56R-3366 ~ RESOLUTION NO. 3366 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ANAHEIM MODIFYING P~SOLUTION NO. 3117 RELATING TO THE PREPARATION OF DETAILED PLANS AND SPECIFICATIONS BY JAMES M. MONTGOMERY FOR THE CONSTRUCTION OF TWO 4-MILLION GALLON EARTH EMBANKMENT TYPE, STEEL ROOF, WATER STORAGE RESERVOIRS AND A 4-THOUSAND GALLON PER l~NUTE CAPACITY PUMPING STATION FOR THE CITY OF ANAHEIM. WHEREAS, heretofore, on the 31st day of January, 1956, the City Council adopted Resolution No. 3117 authorizing James M. Montgomery, Consulting Engineer, to proceed with the preparation of the detailed plans and specifioations for the construction of two 4-million gallon earth embankment type, steel roof, water storage reservoirs and a 4-thousand gallon per minute capacity pumping station for the City of Anaheim; and WHEREAS, the said James M. Montgomery has prepared detailed plans and specifications for one of said two 4-million gallon reser- voirs and has submitted said plans and specifications to the City Council of the City of Anaheim; and WHEREAS, the City Council does find and determine that it is not necessary at this time to have detailed plans and specifica- tions prepared for the other 4-million gallon reservoir and for said 4-thousand gallon per minute capacity pumping station and that said Resolution No. 3117 should be modified by the elimination of the services therein provided for and the design and preparation of said plans and specifications and the performance of said work and all work in connection with said other 4-million gallon reservoir and said 4-thousand gallon per minute capacity pumping station. NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Anaheim that ~esolution No. 3117 adopted by the City Council on January 31, 1956 be, and the same is hereby, modified, and that the said James H. IVlontgomery, Consulting Engineer, of 15 North Oak- land Avenue, Pasadena, California be, and he is hereby, instructed to complete detailed plans and specifications for the oonstruction of one 4-million gallon earth embankment type, steel roof, water storage reservoir, instead of preparing plans for two such reservoirs and tr~t he be, and he is hereby, further instructed not to prepare plans for such additional reservoir and not to prepare detailed plans for the 4-thousand gallon per minute capaoity pumping station for the City of Anaheim as mentioned in said Resolution No. 3117. That said plans and specifications for said reservoir shall conform to all state and local regulations. Three sets of plans and specifications together with all copies required by public agencies, shall be furnished. All other copies required shall be furnished at actual cost of duplicating and bind plus a 50~ service charge. ~..""..,. BE IT FURTHER RESOLVED that said James M. Montgomery, Con- sulting Engineer, be and he is hereby, employed and instructed to perform the following services: (1) I~ke soil investigations to determine the bearing capacity and soil composition as a basis for design of the 4-million gallon earth embankment type reservoir to be constructed at the La Palma site. (2) Make detailed surveys as needed to augment cross sections and other available property data of the site provided by the Oity. -1- /,-... (3) Prepare detaileu plans and specifications for the construction of the 4-million gallon earth embankment type, steel roof, water storage reservoir, to be located on La Palma Avenue, including all bid sheets and legal forms necessary for the taking of bids. The plans and specifications shall conform to all state and local regulations. Three sets of plans and specifications, together with all copies required by pUblic agencies, shall be furnished. All other copies re- quired shall be furnished at actual cost of duplicating and binding, plus a 50% service charge. (4) Prepare contract documents, including de- tailed designs and specifications for said reservoir to be located on La Palma Avenue in the City of Anaheim, just west of the existing reservoir and pumping station. (5) To generally supervise the construction of said reservoir as and if required by the City of Anaheim, and to render assistanoe when required in the advertising and taking of bids and the awarding of contracts, in cheoking shop drawings and visits to the project during construction. (6) To make estimates of quantities and costs. ('7) To make analysis of bids received for the construction of said reservoir. (8) Upon completion of the project, the prepara- tion of II as-buil tll drawings from the informa- tion furnished by the resident engineer. Al"'" AND BE IT FURTHER RESOLVED that said James M. Montgomery, Consulting Engineer, s~~ll receive as full compensation for the services hereinbefore mentioned and described,for anion account of said 4-mil1ion gallon earth embankment type, steel roof, water storage reservoir, for the City of Anaheim, the following: (a) For said 