978 S SILVER STAR WAY (4)Permit Types
BLD 1 ELE MEC PLM
X
Permit Number: 8L01023-009"
Issued: 02/27/2023
Online
CITY OF ANAHEIM
www.anahern.nel/building
(714)7654626
Quarter Section: 227
Site Address: 978 S SILVER STAR WAY, ANAHEIM, CA 92808
Legal Description: N TR 14191 BLK LOT 17
APN: 35447148
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(7141 765 - 5153
Project Description: Residential EV Charger Level 2
Living Area'. Number of Stories: Valuation: coo
Garage Area'. Construction Types:
Carport Area: Occupancy Groups:
Balcony i Deck Area: Fire Sprinklered:
Cool Roof. Total Fees paid for permit: 0,00
People Associated with Project:
Contractor EV PROS INC PO BOX 4220 COSTA MESA, CA 92626
Permit Applicant Russell Collins
Type Electrical Fixtures City Type Plumbing Fixtures Cry Mechanical Fixtures Qty
EV Charger 1
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
P�pH EfM - ,
City of Anaheim p� io
Building Division h 132
�oUNOEV tsh^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sinnedBuilding
Final 1714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (JoistlGirders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sipped
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing IOnly after Plbg Ere %lec & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow, (Testable Only)
Water Service
�( /d J L); lur/K 3 IDS' INN , Idvvu
Pav-«I-* )5y171q�
a,�o ruNY
10 M"P