1973-531
~~
RESOLUTION NO. 73R- 531
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF ANAHEIM AMENDING RATES, RULES AND REGULA-
TIONS FOR THE SALE AND DISTRIBUTION OF ELEC-
TRIC ENERGY AS ADOPTED BY RESOLUTION NO.
7lR-478 AND AHENDED BY RESOLUTIONS NOS.
73R-25 N~D 73R-373.
WHEREAS, the City of Anaheim does distribute electric
energy to certain customers who live in Anaheim; and
WHEREAS, all electric energy distributed by the City
of Anaheim is purchased from the Southern California Edison
Company; and
WHEREAS, the Southern California Edison Company, on
September 7, 1973, increased its wholesale electric rate 52.5%
to cities such as Anaheim; and
WHEREAS, the City Council determined that Anaheim's
retail electric rates should be increased in an amount not to
exceed Edison's retail rates in nearby communities effective
September 7, 1973, to provide most of the funds for the addi-
tional appropriation required for purchased power in the elec-
tric utility budget; and
~VHEREAS, it was intended that Anaheim's rate increase
in effect since September 7, 1973, be an interint increase
effective until Edison's request for a general increase on all
their retail electric rates was settled by the California Pub-
lic utilities Commission (CPUC); and
WHEREAS, the CPUC approved new Edison retail electric
rates effective October 10, 1973; and
WHEREAS, final Anaheim retail electric rates designed
to recover the full amount of Edison's wholesale increase in
the current fiscal year as well as revenue lost during the interim
period can now be made effective without exceeding Edison's
retail rates charged in nearby communities; and
--
WHEREAS, an additional appropriation of $90,000 is
required for the San Joaquin Nuclear Project Study; and
WHEREAS, the City Council has determined that Anaheim's
retail electric rates shall be increased to recover during the
current fiscal year the full amount of Edison's wholesale
increase as well as revenue lost during the interim period and
to provide funds for the additional appropriation for the San
Joaquin Nuclear Project Study; and
MfEREAS, Rule No. 17 contained in Resolution No.
7lR-478 provides guidelines for use in correcting electric
bills for meter error (physical malfunction) but is silent in
regard to billing corrections necessitated by clerical or
other utility-caused error; and
WHEREAS, the City Council has further determined
that in no case shall a billing correction for an under-
charge be rendered for a period exceeding four months.
NOW, THEREFORE, BE IT RESOLVED by the City Council
of the City of Anaheim that the rates, rules and regulations
adopted by Resolution No. 7lR-478 and w~ended by Resolutions
Nos. 73R-2S and 73R-373 be, and the same is hereby amended
as follows, to wit:
,J'-"~.
CITY OF ANAHEIM
Electric Utility
Post Office Box 3222
Anaheim, California 92803
Page No.
ii
RATES, RULES AND REGULATIONS
TABLE OF CONTENTS
TITLE
EFFECTIVE
DATE
PAGE NO.
Title Page
Table of Contents
11-14-71
i
II
II
II
9-07-73
11-14-71
II
II
II
II
ii
iii
iv
Electric Utility Policy 11-14-71
Rate Schedules 9-07-73
Schedule DS; Domestic Service 11-07-73
II II II II 9-07-73
Schedule No. GS-l; General Service 11-07-73
II Il II II II 11-14-71
Schedule No. GS-2; General Service 11-07-73
II II II II II 11-14-71
Schedule No. PC; Power-Connected
Load Basis 11-07-73
II Ii II II II 11-14-71
Schedule No. PD; Power - Demand Basis 11-07-73
Schedule No. PA; Power - Agricultural 11-07-73
II II II II II 11-14-71
., II It .. II II
1.0.1
2.0.1
2.1.1
2.1.2
2.2.1
2.2.2
2.3.1
2.3.2
2.4.1
2.4.2
2.5.1
2.6.1
2.6.2
2.6.3
~chedule No. LS-l; Lighting - Street
and Highway, City-Owned Syst~a 1-16-73
Schedule No. LS-2; Lighting - Street and
Highway, Customer-OWned Installation 11-14-71
Schedule No. LO; Lighting - Outdoor
Area, City-Owned System 1-16-73
Ii It II II II II
2.7.1
2.8.1
Schedule No. MS; Municipal Service 11-07-73
Rules and Regulations 11-14-71
2.9.1
2.9.2
2.10.1
3.0.1
~-
ISSUED BY
Gordon Hoyt
utilities Director
(Continued)
Effective By Resolution No.
