RES-2025-041RESOLUTION NO. 2025- 041 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ANAHEIM ADOPTING THE FY 2025-26 PROJECT LIST FOR THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017 WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017 to address the significant multi -modal transportation funding shortfalls statewide; and WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of our City are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; and WHEREAS, the City must adopt a list of all projects proposed to receive funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, in the City budget, which must include a description and the location of each project, a proposed schedule for the project's completion, and the estimated useful life of the improvement; and WHEREAS, the City, will receive an estimated $9,087,347.00 in RMRA funding in FY 2025-26 from SB 1; and WHEREAS, this is the ninth year in which the City is receiving SB 1 funding and will enable the City to continue essential road maintenance and rehabilitation projects for the public; and WHEREAS, the City has obtained and considered public input into the City's project list; and WHEREAS, the City used a Pavement Management System to develop the SB 1 project list to ensure revenues are being used on the most high -priority and cost-effective projects that also meet the City's' priorities for transportation investment; and WHEREAS, the funding from SB 1 will help the City maintain and rehabilitate streets at five neighborhoods and seventeen arterial streets throughout the City in FY 2025-26; and WHEREAS, the SB 1 project list and overall investment in City's local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete street infrastructure, and using cutting -edge technology, materials and practices, will have significant positive benefits citywide NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Anaheim does hereby resolve as follows: 1. The foregoing recitals are true and correct. 2. The City of Anaheim is adopting the list of projects attached hereto as Exhibit "A" planned to be funded with Fiscal Year 2025-26 with Road Maintenance and Rehabilitation Account Act revenues, which includes new and relisted projects. 3. The City of Anaheim hereby adopts the Fiscal Year 2025-26 project list in Exhibit "A." THE FOREGOING RESOLUTION is approved and adopted by the City Council of the City of Anaheim this. 2.9, _ day of May , 2025, by the following roll -call vote: AYES: Mayor Aitken and Council Members Meeks, Balius, Leon, Rubalcava, Kurtz and Maahs NOES: None ABSENT: None ABSTAIN: None CITY OF ATTEST: 1 CITY CLERK OF THE CITY OF ANAHEIM 151U4.2 ASSISTANT R" TY OF ANAHEIM EXHIBIT "A" City of Anaheim FISCAL YEAR 2025-26 PROJECT LIST FOR THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017 Project Unit No. Tracker PROJECT TITLE Pre -Construction Schedule Construction Schedule Estimated UsefulLifeted Protect Description Protect Location IDa ESNmated Start Estimated Estitd Estimated Start mae Date JMo-Yr) completion Date(Mo-yr) completion Dale lMo-Yr) Date Mo-Yr PROJECTS ADOPTED IN FY 2024-25 AND CARRIED OVER (RELISTED) FOR FY 2025-26 The project improvements include removing and reconstructing the pavement in the ((District 5)- BethJackson Neighborhood- bordered by Frontem Beth Jackson Neighborhood Street roadway, applying slurry seal, replacing damaged areas of concrete (sidewalk, curb and Street to the north, the Santa Ana River to the east, Lincoln Avenue L239 I 2074 Rehabilitation N/A N/A Feb-25 Nov-25 7-20 years gutter, and access ramps), replacing signs, pavement striping and pavement markings. to the south, and the SR-57 freeway to the west I The project Improvements Include emoving and reconstructing the pavement in the (Districts 2 & 4) - Juno Neighborhood - bordered by Ball Road to Juno Neighborhood Street 1_300 2265 roadway, applying slurry seal, replacing damaged areas of concrete (sidewalk, curb and N/A N/A Jul-25 Feb-26 7.20 years the north, Walnut Street to the east, Katella Avenue to the south, Rehabilitation gutter, and access ramps), replacing signs, pavement striping and pavement markings. and Euclid Street to the west The project improvements include removing and reconstructing the pavement in the (District 4) -Norma Neighborhood - bordered by Katella Ayenue to Norma Neighborhood