RESOLUTION NO. 1 geZ
A RESOLUTION OF THF City Council OF
THE CITY OF ANAHEIM FINALLY
ACCFPTING THE WORK AND COMPLETION OF UNIT III
OF THr' MAGNOLIA TRUNK S7vT AND PUPTPING PLANT
AND FoRC PAIN OF THF (RANG_T' COUNTY JOINT OUT
FALL S ER ON TH TFR1 S AND CONDITIONS HERE
INAFTFR SFT FORTH, AND ATTTHORIZING THE CITY
OF ANAHEIM, AS CONTRACTING AGENT F ^R T77
CITIES OF ANAHEIM, FULLFRTON, AND ORANGE', AND
FOR THE BUENA PARK, GARDT''N GRoVF, LA HABRA AND
PLACFNTIA SANITARY DISTRICTS, Tfl FILE A N ^TICF
OF COMPLETION, AND AUTHORIZING THE' PAYMFNT OF
THF BALANCE DUF THF CCNTRACTrRS IN A C ORDANCE
WITH THF CONTRACT DfCUMrNTS IT'D UPON THETFRETTS
AND :CORDITI ONS HFRT'I_ T PFCIF'ITTD.
WFPTRFAS, a contract was heretofore made and entered into
on the 26th day of January, 1951, by and between the City of Anaheim,
a municipal corporation, as contracting agent for the Cities of
Anaheim, Fullerton and Orange, and for the Buena Park, Garden Grove,
La Sabra and Placentia Sanitary Districts, pursuant to Resolutions
theretofore passed and adopted by said Cities and Sanitary Districts
and Charles T, Brown, doing business as Charles T. Brown Company, and
Paul Vukich, Jr., doing business as Paul Vukich Construction Company,
a joint venture, for the construction and completion of Unit III of
the Magnolia Trunk Sewer and Pumping Plant and Force Main and Pro-
ject, together with the appurtenances thereto of the Orange County
Joint Outfall Sewer, all in accordance with said contract and other
contract documents; and
WHFREAS, said contractors deem all work under said contract
for the construction of said Unit III to have been completed in
accordance with the contract documents, except that portion of Manhole
I, Bid Item No. 37, shown as Valve Box B, and the connecting 16" x
16" x 12" C. I. all Bell Y- Branch, together with the necessary cast
iron pipe, concrete thrust blocks, labor and equipment to make said
Manhole I Complete and in accordance with the plans and specifications
and also the construction of Mahole J, Bid Item No. 38, and have
notified the Chief Engineer of the said Cities and Sanitary Districts
of such completion; and
-1-
WHFRFAS, said contractors have requested said Cities and
Sanitary Districts to finally accept the work and the completion of
said Unit III of said Magnolia Trunk Sewer and Pumping Plant and
Force Main upon the terms and conditions hereinafter set forth, ex-
cept as to the materials, labor, and work to be furnished to complete
said Manholes I and J, and as to those items have offered to enter
into an agreement to complete them whenever so requested by said
Cities and Sanitary Districts through their contracting agent, the
City of Anaheim; and
?nrHFRr'AS, said Chief Engineer, Nat H. Neff, has notified
said Cities and Sanitary Districts that he has made and completed a
final inspection of the underground pipe and manhole structures in
Unit III of said Magnolia Trunk Sewer and Pumping Plant and Force
Main and has certified that there are twenty -four (24) joints of
pipe that have cracks of varying sizes and lengths therein; and
WF FRFPS, said contractors have agreed to repair said 24
joints.of pipe that have cracks therein and any others that may occur
in any portion of the line not heretofore repaired, at their own
expense, upon condition that the Cities and Sanitary Districts will
finally approve and accept the work and the completion of said Unit
III, with the exception of the completion of Manholes I and J, and
pay to the contractors the balance due them as provided in the con-
tract documents, except the sum of 4 '928.00, which they are to receive
for furnishing all the materials and labor and doing all the work
necessary to construct and complete said Manholes I and J, herein
above mentioned; that said contractors have agreed that the said
sum of c928.00 may be withheld from the amount due them until the
completion of said Manholes I and J, together with the appurtenances
thereto, and the performance by the contractors of all of the con-
tractors' obligations with respect thereto as provided by the plans
and specifications and in said contract dated January 2E, 1951; and
WHEREAS, the Chief Engineer of the Cities and Sanitary
-2-
Districts has notified the City of Anaheim, as contracting agent
for said Cities and Sanitary Districts, that he has made and com-
pleted a final inspection of the underground pipe and manhole
structures in Unit III of said Magnolia Trunk Sewer and Pumping
