Loading...
978 S SILVER STAR WAY (4)Permit Types BLD 1 ELE MEC PLM X Permit Number: 8L01023-009" Issued: 02/27/2023 Online CITY OF ANAHEIM www.anahern.nel/building (714)7654626 Quarter Section: 227 Site Address: 978 S SILVER STAR WAY, ANAHEIM, CA 92808 Legal Description: N TR 14191 BLK LOT 17 APN: 35447148 BUILDING DIVISION 200 S. ANAHEIM BLVD. (7141 765 - 5153 Project Description: Residential EV Charger Level 2 Living Area'. Number of Stories: Valuation: coo Garage Area'. Construction Types: Carport Area: Occupancy Groups: Balcony i Deck Area: Fire Sprinklered: Cool Roof. Total Fees paid for permit: 0,00 People Associated with Project: Contractor EV PROS INC PO BOX 4220 COSTA MESA, CA 92626 Permit Applicant Russell Collins Type Electrical Fixtures City Type Plumbing Fixtures Cry Mechanical Fixtures Qty EV Charger 1 The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. P�pH EfM - , City of Anaheim p� io Building Division h 132 �oUNOEV tsh^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sinnedBuilding Final 1714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoistlGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sipped 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing IOnly after Plbg Ere %lec & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow, (Testable Only) Water Service �( /d J L); lur/K 3 IDS' INN , Idvvu Pav-«I-* )5y171q� a,�o ruNY 10 M"P� /�P�,h Patel