Loading...
25 (027)You don't often get email from knaval07@yahoo.com. Learn why this is important Date:3/13/2026 11:46:29 AM From:"Navin Kumar" knaval07@yahoo.com To: "Ashleigh Aitken" AAitken@anaheim.net, "caleon@anaheim.net" caleon@anaheim.net, "Norma C. Kurtz" NKurtz@anaheim.net, "Kristen Maahs" KMaahs@anaheim.net, "Natalie Me e ks" NMeeks@anahe im.net, "Ryan Balius" RBalius@anaheim.net, "Natalie Rubalcava" NRubalcava@anaheim.ne t Cc:"Public Comment" publiccomment@anaheim.net, "City Clerk" cityclerk@anaheim.net, "Indhira Y. Gagnon" IGagnon@anaheim.net Subject:[EXTERNAL] URGENT: Legal & Safety Opposition to Second Reading of Fe stival Anaheim Hills Project (EIR No. 358) Warning: This email originated from outside the City of Anaheim. Do not click links or open attachme nts unle ss you recognize the sender and are expecting the message. To the Honorable Mayor and Council Members, I am writing to formally oppose the final adoption of the 447-unit project at the Anaheim Hills Fe stival site. The 4-3 vo te o n March 3rd was based on an incomplete and legally vulnerable record. We urge the Co unc il to re verse its decision based o n the following: 1. Failure to Mitigate the Documented 24-Minute Evacuation Delay (not 14) According to EIR Appendix C (Responses to Written Comments), the City admits this proje c t results in a "pote ntial extensio n of time to evacuate by approximately 24 minutes." In a wind-driven wildfire in a Very High Fire Hazard Seve rity Zone (VHFHSZ), a 24-minute delay is the difference between life and death. Per SB 99 (2020) and Go v. Code § 6 53 02 (g)(5), the City is required to ensure residential developments in hazard areas have adequate evacuation routes. A $20 0,0 00 de veloper payment does not create a new road; it merely funds a plan to manage a gridlock that you are knowingly creating. 2. Omission of Regional "Shadow Traffic" and Bypass Volume The Traffic Analysis (Section 4.17) is fundamentally flawed because it ignores inter-city bypass vo lume . Fairmont Blvd and Weir Canyon serve as primary "shortcuts" for thousands of commuters from Yorba Linda and the Inland Empire trying to avo id the 91 Freeway. This "shadow traffic" is not documented in local VMT (Vehicle Miles Trave led) studie s but is a daily re ality. Adding nearly 900 cars to a corridor that is already a regional relief valve is a direct violation o f the General Plan Safety Element. 3. Economic Destabilization of the Home Insurance Market The Council has failed to study the project’s impact on our crumbling insurance marke t. With premiums in 92 80 7/92 80 8 already surging by 20–30% this year, adding high-density units to a high-risk zone signals to carriers that the "risk density" has exceeded safe limits. This project acts as a "tipping point" for mass insurance non-renewals, po tentially re nde ring thousands of existing homes uninsurable and unsellable. 4. CEQA Inconsistency and Lack of Overriding Considerations The "Statement of Overriding Considerations" is invalid because the City has not exhauste d fe asible alternatives in safer, transit- rich areas like the P latinum Triangle. You are prioritizing developer convenience ove r the physical and financ ial survival o f your constituents. Thank you to the council members who voted NO on 3/3 and for those that voted ye s, ple ase c onsider the facts above and Vote NO on March 24th. Sincerely, Navin Kumar 225 S. Loganberry St Anaheim, CA 92808