Plant and Force Main, and has certified in writing that all pro-
visions of the contract for the construction and completion of
said Unit III have been fully complied. with to his satisfaction,
except as to the repair of said 24 joints of pipe hereinabove
mentioned and the completion of Manholes I and J, and that he has
made a final and complete estimate as to the value of such work
done and materials furnished, and has certified the same to the
City of Anaheim, and has further certified that said work was done
and said Unit III completed, except for such repair work and said
Manholes I and J, on the
Anaheim
15th day of December 1951; and
WHFRTAS, the City Council of the City of
finds and determines that said contractors have
completed said Unit III in accordance with the provisions of the
contract and contract documents, except for the repair of said
24 joints of pipe and except for the completion of Manholes I
and J, and that said work should be finally accepted upon. the
terms and conditions herein specified and a
Notice of Completion
filed as soon as said repair work is completed and the payment
of the balance due said contractors, except the sum of x'928.00,
be authorized in accordance with the contract documents and the
terms and conditions set forth in this Resolution,
NOw, THFRFFCRF, Br IT RITOLVFD by the CITY COUNCIL
that all of the work and
OF THE CITY OF ANAHEIM
completion of Unit III of said Magnolia Trunk Sewer and Pumping
Plant and Force Main of the Orange County Joint Outfall Sewer,
together with the appurtenances thereto, by Charles T. Brown,
-3-
doing business as Charles 1 Brown Company, and Paul Vukich, Jr.
doing business as Paul Vukich Construction Company, a joint venture,
except the materials, labor and work necessary to construct and com-
plete, according to the plans and specifications, that portion of
manhole I, Bid Iteni No. 37, shown as Valve Box B and the connectin;
16" x 16" x 12" C.I. all Bell Y- Branch, together with the necessa. °7
cast iron pipe, concrete thrust blocks, labor and equipment to mEi71
said Manhole I complete and in accordance with the plans and sp
fications, and also to construct Manhole J, Bid Item No. 38 and to
complete such construction within a reasonable time after notifir=,
tion so to do by the Cities and Sanitary Districts, be and the
is hereby accepted upon the express condition that said eontracto
proceed immediately and complete, at their own cost and expense,
within five days after notice of final acceptance, the repair anc:
replacement of the 24 joints of 3" vitrified clay pipe found ancl
certified by the Chief Engineer of the Cities and tanitary District
to have cracks therein of varying size and length and upon the
further express condition that said contractors will repair and /or
replace, at their own cost and expense, any other joints of clay
pipe in any other portion of Unit III which have not heretofore
been jacketed or encased which may develop cracks within a period
of thirty days from the date of final acceptance or said work to
the satisfaction and approval of the Chief Engineer of said Cities
and unitary Districts; that the determination as to whether or not
such pipe shall be repaired or replaced shall be made by the Chief
Engineer of the Cities and Sanitary Districts; that all such pipe
shall be repaired by concrete reinforcing with a figure 6 cradle
as shown in Figure 6 on Page 14 of the Handbood of Vitrified Clay
Pipe of the Pacific Clay Products Institute, by excavation down
to the quarter point of the pipe and then encased with the figure
6 concrete cradle aforesaid, except all such pipe which in the
judgment of the Chief Engineer of the Cities and Sanitary Distric
is so badly damaged that it cannot be repaired by using a figur
6 concrete cradle as above outlined, which said pipe shall be ex-
cavated and replaced by sound, undamaged pipe approved by the Chief
Fngineer of the Cities and Sanitary Districts, which said pipe shall
be installed with a Typo Z cradle on a rock fill mattress 4/10 of
the diameter of the pipe, such pipe to be furnished without cost to
the Cities and Sanitary Districts.
All said clay pipe having cracks and repaired and used
as hereinabove set forth shall have such cracks filled with a
suitable solution of cold tar product to insure against gas leakage.
That all materials, equipment, supervision and labor'for the re-
pair and replacing of said pipe as hereinabove specified shall be
furnished by the contractors at their own cost and expense.