Dated
Superseding Resolution No. 73R-373 'Dated~28~
~~
CITY OF ANAHEIM
Electric Utility ~
Post Office Box 3222
Anaheim, California 92803
Page No.
iv
RATES, RULES AND REGULATIONS
TABLE OF CONTENTS
(Continued)
TITLE
EFFECTIVE
DATE
PAGE NO.
Rule No. 12; Rates and Optional Rates
Ii II II II II II II
Rule No. 13; Temporary Service
Rule No. 14; Shortage of Supply and
Interruption of Delivery
Rule No. 15.0; Line Extensions
H I! II II II
a II Ii n II
" " " II U
II " '1 II :"i
II
3.12.1
3.12.2
11-14-71
11-14-71
3.13.1
11-14-71
11-14-71
II
3.14.1
3.15.0.1
3.15.0.2
3.15.0.3
3.15.0.4
3.15.0.5
II
II
!1
Rule No. l5.li Underground Extensions
Within New Residential Subdivisions
11-14-71
Ii
II
"
Ii
II
II
3.15.1.1
3.15.1.2
Rule No. 16; Service Connections and
Facilities on Customer's Premises
11-14-71
II
3.16.1
3.16.2
3.16.3
3.16.4
3.16.5
3.16.6
3.16.7
II II II II " II
!/ II iI .. II II
II II " II II !l
II II II !1 " II
II II II II " "
II II " II n II
Rule No. 17; Meter Tests and Adjustment
of Bills for Heter Error
11 It II ~, II II !l
"
II
It
II
II
II
3.17.1
3.17.2
11-07-73
Rule No. 18; Supply to Separate Premises
and Resale
11-14-71
3.18.1
Rule No. 20; Replacement of Overhead with
Underground Distribution Facilities
II II II II II II II
11-14-71
It
3.20.1
3.20.2
3.20.3
II "
Ii
Ii
II
Ii
It
II
"....~
ISSUED BY
Gordon Hoyt
Utilities Director
Effective By Resolution No. Dated
10-26-71
Superseding Resolution No. 71 R-4 7R Dated
,.
c,'~.
CITY OF ANAHEIM
Electric Utility ~
Post Office Box 3222
Anaheim, California 92803
Page No.
2.1.1
APPLICABILITY
SCHEDULE .NO. DS
DOMESTIC SERVICE
Applicable to domestic service including lighting, heating,
cooking, and power or combination thereof in a single family
accommodation.
RATES
RATE A (11)
Customer Charge
Energy Charge (to
Charge)
First 50
Next 100
Next 250
Next 500
All Excess
Minimum Charge:
The minimum
RATE B (12)
Customer Charge
Energy Charge (to
Charge)
First 300
Next 400
All Excess
Minimum Charge:
The minimum
RATE C (10 )
Customer Charge
Energy Charge (to
Charge)
First 300
Next 400
All Excess
Minimum Charge:
The minimum
PER METER
PER r10NTH
$1.10
be added to Customer
KWH, per K"WH 4.959
Kt"lli, per KWH 3.609
KWH, per KWH 2.609
KvlH, per KWH 2.009
KWH, per KWH 1.709
charge shall be the monthly Customer Charge.
$1.10
be added to Customer
KWH, per KWH Rate A
KWH, per KVlH 1.859
mm:, per h'WH 1.709
charge shall be the monthly Customer Charge.
$1.10
be added to Customer
KWH, per KWH Rate A
KVlH; per Ktm: 1.859
KWH, per KWH" 1.559
charge.shall be the monthly Customer Charge.
ISSUED BY
Gordon Hoyt
Utilities Director
";'
Effective By Resolution No.
Dated
Superseding Resolution No. 73R-373 DatedB-28-7
",.~,
CITY OF ANAHEIM
Electric Utility
Post Office Box 3222
Anaheim, California 92803
Page No.2. 2 .1
SCHEDULE NO. GS-l
GENERAL SERVICE
APPLICABILITY
Applicable to single and three phase general service including
lighting and power.
RATES
PER METER
PER MONTH
RATE A (13)
Customer Charge:
Single phase
Three phase
Energy Charge (to
Charge) :
First 400
Next 800
Next 1800
All Excess
Minimum Charge:
The minimum
$1.10
2.10
be added to Customer
KWH, per KWH
ro"rn, per KWH
KWH, per KWH
KWH, per K\Ji}"H
5.00<:
3.80<:
3.15<:
3.09<:
charge shall be the monthly Customer Charge.
RATE B (14)
Customer and
First
Energy Charges:
150 KWH per KW*
per KWI1
150 KWH per roi*
per rom
30 0 Klrm per KW*
per KWH
Minimum Charge:
The minimum charge shall be $1.00 per KW* of billing
demand.
