Loading...
223 S ECHO ST (7)Permit Types BLD 1 ELE MEC PLM X Permit Number: SL02024-04358 Issued: 08/20/2024 www.anaheim. net/bu ilding (714)765-4626 Quarter Section: 47 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 Site Address: 223 S ECHO ST, Anaheim, CA 92804 Legal Description: N TR 2299 BLK LOT 74 -•- --' -^ APN: 12805606 Project Description: Patio Cover: 230 sq ft attached solid patio cover Living Area: Number of Stories: 0 Valuation: 2,750.00 Garage Area: Construction Types: N/A Carpon Area: Occupancy Groups: Balcony / Deck Area: Fire Spnnklered: No Cool Root. Total Fees paid for Permit: 408A0 People Associated with Project: Contractor TIMELESS CONSTRUCTION GROUP INC 6945 VAN NUYS BLVD VAN NUYS, CA Permit Applicant Hamazasb Sarkissian Owner GRINDELL, SHERRY L 223 S ECHO ST Type Electrical Fixtures City Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. P�pH Ell CSC City of An a h e i m O� iO Building Division i v a OVryDED ts�^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE IN All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765.5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 7655041 Plumbing (GroundlUnderfloor Drain Waste) Water Engineering (714) 765.4591 Electrical Ground ElectrodelUfer Sub LISVBus. Lic. (714) 765-5194 (Allow 10 business days) SetbacklFormslTrenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sianed Building Final (714765-5153) Last Inspection -Final Only After Above Completed I J l c Plumbing (GroundlUnderfloorWater) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoistIGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been stared list Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf.lBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed'. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service