Loading...
1953-2265RESOLUTION NO. 2265 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ANAHEIM APPROVING ROUTE NO. 1 ALONG LA PALMA AVENUE AS SET OUT IN THE REPORT OF HARRISON AND WOOLLEY, CONSULTING ENGINEERS, FOR ROUTE OF CARBON CANYON RELIEF CHANNEL THROUGH THE CITY OF ANAHEIM, AND REQUESTING IMMEDIATE PREPARA- TIONS OF PLANS AND SPECIFICATIONS THEREFOR. WHEREAS, Harrison and Woolley, Consulting Engineers, of Santa Ana, California, were employed to make a study of flood hazards in Carbon Canyon and the City of Anaheim, and to prepare and submit a preliminary report of a plan for the control of flood waters through the City of Anaheim; and WHEREAS, said Consulting Engineers have completed said studies and have prepared and submitted said preliminary report to the Board of Supervisors of the County of Orange; and WHEREAS, said Consulting Engineers have reported that Route No. 1 along La Palma Avenue, as set forth in said preliminary report, appears to be the most advantageous loca- tion for the construction of a Carbon Canyon relief channel for the control of flood waters through the City of Anaheim; and WHEREAS, the Board of Supervisors of Orange County has approved said Route No. 1 as set forth in said Engineers' preliminary report and has requested the City of Anaheim to approve the same; and WHEREAS, the City Council does find that said Route No. 1 as set forth in said Engineers' preliminary report is the most advantageous route for the construction of a flood control channel through the City of Anaheim, and that such a channel should be constructed immediately to eliminate hazards from the flood waters in the City of Anaheim from Carbon Canyon; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ANAHEIM that the preliminary report on the oon- trol of flood waters through the City of Anaheim, prepared by Harrison and Woolley, Consulting T;ngineers of Santa Ana, California, be, and the same is hereby, approved; and BE IT FURTHER RESOLVED that Route No. 1 along La Palma Avenue be, and the same is hereby, approved as the location for the construction of a Carbon Canyon relief ohan- nel for the control of flood waters through the City of Anaheim; and that the Board of Supervisors of Orange County be, and they are hereby, requested to proceed immediately with the preparation of detailed plans and specifications for the construction of a Oarbon Oanyon relief channel through the City of Anaheim, designated as "Route No. 1" in the Engineers' preliminary report on a plan for the control of flood waters through the City of Anaheim, prepared by Harrison and Woolley, Consulting Engineers; and -1- BE IT FURTHER RESOLVED that the City Clerk be, and he is hereby, authorized and direoted to certify and cause to be delivered to the Board of Supervisors a copy of this Resolution. THE FOREGOING RESOLUTION is signed and approved by me this 27th day of October, 1953. ATTEST: STATE OF CALIFORNIA COUNTY OF ORANGE ss CITY OF ANAHEIM I, CHARLES E. GRIFFITH, City Clerk of the City of Anaheim, do hereby certify that the foregoing Resolution was passed and adopted at a regular meeting of the City Council of the City of Anaheim, held on the 27th day of October, 1953, by the following vote of the members thereof: AYES: COUNCILMEN: Pearson, Wisser, Heying, Boney and Van Wagoner. NOES: COUNCILMEN: None ABSENT: COUNCILMEN: None AND I FURTHER CERTIFY that the Mayor of the City of Anaheim approved and signed said Resolution on the 27th day of October, 1953. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of the City of Anaheim this 27th day of October, 1953. (SEAL) 0 TY LERK OF T CI -2-