AND BF IT FURTHER RPSCLVFD that the acceptance of said
work and the completion of said Unit III be accepted subject to
and upon the further express condition that said contractors enter
into a contract with the City of Anaheim as contracting agent for
said Cities and Sanitary Districts in which said contractors shall
agree that upon request of the City of Anaheim, they will proceed
immediately to construct that portion of Manhole I, Bid Item No.
37 shown as Valve Box B and the connecting 16" x 16" x 1" C.I.
all Bell Y- Branch, together with the necessary cast iron pipe,
concrete thrust blocks, labor and equipment to make such Manhole
I complete and in accordance with the plans and specifications and
also to construct Manhole J, Bid Item No. 38 and to complete such
construction within a reasonable time after notification so to do
by the City of Anaheim.
AND BF IT FURTHER RnSCLVFD that upon the completion of
the repair and /or replacement work hereinabove required to be done
by said contractors at the time and in the manner herein specified
and upon the expiration of thirty -five days after the filing of
notice of completion, that said contractors be paid the balance
due them in accordance with the contract documents for the con-
-5-
struction, installation and completion of said Unit III, in accord-
ance with the plans and specifications and contract documents except
tr e sum of x`928.00, which shall only be paid to said contractors in
accordance with the contract documents 35 days after the completion
of said Ivlanholes I and J as herein provided., unless liens arc filed
by laborers or material men, in which event so much of the balance
due said contractors shall be withheld as shall be necessary to pay
and discharge said liens; that the acceptance by the contractors of
said payments made in accorc.anc with said final estimate of the
Chief Engineer of said Cities and c'anitary Districts shall operate
as and shall be a release to the contracting agency and said
and Sanitary r.istricts, their officers, agents and employees from
all claims and liabilities due the contractors for anything done
or furnished or withheld or for anything relating to the work or
any act or neglect of said Cities and nanitary ?istricts, their
officers, agents and employees excepting, only the right to payment
for labor, work and material to be furnished and done in the com-
pletion of Manholes I and J.
BF IT FURTHER R that the City of Anaheim, as con-
tracting agent for said Cities and Sanitary
is hereby authorized to make and enter into
contractors by its duly authorized officers
that portion of Manhole T_, Bid item No. 37,
and the connecting 16" x 16" x 12" C. I. all Bell Y- Branch, to-
gether with thL3 necessary cast iron pipe, concrete thrust blocks,
labor and equipment to make said Manhole I complete in accordance
with the plans and specifications and also to construct Manhole
J, Bid Item No. 38, and to complete such construction within a
reasonable time after notification so to do by the City of Anaheim,
and that upon the completion of said Manholes I and J and said
appurtenances thereto, and the performance by contractors of all
6-
Cities
Bistricts, be and it
an agreement with said
for the completion of
shown as Valve Box B
of the contractors' obligations with resp;ct thereto, as provided
by the plans and specifications and in said contract dated January
26, 1951, that said contractors be paid the sum of 6928.00.
BE' IT FURTHF'R RESOLVED that the City Council of the
City of Anaheim does hereby resolve and agree to
pay its pro rata share of the amount due said contractors in the
percentage or proportion heretofore determined and agreed upon by
and betwLen said Cities and Sanitary Districts; and
BE IT FURTHER RFSOLVFD that the City of Anaheim, as con-
tracting agent for said Cities and Sanitary Districts be, and it
is hereby authorized and directed to file a Notice; of Completion
as provided by law immediately upon the completion of the repair
and /or replacement of said 24 joints of pipe by said contractors,
as hereinabove provided, upon the filing of certificate of the
Chief Engineer that said repair and /or replacement work has been
done and completed as herein provided.
THE, FOREGOING RF'SOLUTION is signed and approved by me
this day of December, 1951.
STATE OF CALIFORNIA
COUNTY OF ORANGE ss
was passed and adopted at a regular meeting of the City Council of
1951, by the following vote of the members thereof:
AYES: COUNCILMEN: Pearson, Wisser and Heying.
NOES COUNCILMEN: None.
ABSENT: COUNCILMEN: Boney and Van Wagoner.
AND I FURTHER CERTIFY that the Mayor of the City of
Anaheim
the City of Anaheim
of
1951.
Anaheim
I) Charles E. Griffith
December
do hereby certify that the foregoing Resolution
signed and approved said Resolution on the 27th day
1951.
City Clerk of the City of
held on the 26th
day of December
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the
seal of the City of Anaheim this day of December
_0 i
CHARLES E. GRIFFI
z/
CITY CL:RK OF TAE CITY OF
Anaheim