RESOLUTION NO. i
A RESOLUTION OF TN. CITY COUNCIL OF THE CITY O
lTAH FINALLY ACCEPTING THE WORK AND COMPLETION
OF MANHOLES 1 AND J AND THE REPAIR WORK ON 24
JOINTS OF K.-INCH CLAY PIPE IN UNIT III OF THE
MAGNOLIA TRUNK SEWER AND PUMPING PLANT AND FORCE
MAIN OF THE ORANGE COUNTY JOINT OUTFALL SEWER.
5 WHEREAS, a contract was heretofore made and entered into
6 on the 28th day of January, 1951, by and between the City of Anaheim,
7 a municipal corporation, as contracting agent for the Cities of
8 Anaheim, Fullerton and Orange, and for the Buena Park, Garden Grove,
9 L a Habra and Placentia Sanitary Districts, pursuant to resolutions
10 theretofore passed and adopted by said Cities and Sanitary Districts
11 and Charles T. Brown, doing business as Charles T. Brown Company, and
12 Paul Vukich, Jr., doing business as Paul Vukich Construction Company,
131a joint venture, for the construction and completion of Unit III of
14 the Magnolia Trunk Sewer and Pumping Plant and Force Main and Project
15 together with the appurtenances thereto of the Orange County Joint
16 Outfall Sewer, all in accordance with said contract and other con-
171 tract documents; and
181 WHEREAS, said contractors have heretofore completed all of
19 the work and furnished all the materials necessary and required for
20 the construction and completion of said Unit III of Magnolia Trunk
21 Sewer and Pumping Plant and Force Main, except that portion of
22 Manhole I, Bid Item No. 37, shown as Valve Box 13, and the connecting
23 1611 x 16" x 12" C.I. all Bell YtBranch, together with the necessary
24 cast iron pipe, concrete thrust blocks, labor and equipment to make
25 said Manhole I complete and in accordance with the plans and speci-
26 fications and also the construction of Manhole J, Bid Item No. 38,
27 which work and completion of said Unit III, except the above, has
28 heretofore been duly accepted by said Cities and. Sanitary Districts;
29 an d
30 WHEREAS, since the date of acceptance of all other work
31 and the completion of said Unit III, said contractors have completed
32,that portion of Manhole I, Bid Item No. 37, shown as Valve Box B,
Hand the connecting 18" x 13" x 12" 0.1. all Bell Y-Branch, together
-1-
11 with the necessary cast iron pipe, concrete thrust blocks, labor and
2 equipment to make said Manhole 1 complete and in accordance with the
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
plans and specifications and also the construction of Manhole J, Bid
Item No. 38, and have notified the Chief Engineer of said Cities and
Sanitary Districts of such completion; and
WHEREAS, the acceptance of the work and completion of all
other portions of said Unit 111 was made upon the express understand-
ing and condition that said contractors would repair and/or re-olace,
at their own cost, any joints of clay pipe in any portion of said
Unit 111 which had not theretofore been Jacketed or encased which
developed cracks within a period of thirty days from date of final
acceptance of said work, and that such repair and/or replacement work
would be done to the satisfaction and approval of the Chief Engineer
of said. Cities and Sanitary Districts; that said acceptance was made
on the 7t1: day of January, 1952; and
WHEREAS, within said period of thirty days from and after
the 7th day of January, 1952, twenty-four (24) joints of said 39 inch
vitrified clay pipe were found to have cracks therein, in varying
size and loncth, and all such cracked joints of pipe have been re-
Paired and/or replaced in a manner specified in said resolutions of
acceptance and to the satisfaction and approval of the Chief Engineer
of said Cities and Sanitary Districts; and.