Next
Over
of billing demand,
Rate A
of billing demand,
1.35<:
of billing demand,
1.02<:
*Not less than 20 KVl
>,.,.-~
(Continued)
ISSUED BY
Gordon Hoyt
Effective By Resolution No. Dated
Utilities Director
Superseding Resolution No.73R-373 Dated8-28-7
J"~'.
CITY OF ANAHEIM
Electric Utility
Post Office Box 3222
Anaheim, California 92803
Page No. 2.3.1
SCHEDULE NO. GS-2
GENERAL SERVICE
APPLICABILITY
Applicable to single and three phase general service including
lighting and power.
RATES (21)
PER METER
PER I10NTH
Demand Charge:
First 100 KW or less of billing
Next 900 KW of billing demand,
Next 9000 KW of billing demand,
All Excess KW of billing demand,
Energy Charge (to be added to Demand
First 150 KWH per KW* of billing
First 15,000 KWH, per ~VH
Balance of KWH, per KWH
Next 150 KWH per KW* of billing demand
All Excess rom!, per KWH
Minimum Charge:
The monthly minimum charge shall be the monthly demand charge.
*Not less than 100 KW.
demand
per KW
per KW
per KW
Charge) :
demand
$150.00
1.01
.89
.75
2.20<:
1.64<:
1.31<:
.98<:
SPECIAL.CONDITIONS
A. Service voltage per rules and regulations.
B. Billing Demand:
The billing demand in any month shall be the average kilowatt
input indicated or recorded by instruments to be supplied,
owned, and maintained by the City and at the City's expense
upon the consumer's premises adjacent to the watt-hour meter,
in the 15 minute interval in which the consumption of elec-
tric energy is greater than in any other 15 minute interval
in the month, but not less than either (I) 50% of the con-
tracted for or connected load, or (2) 50% of the highest
billing demand in the preceding eleven months, whichever is
the greater. However, in no case shall the billing demand
be less than 100!<W. Billing demand shall be determined to
the nearest 1;10!<W. Whenever the measured maximum demand
has exceeded 400 KW for three consecutive months and there-
after until it has fallen below 300 KW for 12 consecutive
months, a 30 minute interval will be used. Where the demand
is intermittent or subjected to violent fluctuations, the
maximum demand may be based on a shorter invertal.
,.,~.
(Continued)
ISSUED BY
Gordon Hoyt
Effective By Resolution No.
Dated
utilities Director
Superseding Resolution No. 73R-373 Dated8-28-7
,,,,--.
CITY OF ANAHEIM
Electric Utility
Post Office Box 3222
Anaheim, California 92803
Page No.2. 4 .1
SCHEDULE NO. PC
PO~~R - CONNECTED LOAD BASIS
APPLICABILITY
Applicable to all single or three phase general power service,
no lighting. This schedule is closed to new customers as of
November 14, 1971.
RATE (22)
First 100 KVlli per HP of connected load per month
First 100 KWH @ S.40~
Excess KmI @ 4.48~
Next 100 KWH per liP of connected load per month
All KWH @ 2.2l~
All Excess IDm1 @ 1.79~
Minimum Charge:
$1.00 per liP of connected load per month. But in no
case shall the minimum charge be less than the charges
for 2 t~, single phase or the charges for 3 HP, three
phase.
SPECIAL CONDITIONS
A. Service voltage per rules and regulations.
B. Connected load is the sum of the rated capacities of all
the consumer's equipment that it is possible to connect to
the City's lines at the same time, determined to the nearest
1/10 HP. 746 watts equivalent to 1 HP.
C. Whenever, upon test, equipment under normal operating condi-
tion is found to be delivering more than 125 per cent of its
capacity as indicated by its nameplate rating, the City may
disregard the nameplate rating and base its charges upon the
output as calculated from test. Equipment which is billed
on a basis in excess of its nameplate rating in accordance
with. this special condition shall be tested upon notification
by the consumer of a permanent change in operating conditions.
(Continued)
,,<~
ISSUED BY
Gordon Hoyt
Effective By Resolution No.
Dated
utilities Director
Superseding Resolution No. 73R-373 Dated8-28-7
....~
CITY OF ANAHE IM
Electric Utility
. ~
Post Off~ce Box 3222
Anaheim, California 92803
Page No.
2.5.1
SCHEDULE NO. PD
POWER - DE!1AND BASIS
APPLICABILITY
Applicable to single or three phase general power service, no
lighting. This schedule is closed to new customers as of
November 14, 1971, and will expire on January 1, 1974.