4-million gallon earth embankment type reservoir to be located on La Palma Avenue in the City of Anaheim, just west of the existing storage reservoir and pumping station, the sum of $13,000.00, to be paid as hereinafter provided. (b) For preliminary work done prior to the modifi- cation of said Resolution No. 3117 and the change of plans by notification to said Engineer for work completed on the Loara Street reservoir, the sum of $2,200.00. (c) For preliminary work done and performed and ser- vices rendered prior to the change of plans and the modifications of said Resolution No. 3117 on the Loara Street pumping station, the sum of $1,000.00. -2- ,,............. That the above compensation for the services to be rendered for the 4-million gallon earth embankment type reser- voir shall be paid as follows: 20% of the amount mentioned above, upon completion of the work and services specified in paragraphs land 2 of this Resolution. 60% of the amount mentioned above, upon completion of the work and engineering services specified in paragraphs 3, 4 and 6 of this Resolution. 10% of the a~ount mentioned above when 50% of the construction of said reservoir has been completed. The final 10% of the amount mentioned above shall be paid upon completion of the construction of said reservoir and the final acceptance thereof by the City of Anaheim. The sums mentioned in subparagraphs (b) and (c) shall be paid to said Engineer forthwith. AND BE IT FURTHER RESOLVED that said Engineer shall furnish upon request, detailed supervision during construotion of said reservoir by furnishing the services of a resident engineer inspector at a per diem charge of $50.00 and addi- tional inspectors, if requested, at a ~er diem charge of $50.00 and surveyors at a per diem charge of $40.00, for the time actually devoted to inspection, etc., including all mileage and other normal expenses during the construction period. Except extended delays caused by fire, storm, flood or other acts of God, by war or acts of pUblic enemies, by the restriction in the use or procurement of, or inability to obtain materials, by strikes, by unusual delays in transportation or unavoidable casualties or any cause beyond the control or without the fault or neglect of the City. AND BE IT FURTHER RESOLVED that for any additional services rendered by the Engineer in connection with the following: (a) At the request of the City in connection with any other matter or any item of work not specified in the recitals hereof. (b) As a result of substantial changes ordered by the City in a nature or extent of any item of work. (c) As a result of the delinquency or insolvenoy of one or more of the contractors. - (d) As a result of fire, flood or other acts beyond the control of the Engineer, which by exercise of reasonable care and forethought, said Engineer could not reasonably have been expected to avoid. Said Engineer shall be entitled to the following compensation: A reasonable amount to be agreed upon by the City of Anaheim and said Engineer or, if the parties oannot agree, upon said amount, the actual payroll oost of the Engineer occasioned by reason of said -3- -- adtiitional services plus a sum equal to said payroll cost for overhead and services of saiti engineer. AND BE IT FURTHER RESOLVED that if, at any time, during the term of the employment of said Engineer, it is desired by the City to cancel the contra ct with said Engineer and an equi t- able adjustment cannot be arrived at between the City and said Engineer, or if the work should be suspendeci or abandoned before completion, the City shall pay to the Engineer, in full and final settlement for work performed prior thereto, the actual payroll cost of the Engineer to the time of such abandonment together with an amount equal to the payroll cost for overhead and ser- vices of said Engineer to the time of abandonment, provided, how- ever, that such payment llS in this paragraph provided, shall not exceed the installment payments up to the stage of completion as hereinabove set forth. THE FOREGOING RESOLUTION is si[,'TIed and approved by me, this 3rci day of July, 1956. . .. ) ) ~y~%liHE~{k-[~L,- ATTEST: ~f1fdRK~ ~/fHE1r~~A~ STATE OF CALIFORIHA COUNTY OF ORANGE ss. CITY OF ANAHEIM I, DENE M. WILLIAMS, City Clerk of the City of Anaheim, do hereby certify that the foregoing Resolution was passed and adopted at an adjourned regular meeting of the City Council held on the Jrd day of July, 1956, by the following vote of the members thereof: AYES: COUl'~CILIvlEN: Pearson, Fry, Schutte and Waer. NOES: COUNCILMEN: None. ABSENT: COUNCILfiiAN: Coons. M~D I FURTHER CERTIFY that the Mayor of the City of Anaheim signed and approved said Resolution on the 3rd day of JUly, 1956. IN WITNESS \'/lliREOF, I have hereunto s.et my hand and affixed the seal of the City of Anaheim this Jrd day of July, 19)6. - ~.~:;~?-.~~ . CITY CLERK OF -,],HE~ITY ot-XIf4nl -4-