaster until the following applicable items have been signed: Drywall r✓ Drywall Penetrations (Ele, Mac & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not backfill unless sioned off) Sewer Water Engineering Backfiow (Testable Only) Water Service