RATE (23)
Minimum billing demand of 35 KW per month.
First 150 KWH per KW of billing demand per month
First 1000 I~m @ 4.00~
Next 4000 KWH @ 3.27~
Excess ~v.H @ 2.62~
Next 150 KWH per I~i of billing demand per month
All KVill @ 1.3l~
All Excess KWH @ .98~
Minimum Charge:
First 35 KW billing demand or less. .$50.00 per month
Allover 35 KW billing demand . . $1.00 per KW per month
SPECIAL CONDITIONS
A. Service voltage per rules and regulations.
B. The billing demand shall be the kilowatt of measured maximum
demand but in no case shall be less than either (1) 50% of
the contracted for or connected load, or (2) '50% of the
highest measured maximum demand in preceding eleven months,
whichever is the greater. Maximum demand registration shall
be converted to the nearest one-tenth (1/10) billing kilowatt,
but in no case less than 35 ~d.
C. The measured maximum demand in any month shall be the maximum
kilowatt input indicated or recorded by instruments to be
supplied by the City, in the 15 minute interval in which the
consumption of electric energy is greater than in any other
15 minute interval in the month, or at the option of the City,
may be determined by tests fr'om time to time-. Where the
demand is intermittent or subject to violent fluctuations,
the maximum demand r~y be based upon a shorter time interval.
D. No adjustment in minimma charge will be made for any tempo-
rary reduction of connected load.
ISSUED BY
Gordon Hoyt
utilities Director
Effective By Resolution No.
Dated
Superseding Resolution No. 73R-373 Dated8-2~7.
Y;'
CITY OF ANAHEIM
Electric Utility
Post Office Box 3222
Anaheim, California 92803
Page No.2. 6 .1
SCHEDULE NO. PA
POWER - AGRICULTURAL
.
APPLICABILITY
Applicable to power service for general agricultural purposes, or
for general water or sewerage pumping.
RATE (24)
Size of
Installation HP
ENERGY CHARGE IN ADDITION TO SERVICE
CliARGE RATE PER KWH FOR CONSUMPTION
PER HP PER YEAR
Annual Service 1st 1000 2nd 1000 Allover 2000
Charge per HP ~rn roYH KWH
2 to 4.9
5 to 14.9
15 to 49.9
50 to 99.9
100 and over
$10.00
9.00
8.40
7.90
7.40
2.75<:
2.55<:
2.45<:
2.35<:
2.25<:
1.41<:
1.41<:
1.41<:
1.41<:
1.41<:
1.04<:
1.04<:
1.04<:
1.04<:
1.04<:
Hinimum Charge:
The annual minimum charge shall be the service charge, but
in no case will the total annual service charge be less than
$20.00 for single phase service nor less than $30.00 for
three phase service.
SPECIAL CONDITIONS
A. The rate applies to service rendered at 240 or 480 volts at
the option of the consumer. 746 watts shall be equivalent
to 1 HP.
B. The agricultural year upon which this rate is based shall
consist of twelve consecutive months, the start of the first
month being the first regular meter reading taken during
the month of May and the end of the last month being the
last regular meter reading taken during the month of April
of the succeeding year.
C.
The service charge is payable in six monthly installments
during the months of May to October inclusive. Consumers,
whose normal use of energy does not occur within the period
May through October, may elect, if satisfactory to the City
of Anaheim, another six months within which to pay the service
charge, provided such period shall not begin later than the
month of October. The energy charge is payable monthly as
energy is used.
~...
(Continued)
ISSUED BY
Gordon Hoyt
Effective By Resolution No.
Dated
Utilities Director
Superseding Resolution No. 73R-373 'Dated8-28-7
CITY OF ANAHEIM
Electric Utility
Post Office Box 3222
Anaheim, California 92803
Page No. 2.10.1
SCHEDULE NO. MS
MUNICIPAL SERVICE
APPLICABILITY
Applicable to single or three phase service where the City of
Anaheim owns, operates and maintains the electrical equipment.
RATE (IS)
All KWH per meter per month
1.8<: per KWH
,."...-...
ISSUED BY
Gordon Hoyt
utilities Director
Effective By Resolution No.
Dated
Superseding Resolution No. 73R-373 Dated8-~-J
CITY OF ANAHEIM
Electric Utility
Post Office Box 3222
Anaheim, California 92803
Page No. " 3 .17 .1
A. TESTS
RULE NO. 17
METER TESTS AND ADJUSTMENT OF BILLS FOR ERRORS
1. On Customer Request.' A customer may, on notice of not
less than one week, require the Utility to test the meter
for his service.
