1974-075RESOLUTION NO. 74R -75
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF ANAHEIM AMENDING RATES, RULES AND REGULA-
TIONS FOR THE SALE AND DISTRIBUTION OF ELEC-
TRIC ENERGY AS ADOPTED BY RESOLUTION NO.
71R -478 AND AMENDED BY RESOLUTIONS NOS.
73R -25, 73R -373 AND 73R -531.
WHEREAS, the City of Anaheim does distribute elec-
tric energy to certain customers in Anaheim; and
WHEREAS, all electric energy distributed by the
City of Anaheim is purchased from the Southern California
Edison Company; and
WHEREAS, the Southern California Edison Company, on
January 2, 1974, filed an application with the Federal Power
Commission to increase its wholesale electric rates about 74%
to cities such as Anaheim, such increase to be effective March
3, 1974; and
WHEREAS, the Federal Power Commission can reject the
filing, or suspend the filing in whole or in part up to five
months, or accept the filing and make it effective March 17,
1974; and
WHEREAS, Anaheim will probably not know until shortly
before March 17, 1974, what action the Federal Power Commission
will take on the Edison Company filing; and
WHEREAS, an additional appropriation of about $1,245,000
per month will be required for purchased power in the electric
utility budget when the wholesale rate increase becomes effective;
and
WHEREAS, Anaheim will experience an estimated revenue
lag of $1,048,000 if the wholesale rates are increased March
17, 1974, unless Anaheim's retail electric rates are made
effective by February 19, 1974; and
WHEREAS, the Edison Company's wholesale electric rate
application includes a fuel cost adjustment; and
WHEREAS, Anaheim's Electric Rates, Rules and Regula-
tions do not include a fuel cost adjustment schedule; and
WHEREAS, the City Council has determined that Anaheim's
retail electric rates shall be increased February 19, 1974, to
avoid an estimated revenue lag of $1,048,000 if the wholesale
rate increase becomes effective March 17, 1974 and to provide
funds for additional appropriations to pay the wholesale power
cost increase; and
WHEREAS, the City Council has further determined that
Anaheim's Electric Rates, Rules and Regulations shall include
a fuel cost adjustment.
NOW, THEREFORE, BE IT RESOLVED by the City Council
of the City of Anaheim that the rates, rules and regulations
adopted by Resolution No. 71R -478 and amended by Resolutions
Nos. 73R -25, 73R -373 and 73R -531 are hereby amended as follows,
to wit:
-1-
CITY OF ANAHEIM
Electric Utility
Post Office Box 3222
Anaheim, California 92803
RATES, RULES AND REGULATIONS
TABLE OF CONTENTS
EFFECTIVE
TITLE DATE PAGE NO.
Title Page 11 -14 -71 i
Table of Contents 2 -19 -74 ii
11 -14 -71 iii
11 iv
Electric Utility Policy 11 -14 -71 1.0.1
Rate Schedules 9 -07 -73 2.0.1
Schedule FCA; Fuel Cost Adjustment 2 -19 -74 2.0.2
Schedule DS; Domestic Service 2 -19 -74 2.1.1
U 2.1.2
II 2.1.3
Schedule No. GS -1; General Service 2 -19 -74 2.2.1
11 11 11 0 11 2.2.2
Schedule No. GS -2; General Service 2 -19 -74 2.3.1
0 II 0 2.3.2
11 11 11 11 11 2.3.3
Schedule No. PC; Power- Connected
Load Basis 2 -19 -74 2.4.1
11 11 II it It 11 2.4.2
Schedule No. PA; Power Agricultural 2 -19 -74 2.6.1
11 11 11 f1 11-14-71 2.6.2
11 H 2 -19 -74 2.6.3
Schedule No. LS -1; Lighting Street
and Highway, City Owned System 1 -16 -73 2.7.1
Schedule No. LS -2; Lighting Street and
Highway, Customer -Owned Installation 11 -14 -71 2.8.1
Schedule No. LO; Lighting Outdoor
Area, City -Owned System 1 -16 -73 2.9.1
II 11 0 11 11 it 2.9.2
Schedule No. MS; Municipal Service
Rules and Regulations
2 -19 -74 2.10.1
11 -14 -71 3.0.1
ISSUED BY
Gordon Hoyt
Effective By Resolution No.
