Loading...
25 (002)You don't often get email from contactthekims@gmail.com. Learn why this is important Date:3/4/2026 7:12:09 AM From:"g kim" contactthekims@gmail.com To: "aaitken@anaheim.net.com" aaitken@anaheim.net.com, "caleon@anaheim.ne t" caleon@anahe im.ne t, "Norma C. Kurtz" NKurtz@anaheim.net, "Kristen Maahs" KMaahs@anaheim.net, "Natalie Me e ks" NMeeks@anahe im.net, "Ryan Balius" RBalius@anaheim.net, "Natalie Rubalcava" NRubalcava@anaheim.ne t Cc:"Public Comment" publiccomment@anaheim.net, "City Clerk" cityclerk@anaheim.net, "Indhira Y. Gagnon" IGagnon@anaheim.net Subject:[EXTERNAL] URGENT: Legal & Safety Opposition to Second Reading of Fe stival Anaheim Hills Project (EIR No. 358) Warning: This email originated from outside the City of Anaheim. Do not click links or open attachme nts unle ss you recognize the sender and are expecting the message. To the Honorable Mayor and Council Members, I am writing to formally oppose the final adoption of the 447-unit project at the Anaheim Hills Festival site. The 4-3 vote on March 3rd was based on an incomplete and legally vulnerable record. We urge the Council to reverse its decision based on the following: 1. Failure to Mitigate the Documented 24-Minute Evacuation Delay According to EIR Appendix C (Res pons es to Written Comments ), the City admits this project results in a "potential extens ion of time to evacuate by approximately 24 minutes ." In a wind-driven wildfire in a Very High Fire Hazard Severity Zone (VHFHSZ), a 24-minute delay is the difference between life and death. Per SB 99 (2020) and Gov. Code § 65302(g)(5), the City is required to ensure residential developments in hazard areas have adequate evacuation routes. A $200,000 developer payment does not create a new road; it merely funds a plan to manage a gridlock that you are knowingly creating. 2. Omis s ion of Regional "Shadow Traffic" and Bypas s Volume The Traffic Analysis (Section 4.17) is fundamentally flawed because it ignores inter- city bypas s volume. Fairmont Blvd and Weir Canyon serve as primary "shortcuts" for thousands of commuters from Yorba Linda and the Inland Empire trying to avoid the 91 Freeway. This "shadow traffic" is not documented in local VMT (Vehicle Miles Traveled) studies but is a daily reality. Adding nearly 900 cars to a corridor that is already a regional relief valve is a direct violation of the General Plan Safety Element. 3. Economic Des tabilization of the Home Ins urance Market With premiums in 92807/92808 already surging by 20–30% this year, adding high- density units to a high-risk zone signals to carriers that the "risk density" has exceeded safe limits. This project acts as a "tipping point" for mas s ins urance non-renewals , potentially rendering thousands of existing homes uninsurable and unsellable. 4. CEQA Incons is tency and Lack of Overriding Cons iderations The "Statement of Overriding Considerations" is invalid because the City has not exhausted feasible alternatives in safer, transit-rich areas like the Platinum Triangle. Developer convenience is being prioritized over the physical and financial survival of your constituents. Thank you to the council members who voted NO on 3/3 and for those that voted yes, please consider the facts above and Vote NO on March 24th. Sincerely, Glen Kim 8177 E Somerset Ln Anaheim, CA 92808 You don't often get email from contactthekims@gmail.com. Learn why this is important Date:3/4/2026 7:48:41 AM From:"g kim" contactthekims@gmail.com To: "caleon@anaheim.net" caleon@anaheim.net, "Norma C. Kurtz" NKurtz@anaheim.net, "Kristen Maahs" KMaahs@anaheim.net, "Natalie Meeks" NMeeks@anaheim.net, "Ryan Balius" RBalius@anahe im.ne t, "Natalie Rubalcava" NRubalcava@anaheim.net, "Ashleigh Aitken" AAitken@anahe im.ne t Cc:"Public Comment" publiccomment@anaheim.net, "City Clerk" cityclerk@anaheim.net, "Indhira Y. Gagnon" IGagnon@anaheim.net Subject:[EXTERNAL] Re: URGENT: Legal & Safety Opposition to Second Reading of Festival Anahe im Hills Project (EIR No. 358) Warning: This email originated from outside the City of Anaheim. Do not click links or open attachme nts unle ss you recognize the sender and are expecting the message. Resending with the mayor’s correct email. Thank you, Glen On Mar 4, 2026, at 7:12 AM, g kim <contactthekims@gmail.com> wrote: To the Honorable Mayor and Council Members, I am writing to formally oppose the final adoption of the 447-unit project at the Anaheim Hills Festival site. The 4-3 vote on March 3rd was based on an incomplete and legally vulnerable record. We urge the Council to reverse its decision based on the following: 1. Failure to Mitigate the Documented 24-Minute Evacuation Delay According to EIR Appendix C (Res pons es to Written Comments ), the City admits this project results in a "potential extens ion of time to evacuate by approximately 24 minutes ." In a wind-driven wildfire in a Very High Fire Hazard Severity Zone (VHFHSZ), a 24-minute delay is the difference between life and death. Per SB 99 (2020) and Gov. Code § 65302(g)(5), the City is required to ensure residential developments in hazard areas have adequate evacuation routes. A $200,000 developer payment does not create a new road; it merely funds a plan to manage a gridlock that you are knowingly creating. 2. Omis s ion of Regional "Shadow Traffic" and Bypas s Volume The Traffic Analysis (Section 4.17) is fundamentally flawed because it ignores inter-city bypas s volume. Fairmont Blvd and Weir Canyon serve as primary "shortcuts" for thousands of commuters from Yorba Linda and the Inland Empire trying to avoid the 91 Freeway. This "shadow traffic" is not documented in local VMT (Vehicle Miles Traveled) studies but is a daily reality. Adding nearly 900 cars to a corridor that is already a regional relief valve is a direct violation of the General Plan Safety Element. 3. Economic Des tabilization of the Home Ins urance Market With premiums in 92807/92808 already surging by 20–30% this year, adding high-density units to a high-risk zone signals to carriers that the "risk density" has exceeded safe limits. This project acts as a "tipping point" for mas s ins urance non-renewals , potentially rendering thousands of existing homes uninsurable and unsellable. 4. CEQA Incons is tency and Lack of Overriding Cons iderations The "Statement of Overriding Considerations" is invalid because the City has not exhausted feasible alternatives in safer, transit-rich areas like the Platinum Triangle. Developer convenience is being prioritized over the physical and financial survival of your constituents. Thank you to the council members who voted NO on 3/3 and for those that voted yes, please consider the facts above and Vote NO on March 24th. Sincerely, Glen Kim 8177 E Somerset Ln Anaheim, CA 92808