No charge will be made for such test, but, should a cus-
tomer da~and a test within six months after installation
or more often than once in six months, he will be requirec
to deposit $2.50 to pay, in part, the cost of the test.
This deposit will be returned if the meter is found to
register more than 2% fast or 2% slow.
A customer shall have the right to require the utility to
conduct the test in his presence or in the presence of
an expert or other representative appointed by him. The
results of the test will be furnished to the customer
within a reasonable time after completion of the test.
B. ADJUSTMENT OF BILLS FOR rffiTER ERROR.
1.
,.,"~.'"
Fast Meters. When, upon test, any meter is found to be
registering more than 2% fast, the Utility will refund to
the customer the amount of tiLe overcharge based on cor-
rected meter readings for the preceding six months, sub-
ject to the provisions of paragraph 4 hereof.
2.
Slow Meters. When, upon test, any meter for domestic
service is found to be registering more than 25% slow, or
any meter for other class of service is found to be
registering more than 2% slow, the utility may bill the
customer for the amount of the undercharge based on cor-
rected meter readings for the preceding four months,
subject to the provisions of paragraph 4 hereof.
3.
Nonregistering Meters. When, upon test, any meter is
found to be nonregistering, the Utility may bill the
customer for the estimate of electricity consumed but not
registered for a period of four months, subject to the
provisions of paragraph 4 hereof.
Bills for this purpose will be estimated from the cus-
tomer's prior use, the customer's subsequent use correctl
metered, the Utility's experience with other customers
of the same class, and the general characteristics of
the customer's operation.
(Continued)
ISSUED BY
Gordon Hoyt
utilities Director
Effective By Resolution No. Dated
10-26-71
Superseding Resolution No. 71R-478 Dated
,..
-
CITY OF ANAHEIM
Electric Utility
Post Office Box 3222
Anaheim, California 92803
Page No. 3 .17 .2
RULE NO. 17
METER TESTS AND ADJUSTMENT OF BILLS FOR ERRORS
(Continued)
B. ADJUSTMENT OF BILLS FOR METER ERROR (Continued).
4. General. When it is found that the error in a meter
is due to causes, the date of which can be reliably
established, the overcharge or the undercharge will
be computed back to but not beyond 'that date, pro-
vided, however, that in no case will a bill for an
undercharge be rendered for a period exceeding four
months.
C. ADJUST!1ENT OF BILLS FOR UTILITY ERROR.
1. General. When it is found that an error in billing
has occurred due to a Utility error, the date of
which can be reliably established, the overcharge or
the undercharge will be computed back to but not
beyond that date, provided, however, that in no case
will a bill for an undercharge be rendered for a
period exceeding four months.
4_
ISSUED BY
Gordon Hoyt
Utilities Director
Effective By Resolution No. Dated
10-26-71
Superseding Resolution No. 7lR-478 Dated
.,.........,
BE IT FURTHER RESOLVED that tJ.~e Rates, Rules and
Regulations adopted by this resolution, except Schedule No.
PA-Power Agricultural (Rate 24), shall go into effect
November 7, 1973.
BE IT FURTHER RESOLVED that Schedule No. PA as
adopted by this resolution, shall go into effect on all bills
rendered to cunsumers reflecting consumption for any complete
billing period commencing on or after November 7, 1973.
THE FOREGOING RESOLUTION is approved and signed by me
day of November , 1973.
this 6th
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss .
CITY OF ANAHEIf1 )
I, DENE M. DAOUST, City Clerk of the City of Anaheim,
do hereby certify that the foregoing Resolution No. 73R-53t was
passed and adopted at a regular meeting of the City Counc1l held
on the 6th day of November , 19 73 , by the following
vote of the members thereof: ---
AYES: COUNCILr.1EN: Stephenson, Sneegas, Pebley, Thom
and Dutton
NOES: COUNCILMEN: None'
ABSENT: COUNCIU~EN: None
AND I FURTHER CERTIFY that the Mayor of the City of
Anaheim approved and signed said Resolution on the 6th day of
November , 19...ll.-
IN WITNESS WHEP~OF, I have hereunto set my hand and
affixed the seal of the City of Anaheim this 6th day of
November , 19..11.-
[) " Pi il~-*
~EP~ OF THE CITY OF ANAHEIM
(SE..~)
,_.
I, DENE M. DAOUST, City Clerk of the City of Anaheim, do
hereby certify that the foregoing is the original of Resolution No.
73R-53l duly passed and adopted by the Anaheim City Council on
November 6, 1973.
/2
~ );1,
j)~--T
Ci ty Clerk
/kw