Page No.
ii
Dated
Utilities Director Superseding Resolution No.73R -531 D&73
CITY OF ANAHEIM
Electric Utility
Post Office Box 3222
Anaheim, California 92803
EL -82
TITLE
Rule No. 1; Definitions
11 11 It 11
11 11 ft 11
11 11 11 It
11 it It 11
II 11 11 11
Rule No. 2; Description of Service
II 11 If 11 11 11
II II 11 11 II If
If 11 II II II 11
It II IF 11 II 11
11 11 II 11 It II
11 11 11 11 It 11
11 It II 11 II II
II 11 II II II
11 II II 11 41 II
RATES, RULES AND REGULATIONS
TABLE OF CONTENTS
EFFECTIVE
DATE
11 -14 -71
11
It
ti
11
11
11 -14 -71
I1
11
1
11
It
11
11
11
11
Rule No. 3; Application for Service 11 -14 -71
Rule No. 4; Contracts 11 -14 -71
11 II II 11 41
Rule No. 5; Special Information Required
On Forms 11 -14 -71
tt tl II It II
Rule No. 6; Establishment and
Re- Establishment of Credit 11 -14 -71 3.6.1
II u u 11 11 t 3.6.2
Rule No. 7; Deposits 11 -14 -71 3.7.1
Rule No. 8; Notices 11 -14 -71 3.8.1
Rule No. 9; Rendering Payment of Bilis 11 -14 -71 3.9.1
II II II 11 II II 11 11 It 3.9.2
Rule No. 10; Disputed Bilis 11 -14 -71 3.10.1
Rule No. 11; Discontinuance Restora-
tion of Service 11-14-71 3.11.1
11 11 11 II 11 11 11 3 1 1 2
11 11 11 11 II II 11 3 1 1 3
ISSUED BY
Gordon W. Hoyt
Utilities Director
(Continued)
Page No.
PAGE NO.
3.1.1
3.1.2
3.1.3
3.1.4
3.1.5
3.1.6
3.2.1
3.2.2
3.2.3
3.2.4
3.2.5
3.2.6
3.2.7
3.2.8
3.2.9
3.2.10
3.3.1
3.4.1
3.4.2
3.5.1
3.5.2
Effective by Resolution No. Dated
Superseding Resolution No. 73R- -25 Datedl- 16 -73
CITY OF ANAHEIM
Electric Utility
Post Office Box 3222
Anaheim, California 92803
EL -82
TITLE
RATES, RULES AND REGULATIONS
TABLE OF CONTENTS
Continued)
Rule No. 12; Rates and Optional Rates 11 -14 -71 3.12.1
11 11 U 11 II 11 11 11 3 1 2 2
Rule No. 13; Temporary Service 11 -14 -71 3.13.1
Rule No. 14; Shortage of Supply and
Interruption of Delivery 11 -14 -71 3.14.1
Rule No. 15.0; Line Extensions 11 -14 -71 3.15.0.1
11 11 II I/ 11 II 3.15.0.2
11 11 11 11 11 II 3.15.0.3
It It II 11 11 i1 3.15.0.4
II tl 11 11 II II 3.15.0. 5
Rule No. 15.1; Underground Extensions
Within New Residential Subdivisions 11 -14 -71 3.15.1.1
11 11 ii 11 I, 1 3.15.1.2
Rule No. 16; Service Connections and
Facilities on Customer's Premises
II 11 11 11 11 11
11 11 11 II II 11
11 II 11 II 11 11
11 II 11 11 11 II
II 11 11 II 11 II
II 11 II II II II
Rule No. 17; Meter Tests and Adjustment
of Bills for Meter Error
11 11 11 If 11 11
Rule No. 18; Supply to Separate Premises
and Resale 11 -14 -71
Rule No. 20; Replacement of Overhead with
Underground Distribution Facilities 11 -14 -71
11 11 II 11 11 11 11 11
11 1I II II II 11 11
ISSUED BY
Gordon +4 Hoyt
Utilities Director
11
Page No. iv
EFFECTIVE
DATE PAGE NO.