Street L301 2264 N/A N/A Jul-25 Feb-26 7-20 years roadway, applying slurry seal, replacing damaged areas of concrete (sidewalk, curb and the north, Harbor Boulevard to the east, Orangewood Avenue to Rehabilitation gutter, and access romps), replacing signs, pavement striping and pavement markings. the south, and Ninth Street to the west Plars, Specifications, and Estimates are being prepared during the Pre -Construction (District 3) - Harbor Boulevard from Lincoln Avenue to North Street L266 4237 Harbor Boulevard Rehabilitation period. The road rehabilitation work consists of cold planing, resurfacing the road with an Jun-24 May 25 Sep-25 Jan-26 SO-20 years asphalt concrete overlay, and the replacement of traffic striping, traffic signal loops, and r�avement markings. Plans, Specifications, and Estimates are being prepared during the Pre -Construction (District 2) - Ball Road from Magnolia Avenue to Gilbert Street L298 556E Ball Road Rehabilitation Apr-24 Jun-25 Oct-25 Feb-26 10-15 yearsperiod. The road rehabilitation work consists of cold planing, resurfacing the road with an ) asphalt concrete overlay, and the replacement oftraffic striping, traffic signal loops, and pavement markings. (Partnership with Sewer) NEW PROPOSED PROJECTS LISTED FOR FY 2025.25 The project Improvements include removing and reconstructing the pavement In the (District 2) - bordered by the 1-5 Freeway to the north, Euclid Way Monterrey Neighborhood Street L316 1313 N/A N/A Jan-26 Aug-26 7-20 years roadway, applying slurry seal, replacing damaged areas of concrete (sidewalk, curb and to the east, Lincoln Avenue to the south, and Belinda Circle to the Rehabilitation gutter, and access ramps), replacing signs, pavement striping and pavement markings. west The project improvements include removing and reconstructing the pavement in the (District 2) - bordered by Lincoln Avenue to the north, Gilbert Baker Neighborhood Street L319 1619 N/A N/A Jan-26 Aug-26 7-20 years roadway, applying slurry seal, replacing damaged areas of concrete (sidewalk, curb and Street to the east, Orange Avenue to the south, and Magnolia Rehabilitation gutter, and access ramps), replacing signs, pavement striping and pavement markings. Avenue to the west Plans, Specifications, and Estimates are being prepared during the Pre -Construction (District 1) - Magnolia Avenue from Lincoln Avenue to La Palma L302 5771 Magnolia Avenue Rehabilitation Nov-24 May-25 Sep-25 Jan-26 10-IS years period. The road rehabilitation work consists of cold planing, resurfacing the road with an Avenue asphalt concrete overlay, and the replacement of traffic striping, traffic signal loops, and pavement markinEs. Plans, Specifications, and Estimates are being prepared during the Pre -Construction (District 2)-Orange Avenue from Magnolia Avenue to Euclid Street L303 I 5772 Orange Avenue Rehabilitation Nov-24 May-25 Sep-25 Jan-26 10-15 years period. The road rehabilitation work consists of cold planing, resurfacing the road with an asphalt concrete overlay, and the replacement of traffic striping, traffic signal loops, and pavement markings. Plans, Specifications, and Estimates are being prepared during the Pre -Construction (District 3) - Broadway from Euclid Street to Harbor Boulevard L304 5766 Broadway Rehabilitation Nov-24 Aug-25 Doc-25 May-26 110-20 years period. The road rehabilitation work consists of cold planing, resurfacing the road with an asphalt concrete overlay, and the replacement of traffic striping, traffic signal loops, and pavement markings. i plans, Specifications, and Estimates are being prepared during the Pre -Construction (District 4) - Manchester Avenue from City Limit (South) to L305 5769 Manchester Avenue Rehabilitation Nov-24 Aug-25 Dee-25 May-26 10-20 years period. The road rehabilitation work consists of cold planing, resurfacing the road with an Anaheim Boulevard asphahconerete overlay, and the replacement oftraffic striping, traffic signal loops, and ., avement markln;:s. Page 1 Unit Na. Project Tracker PROJECT TITLE IDg Pre -Construction Schedule Construction Schedule Estimated Useful Life Project Description Project Location Estimated Start Estimated Estimated Start Estimated Date lMo-yr) Completion DetcrMo-yr' Date lMSY,J CemPletlen Date IMO-YI Plans, Specifications, and Estimates are being prepared duringthe Pre -Construction (District 