WHEREAS, Nat. H. 7eff, Chief Engineer of said Cities and
Sanitary Districts, filed with the City Clerk of the City of Anaheim
on the 13th day of March, 1952, his certificate in writing certify-
ing that said contractors have completed, in accordance with the
plans and specifications adopted by Resolution No. 1800 of the City
Council of the City of Anaheim, as amended by Resolution. No. 1902,
passed on December 26, 1951, the balance of the construction of
30j Eanhole 1, Bid Item Yo. 37, shown as Valve Box B, and the connecting
31 16" x 13 x 12" C.I. all Bell Y-Branch, together with the necessary
32cast iron pipe, concrete thrust blocks, labor and equipment to make
-2-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20 g, Bid item No. 38, of the
21
22
23 Vukich, doing business as Paul Vukich Construction Company, a joint
24 v be, and the same is herebn accepted, and
25 BE IT FURTHER RESOLVED that upon the expiration of thirty-
26
27
28
29
30
32
said Manhole I complete, in accordance with said plans and specifi-
cations and also the construction of Manhole J, Bid. Item No. 38, of
Unit III of said Magnolia Trunk Sewer and Punning Plant and Force
Main, and has certified that the total and final amount due said
contractors is the sum of 0678.37; and
WHEREAS, the City Council of the City of Anaheim finds and
determines that said contractors have completed the balance of said
Unit III in accordance with the provisions of the contract and con-
tract documents and that said work should be finally accepted and a
notice of completion filed, and the payment of the balance due said
contractors be authorized in accordance with the contract documents
and the terms and conditions set forth in this resolution.
NOW, THEREFORE, BE IT Rn;SOLVED by the City Council of the
City of Anaheim that all. of the work, labor and materials and the
completion of that portion of Manhole I, Bid Item No. 37, shown as
Valve Box 3, and tne connecting 13" x
together with the necessary cast iron pine, concrete trust blocks,
labor and enuipment to make said Manhole 1 complete and in accordance
ith the plans and specifications and also the construction af Manhole
ng Plant and 2orce Main,
harles
Orange County Joint Outfali Sewer and Pump-
togetnier with the appurtenances thereto, by
T. Brown, doing business as Charles T. Brown Company, and Paul
five (35) days from date of acceptance, that said contractors be paid
the balance due them, in accordance with the contract documents, for
he construction, installation and completion-of the balance of said
nit III hereinbefore mentioned and described, in accordance with the
lans and specifications of contract documents and the resolutions of
31cceptance oi tne other portions of said Unit III passed and adopted
by said Cities and Sanitary Districts; and
13" x C.I. all Bell 7-Branch,
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
BE IT FURTHER RESOLVED that the City of Anaheim, as con-
tracting agent for said Cities and Sanitary Districts, file a. notice
of completion of said work and that the Mayor and City Clerk of the
City of Anaheim be, and trey are hereby authorized and directed to
file such notice of completion as provided by law, within fifteen
(15) days from the date of acceptance of the completion of the
balance of the work on said Unit III and the repair work on said
twenty-four (24) joints of pipe.
THE FOREGOING RESOLUTION is signed and approved by me this
6 day of
ATTEST:
1952.
Ate-4
Mayor of the City of Anaheim
CITY0FANAHEIM
204 E. CENTER ST.
ANAHEIM. CALIFORNIA
1 STATE OF CALIFORNIA)
COUNTY OF ORANGE ss.
2 CITY OF ANAHEIM
3
I, CHARLES E. GRIFFITH, City Clerk of the City of Anaheim do hereby
4 certify that the foregoing resolution was passed. and adopted at a regular meet-
5 ing of the City Council of the City of Anahei m. held on the 25th day of March,
6 1952, by the following vote of the members thereof:
7 AYES: COUNCILMEN: Pearson, Wiser, Boney and Van Wagoner.
8 NOES: COUNCILMEN: None.
9 .K73SENT: COUNCILMAN: Heying.
10 AND 1 FURTHER CERTIFY that the Mayor of the City of Anaheim signed
11 and approved said Resolution on the 25th day of March, 1952.
12
13 of said City of Anaheim this 25th day of March, 1952.
14
15
Cit ,rk of the City 16 naheim
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
IN WITNESS WHEREOF, I have hereunto set my hand and, affixed the seal
—5—