11 -14 -71 3.16.1
1 f 3.16.2
3.16.3
3.16.4
3.16.5
3.16.6
3.16.7
11 -07 -73 3.17.1
3.17.2
3.18.1
3.20.1
3.20.2
3.20.3
••01■11.
Effective by Resolution No. Dated
Superseding Resolution No. 73R -531 Dated11- -6 -73
CITY OF ANAHEIM
Electric Utility
Post Office Box 3222
Anaheim, California 92803
EL -82
Schedule No.
FCA
DS
GS -1
GS -2
Title Page No.
Fuel Cost Adjustment 2.0.2
Domestic Service 2.1.1
General Service 2.2.1
General Service 2.3.1
PC Power Connected Load Basis 2.4.1
PA Power Agricultural 2.6.1
LS -1 Lighting Street and Highway,
City -Owned System 2.7.1
LS -2 Lighting Street and Highway,
Customer -Owned Installation 2.8.1
r.n Lighting Outdoor Area,
City -Owned System 2.9.1
MS Municipal Services 2.10.1
ISSUED BY
Gordon W. Hoyt
Utilities Director
RATE SCHEDULES
Page No 2 .0.1
Effective by Resolution No. Dated
Superseding Resolution No. 73R -373 Dated 8 -28-7:
CITY OF ANAHEIM
Electric Utility
Post Office Box 3222
Anaheim, California 92803
ISSUED BY
Gordon Hoyt
Utilities Director
SCHEDULE FCA
FUEL COST ADJUSTMENT
A. APPLICABILITY
Applicable to all areas served by the Utility and to all
kwhr billed under all rate schedules as defined under
the special conditions of the rate schedules.
B. PURPOSE
To provide for the adjustment of the Utility's electric
rate schedule energy charges whenever a fuel cost adjust-
ment has been applied to or is pending application to the
City's wholesale rate.
C. APPLICATION OF FUEL COST ADJUSTMENT
The fuel cost adjustment amount per kilowatt hour sold
shall be applied to service rendered on and after the
effective date and continuing thereafter until the next
such fuel cost adjustment amount becomes effective. The
dollar amount to be added to or subtracted from each bill
shall be the product of the total kilowatt hours for which
the bill is rendered multiplied by the fugl cost adjust-
ment amount per kilowatt hour sold.
D. AMOUNT OF FUEL COST ADJUSTMENT
The amount of the fuel cost adjustment shall be shown in
this section.
EFFECTIVE DATE AMOUNT PER KWHR
February 19, 1974 .642
Page No. 2.0.2
Effective By Resolution No. Dated
Superseding Resolution No. None Dated
CITY OF ANAHEIM
Electric Utility
Post Office Box 3222
Anaheim, California 92803
El_ 82
ISSUED BY
Gordon W. Hoyt
Utilities Director
SCHEDULE NO. DS
DOMESTIC SERVICE
APPLICABILITY
Applicable to domestic service including lighting, heating,
cooking, and power or combination thereof in a single family
accommodation.
PER METER
RATES PER MONTH
RATE A (11) and (16)
Customer Charge $1.20
Energy Charge (to be added to Customer
Charge)
First 50 KWH, per KWH 5.20
Next 100 KWH, per KWH 4.04
Next 250 KWH, per KWH 2.50
Next 500 KWH, per KWH 2.11
All Excess KWH, per KWH 1.83
Minimum Charge:
The minimum charge shall be the monthly Customer Charge.
RATE 13 (12)
Customer Charge $1.20
Energy Charge (to be added to Customer
Charge)
First 300 KWH, per KWH Rate A
Next 400 KWH, per KWH 1.90
All Excess KWIH, per KWH 1.83
Minimum Charge:
The minimum charge shall be the monthly Customer Charge.
RATE C (10)
Customer Charge: $1.20
Energy Charge (to be added to Customer
Charge)
First 300 KWII, per KWH Rate A
Next 400 KWH, per KWH 1.90
All Excess KWH, per KWH 1.68
Minimum Charge:
The minimum charge shall be the monthly Customer Charge.
