Loading...
06/14/1928-019R E S O L U T I O N CALLING FOR BIDS FOR ENGINE FOUNDATION RESOLVED BY THE CITY COUNCIL OF THE CITY OF ANAHEIM: That the City Clerk of said City be and he is hereby authorized and directed to publish a notice once a week for a period of two weeks in the Anaheim Gazette, a newspaper of general circulation, published in said City, calling for sealed proposals or bids for the furnishing to said city of all labor and concrete material required for con- crete engine foundation in the city power house, in accord- ance with C. and G. Cooper Company's drawing No. G 25 -145 and with the specifications and instructions included in attached proposal form. Said sealed proposals or bids to be received by the 12 tk City Clerk up to 8 o'clock P.M. of Thursday, the#h, day of Ju' , 1928. he foregoing resolution is approved and signed this day of 1928. Mayor of the City of naheim. Attest: a _r C. C L a 6 x � a , City Clerk of the City o XMeim. W P R 0 P OS A L FOR CONCRE LNGINE FOUNDATION Anaheim, California, July 12, 1928. To the TI City Council, k of Anaheim, Gentleli The un"erci. hereby pro to furnish all labor and con- crete mat,-rial remire�" in the ni:rIn, rourin.7. placin -?..nd enfing of concrete fouidstion for p;ps er. in the power house of the City of p ith G. Cooper Comp.-anyts d ­ Yos. G_ A naheim, in accordance 25 - 145, for the sum of per cubic yard, there be- in.- =�1 E:9 c Ac yar of concrete The Olity of A-:. -heirs , the -end lcrn with the reinforcir..- steel, ­nw bolts and ct and struutu c fnstencd in placi�. The concrete contractor will be he responsible for keeping and the form;' ' to ']Ane te. I )olt other 'A embedded material in their correct positions. The concrete whall be composed of 1 part standard nortlpnd, cement, 2 parts clean, sharp Pand and 4 parts clean gravel or crushed rock; only enough rater shall be added to trmke the mixture ea workable; the concrete shall be tholfrou.ghly spaded against the forms and around all embedded bars, rods and ,)ipes. The placinf, of the concrete -x,ust be done in one continuaus operation, without allowing more than 45 minutes between successive batches. +rhen,in the opinion of the city engineer, the concrete has attained sufficient hardness, the concrete contractor shall remove the forms. Curing of the concrete will be done by the City. All materials and workmanship shall be satisfactory to the city en�Tineer of Anaheim. Contractor. Proposal accepted and contract awarded CITY OF ANAHEIM 1928. BY Mayor of the City of Anaheim, Attest: f , r� ..-j City Ul of the City Anaheim. I Edward B. Uo rritt ,, City Olert of the City of Aa ia, do hereby cert ify that the fo"IMUW Reeelut s as � -.a a meeting of the City 00=011 of the City of Anaheim, b+Rld cit 0a the /:I day of .e IM t by the few loving Vosol AXES: Trustees 0 ABSLTT AND NOT VOTINOt Trussoost ifa/;-� And I further c e rtify that %be Mayor of thotity of Anaheim approved and signed said Resolution an the .. day of ,. � .. .,..r un. WITNZS WHEREOF: I have hereunto set my b ond and affixed the official seal of the City of Awe tm, this A 0 0 0 w ff ( SEAL) W