Loading...
1961-6637RATE RESOLUTION NO. 6637 A, RESOLUTION OF THE CITY OOUNCIL OF THE CITY OF ANAHEIM AMENDING RESOLUTION NO. 4274 BY. AMENDING CERTAIN ITEMS OF THE RATE SCHEDULE ADOPTED BY SAID RESOLUTION NO. 4274. "GENERAL SERVICE SCHEDULE A 3 ANAHEIM —1— Finance Dir. Utilities Dir. WHEREAS, several customers have requested service on a basis at 277 -480 V, 4 wire installations; and WHEREAS, Resolution No. 4274 does not allow for such 277 -480 V, 4 wire installation; and WHEREAS, certain other clauses and provisions of Reso- lution No. 4274 require amendment for efficient operation of the electrical system of the City of Anaheim; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Anaheim that Resolution No. 4274 be amended in the following particulars: A. "GENERAL SERVICE SCHEDULE A 3 ANAHEIM" set forth at page 4.of said Resolution No. 4274 is hereby amended to read as follows: SERVICE Applicable to all consumers of general service with or without power service. BLOCK RATE (A) First 12 KWH or less, per meter per month $1.10 Next 88 KWH per meter per month 4.4e per KWH Next 400 KWH per meter per month 4.3e per KWH Next 1000 KWH per meter per month 3.2i per KWH Next 1500 KWH per meter per month 2.3e per KWH All excess KWH per meter per month 2.0¢ per KWH DEMAND METER RATE (B) Available by guaranteeing minimum billing demand of 20 KW per month. First 150 KWH per month per KW of billing demand..Rate (A) Next 150 KWH per month per KW of billing demand..per KWH 1.3i All excess KWH per month per KW of billing demand..per KWH 1.0i DEMAND METER RATE (C) Available by guaranteeing minimum billing demand of 100 KW per month. First 150 KWH per month per KW of billing demand First 15,000 KWH per month 2 6 e per KW All excess KWH per month 1 6 e per KW Next 150 KWH per month per KW of billing demand..0.8 ri per KW All excess KWH per month per KW of billing demand..0.65i per KW MINIMUM CHARGE RATE (A) #1 Single phase $1.10 per meter per month; for all power service connected in excess of 3 HP, an additional minimum charge of $1.25 per HP per month. X -ray apparatus cannot be served under this shedule, if 220 volts or over. #2 Three phase $5.00 per meter per month; for all power service connected in excess of 3 HP, an additional minimum charge of $1.25 per HP per month. RATE (B) AND (C) First 20 KW of billing demand..$40.00 per meter per month Next 30 KW of billing demand..$ 2.00 per KW per month All excess KW of billing demand..$ 1.50 per KW per month "SPECIAL CONDITIONS "VOLTAGE (A) Service to be rendered at one voltage only Rate A 120 or 120 -240 V single phase, three phase 240 V only Rate B 240- -480 V single phase, 240 -480 V three phase Rate C 240- -480 V three phase Service may be supplied at 120/208 V, 4 wire wye or at 277/480 V 4 wire wye where: 1. permission is granted by the City. 2. customer guarantees monthly billing demand of 125 KW for 120/208 V or 300 KW for 277/480 V. 3. provides space acceptable to the City on the premises to allow for the installation of the City's facilities 4. customer shall guarantee to take service from such installation for a minimum of 5 years from date of any installation of new or added service. 5. obtains written consent of owner of property if service is underground. (B) The billing demand in any month shall be the average kilowatt input indicated or recorded by instruments to be supplied, owned and maintained by the City and at the City's expense upon the consumer's premises adjacent to the watthour meter, in the 15 minute interval in which the consumption of electric energy is greater than in any other 15-minute interval in the month, but not less than either (1) 50% of the contracted for loed, or (2) 50% of the highest billing demand in the preceding eleven months, whichever is the greater. However, in no case shall the billing demand be less than the guaranteed billing demand. Billing demand shall be determined to the nearest 1 /10 KW. (C) Under Rate C, the following may be applicative. (1) The billing demand may be based on a thirty minute interval at the option of the City. (2) If customer takes service and metering at primary voltage (2 to 11 KV) and supplies his own trans- formers, if necessary, the gross bill will be re- duced by 10 cents per KW of demand in excess of the guarantee. (3) Power Factor: When the billing demand is not less than 200 KW, a power factor adjustment will be made as follows The total charge for any month as computed will be decreased or increased by 0.1% for each 1% that the average power factor of customer's load in that month was greater or less than 85 such power factor to be computed (to the nearest whole per cent) from the ratio of lagging kilovolt- ampere -hours to kilowatt -hours consumed in the month. -2- (D) Where the demand is intermittent or subjected to violent fluctuations, the maximum demand may be based on a five minute interval. (E) No adjustments