Page N
2.1.1
Effective by Resolution No. Dated
Superseding Resolution No. 73R -531 Dated11 -6 -7'
EL -82
CITY OF ANAHEIM
Electric Utility
Post Office Box 3222
Anaheim, California 92803
SPECIAL CONDITIONS
A. Service voltage to a single family accommodation will be
120 volts or 120 -240 volts single phase.
B. Rate Selection:
C. Multi- family accommodations:
Where all of the single family accommodations in an apartment
house, court group, or similar multi- family accommodations
are on a single meter, the customer shall have the following
options:
1. To be billed on .General Service Schedule GS -1 or GS -2 or
2. To be billed on the applicable "A "B" or "C" rate of
this schedule adjusted as follows:
Customer Charge: No adjustment
Energy Charge (to be added to Customer Charge):
The kilowatt -hours for all blocks shall be
multiplied by the number of single family
accommodations on the meter.
Minimum Charge: No adjustment.
ISSUED BY
Gordon W. Hoyt
Utilities Director
SCHEDULE NO. DS
DOMESTIC SERVICE
'�Cont nued5
Page No. 2.1.2
1. Rate B is applicable only where the consumer has an
electric range and an electric water heater, both
permanently installed and used both exclusively for
all cooking and water heating on premises.
a. Water heater shall be provided with an efficiently
insulated storage tank and shall be equipped with
two heating units each separately controlled by
an individual thermostat. The thermostat control
circuit shall be interconnected to cause one heat-
ing unit to cut off when the other heating unit
is on.
b. Rate'B is closed to new customers as of November 14,
1971, and will expire on January 1, 1977.
2. Rate C is applicable only when all space heating is
done electrically (resistance or heat pump).
Rate C is closed to new customers as of January 1, 1974.
(Continued)
Effective by Resolution No. Dated
Superseding Resolution No. 73R -373 Datedg -23 -73
CITY OF ANAHEIM
Electric Utility
Post Office Box 3222
Anaheim, California 92803
EL -82
ISSUED BY
Gordon W. Hoyt
Utilities Director
Page No. 2.1 _1
SCHEDULE NO. DS
DOMESTIC SERVICE
(Continued)
SPECIAL CONDITIONS (Continued)
D. Fuel Cost Adjustment:
The rates above are subject to adjustment as provided for
in Schedule FCA. The applicable fuel cost adjustment
billing factor set forth therein will be applied to all
kwhr billed under this schedule.
Effective by Resolution No.
Superseding Resolution No. None
Dated
Dated
EL -82
CITY OF ANAHEIM
Electric Utility
Post Office Box 3222
Anaheim, California 92803
APPLICABILITY
Applicable to single and three phase general service including
lighting and power.
RATES
*Not less than 20 KW
SCHEDULE NO. GS -1
GENERAL SERVICE
(Continued)
PER METER
PER MONTH
RATE A (13)
Customer Charge:
Single phase $1.20
Three phase 2.20
Energy Charge (to be added to Customer
Charge):
First 400 KWII, per KWH 5.20
Next 800 KWH, per KWH 4.01
Next 1800 KWH, per K4`JH 3.24
All Excess KWH, per KWH 3.21
Minimum Charge:
The minimum charge shall be the monthly Customer Charge.
RATE B (14) and (19)
Customer and Energy Charges:
First 150 KWII per KW* of billing demand,
per KWH Rate A
Next 150 KWH per KW* of billing demand,
per KWH 1.48
Over 300 KWH per KW* of billing demand,
per KWH 1.04
Minimum Charge:
The minimum charge shall be $1.00 per KW* of billing
demand.
ISSUED BY
Gordon W. Hoyt
Utilities Director
Page No 2.2 •1
Effective by Resolution No. Dated
Superseding Resolution No, 73R 531 Dated 11
EL -82
CITY OF ANAHEIM
Electric Utility
Post Office Box 3222
Anaheim, California 92803
SPECIAL CONDITIONS
A. Service voltage per rules and regulations.
B. Rate B is applicable when a demand meter is installed in
accordance with Special Condition E.