5)- La Palma Avenue from White Star Avenue to Miller L306 5773 la Palma Avenue Rehabilitation Nov-24 May-25 Sep•25 Jan-26 1D-15 years period. The road rehabilitation work consists of cold planing, resurfacing the road with an Street asphalt concrete overlay, and the replacement of traffic striping, traffic signal loops, and pavement markings. _ Plans, Specifications, and Estimates are being prepared during the Pre -Construction (District 6) - Santa Ana Canyon Road from Imperial Highway to L307 5774 Santa Ana Canyon Road Nov-24 May-25 Sep-25 Jan-26 10-15 years period. The road rehabilitation work consists of cold planing, resurfacing the road with an Fairmont Boulevard Rehabilitation asphalt concrete overlay, and the replacement of traffic striping, traffic signal loops, and pavement markings. iPlans, Specifications, and Estimates are being prepared during the Pre -Construction (District 1) - Westem Ave from City Limit (North) to City Limit L-112 5794 Western Avenue Rehabilitation Apr-25 Mar-26 Jun-26 Oct-26 10-15 years period. The road rehabilitation work consists of cold planing, resurfacing the road with an (South) asphalt concrete overlay, and the replacement of traffic striping, traffic signal loops, and pavement markings. Plans, Specifications, and Estimates are being prepared during the Pre -Construction (District 3) - Anaheim Shores Drive from La Palma Avenue to Euclid i period, The road rehabilitation work consists of cold planing, resurfacing the road with an Street L319 5796 Anaheim Shores Drive Rehabilitation Apr-25 Mar-26 Jun-26 Oct-26 10-15 years asphalt concrete overlay, and the replacement of traffic striping, traffic signal loops, and pavem_ont_m_arkings. _ Plans, Specifications, and Estimates are being prepared duringthe Pre -Construction (District 3) - Harbor Boulevard from South Street to Lincoln Avenue L314 5799 Harbor Boulevard Rehabilitation Apr-25 Mar-26 Jun-26 Oct-26 10-15 years period. The road rehabilitation work consists of cold planing, resurfacing the road with an & from North Street to City Limit (North) asphalt concrete overlay, and the replacement of traffic striping, traffic signal loops, and pavementmarkins. _ Plans, Specifications, and Estimates are being prepared during the Pre -Construction (District 4) - Harbor Boulevard from Chapman Avenue to period. The road rehabilitation work consists of cold planing, resurfacing the road with an I Convention Way L315 5805 Harbor Boulevard Rehabilitation Apr-25 Mar-26 Jun-26 0c1[-26 10-15 years asphalt concrete overlay, and the replacement of traffic striping, traffic signal loops, and ,—MLrr markings. Plans, Specifications, and Estimates are being prepared duringthe Pre -Construction (District 5) - Placentia Avenue from State College Boulevard to the L316 5807 Placentia Avenue Rehabilitation Apr-25 Mar-26 Jun-25 Oct-26 10.15 years period. The road rehabilitation work consists of cold planing, resurfacing the road with an SR-91 Bridge asphalt concrete overlay, and the replacement of traffic striping, traffic signal loops, and Pavement markings. Miraloma Avenue,Van Buren Street; Plans, Specifications, and Estimates are being prepared during the Pre -Construction (District 6) - Mimloma Avenue (Miller Street to Van Buren Street); L317 5809 Coronado Street; Jefferson Street Apr-25 Mar-26 Jun-26 0ct-26 10-15 years period. The mad rehabilitation work consists of cold planing, resurfacing the road with an Van Buren Street (Miraloma Avenue to La Palma Avenue); Rehabilitation asphalt concrete overlay, and the replacement of traffic striping, traffic signal loops, and Coronado Street (Jefferson Street to Van Buren Street); Jefferson pavement markings. Street rTustin Avenue to Miraloma Avenue) Page 2 CLERK'S CERTIFICATE STATE OF CALIFORNIA ) COUNTY OF ORANGE ) ss. CITY OF ANAHEIM ) I, SUSANA BARRIOS, Assistant City Clerk of the City of Anaheim, do hereby certify that the foregoing is the original Resolution No. 2025-041 adopted at a regular meeting provided by law, of the Anaheim City Council held on the 29th day of May. 2025 by the following vote of the members thereof: AYES: Mayor Aitken and Council Members Meeks, Balius, Leon, Rubalcava, Kurtz and Maahs NOES: None ABSTAIN: None ABSENT: None IN WITNESS WHEREOF, I have hereunto set my hand this 30th day of May. 2025. ASSISTANT CITY CLERK OF THE CITY OF ANAHEIM (SEAL)