will be made for any temporary re- duction in load. Any customer who resumes service within twelve months must pay all charges that would have been billed, had service been continuous." B. "RULES REGULATIONS" dealing with "Phase and Voltage Specifications: Single -phase Service" as set forth on Page 11 of said Resolution No. 4274 is amended to read as follows: "RULES REGULATIONS Phase and Voltage Specifications: Single -phase Service Allowed Voltage Minimum Load Required Maximum Load A Power: 120 Volts None 1 -15 Amp and 1 -20 branch circuit 120/24.0 over 1 -15 Amp 1 -20 Amp 400 Amp Main Swit branch circuit 240 Volts None 400 Amp Main Switc 400 Volts As specified in Rate Schedules 200 Amp X -ray As specified in Rate Schedules B Motors: Ti -Installation consisting of one motor 120 Volts None 1/2 HP 240 Volts None 5 HP 4880 Volts As specified in Rate Schedules 10 HP (2) For a group of motors, the voltage shall be in accordance with specification for the largest motor of the group. C Lighting is supplied at 120 or 120/240 volts, single phase, except where otherwise specified in rate schedules. D Single phase may be supplied to installations having pro- posed main service switch in excess of the switch capa- cities specified above, provided approval of the City has been obtained, and will be supplied by one of the follow- ing methods as determined by the Citys (1) From two or three separate 120/240 volt service connections. Energy so supplied may be measured through one meter. The connected load on any service connection shall not be greater than twice that of any other service connection. (2) From one 120/240 volt connection, where the pro- posed main switch does not exceed 600 amperes capacity." -3- C. "RULES REGULATIONS" dealing with "Phase and Voltage Specifications: Three Phase Service" as set forth on Page 11 of Resolution No. 4274 is amended to read as follows: "RULES REGULATIONS Phase and Voltage Specifications: Three Phase Service A Power and Motor Service: V Minimum Load Required Maximum Load Allowed 21 0 Vol t 3 HP 1000 KVA 4 0 Volt As specified in Rate Schedules 2000 KVA B Service to all loads of 1000 KVA or over must be approved by the City as to adequacy of facilities for service. C 120/208 Volt Three Phase Three Phase 4 wire wye connected service (1) Original Installation Volta e Minimum Load Allowed Maximum Load Allowec 120 2uo Volts 125 KW 750 KVA 4 wire 3 phase (2) Subsequent Connections 120 Volt None 120/208 Volt Over 1 -15 Amp and 1 -20 3 wire 1 -phase branch circuits 120/208 Volt as specified in Rate 4 wire 3 -phase Schedule D 277/480 Volt Three Phase 4 Wire Wye Voltage Minimum Load Allowed 277/L!o0 Volt 300 KW Standard power voltage is 240 Volts, unless specified otherwise in Rate Schedules. The voltages available at any particular location should be ascertained by inquiry at the Office of the Utilities Director. If voltages other than that requested are available from existing transformers, the City shall not be obligated to supply any other voltage, unless customer assumes a billing demand based on the KVA size of the transformers necessary to serve the load requested. All load on a three phase service must be kept in balance between phases in accordance with good engineering practice. Provision must be made for installing a kilovar -hour meter on all installations requiring a m *in switch of 600 amperes at 240 Volts or 400 amperes at 480 Volts. Customer must guarantee to take service for a minimum period of three years before City will install equipment 4 1 -15 Amp and 1 -20 Amp branch circuit Amp 100 amperes Main Switch to be determined by City Maximum Load Allowe+ to be determined by City to serve on 120/208 Volts, and customer must guarantee to take service for a minimum of five years before City will install equipment to serve on 277/480 Volts." BE IT FURTHER RESOLVED that except as specifically amended as before set forth, Resolution No. 4274 shall remain in full force and effect and, as above amended, Resolution No. 42 �4 from this date shall govern the rules for installations and the rates to be charged for electrical service in the City of Anaheim. THE FOREGOING RESOLUTION is approved and signed by me this 31st day of January, 1961. (SEAL) STATE OF CALIFORNIA COUNTY OF ORANGE ss. CITY OF ANAHEIM I, DENE M. WILLIAMS, City Clerk of the City of Anaheim, do hereby certify that the foregoing resolution was passed and adopted at a regular meeting of the City Council held on the 31st day of January, 1961, by the following vote of the members thereof: AYES: COUNCILMEN: Chandler, Coons, Fry and Schutte NOES: COUNCILMEN: None ABSENT: COUNCILMEN: Thompson AND I FURTHER CERTIFY that the Mayor of the City of Anaheim approved and signed said resolution on the 31st day of January, 1961. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of the City of Anaheim this 31st day of January, 1961. CLERK OF E ITY OF ANAHEIM