C. The billing demand in any month shall be the average kilo-
watt input indicated or recorded by instruments to be
supplied, owned and maintained by the City and at the City's
expense upon the consumer's premises adjacent to the watt
hour meter, in the 15 minute interval in which the consump-
tion of electric energy is greater than in any other 15
minute interval in the month, but not less than either (1)
50% of the contracted for or connected load, or (2) 50% of
the highest billing demand in the preceding eleven months,
whichever is the greater. However, in no case shall the
billing demand be less than the minimum billing demand.
Billing demand shall be determined to the nearest 1 /10 KW.
D. Where the demand is intermittent or subjected to violent
fluctuations, the maximum demand may be based on a lesser
interval.
E. A maximum demand meter will be installed when, in the opinion
of the Utilities Department, the customer's load and use
characteristics indicate that the maximum demand may exceed
20 KW or when the customer's use exceeds 3,000 KWIH per month.
F. Where the City installs the standard transformer capacity
requested by a customer to serve separately an X -ray installa
tion, the customer charge will be increased by $1.00 per kva
of transformer capacity requested.
G. No adjustment will be made for any temporary reduction in
load. Any customer who resumes service within twelve months
must pay all charges that would have been billed had service
been continuous.
H. Fuel Cost Adjustment:
The rates above are subject to adjustment as provided for in
Schedule FCA. The applicable fuel cost adjustment billing
factor set forth therein will be applied to all kwhr billed
under this schedule.
SCHEDULE NO. GS -1
GENERAL SERVICE
(Continued)
Page No 2.2.2
ISSUED BY
Gordon W. Hoyt Effective by Resolution No. Dated
Superseding Resolution No. 71R 478 Datedl0 26 -7
Utilities Director
CITY OF ANAHEIM
Electric Utility
Post Office Box 3222
Anaheim, California 92803
EL -82
APPLICABILITY
Applicable to single and three phase general service including
lighting and power.
RATES (21)
Demand Charge:
First 200 KW or less of billing demand $260.00
Next 1800 KW of billing demand per KW 1.05
Next 8000 KW of billing demand per KW .90
All Excess KW of billing demand, per KW .75
Energy Charge (to be added to Demand Charge):
First 150 KWH per KW* of billing demand
First 30,000 KWH, per KWH
Balance of K1 ^7H, per KWH
Next 150 KWH per KW* of billing demand
All Excess KWH, per KWH
Minimum Charge:
The monthly minimum charge shall be the monthly demand charge
*Not less than 200 KW.
SPECIAL CONDITIONS
SCHEDULE NO. GS -2
GENERAL SERVICE
A. Service voltage per rules and regulations.
Page No. 2.3.1
PER METER
PER MONTH
2.39G
1.72G
1.36G
1.03G
B. Billing Demand:
The billing demand in any month shall be the average kilowatt
input indicated or recorded by instruments to be supplied,
owned, and maintained by the City and at the City's expense
upon the consumer's premises adjacent to the watt -hour meter,
in the 15 minute interval in which the consumption of elec-
tric energy is greater than in any other 15 minute interval
in the month, but not less than either (1) 50% of the con-
tracted for or connected load, or (2) 50% of the highest
billing demand in the preceding eleven months, whichever is
the greater. However, in no case shall the billing demand
be less than 200 KW. Billing demand shall be determined to
the nearest KEW Whenever the measured maximum demand has
exceeded 400 KW for three consecutive months and thereafter
until it has fallen below 300 KW for 12 consecutive months,
a 30 minute interval will be used. Where the demand is
intermittent or subjected to violent fluctuations, the
maximum demand may be based on a shorter interval.
ISSUED BY
Gordon W. Hoyt
Utilities Director
(Continued)
Effective by Resolution No. Dated
Superseding Resolution No. 73R -531 Datedll -6 -73
EL -B2
CITY OF ANAHEIM
Electric Utility
Post Office Box 3222
Anaheim, California 92803
Page No. 2.3.2
SCHEDULE NO. GS -2
GENERAL SERVICE
(Continued)
SPECIAL CONDITIONS (Continued)
C. Power Factor Adjustment:
The charges will be adjusted each month for the power
factor as follows:
The charges will be decreased by 20 cents per kilowatt
of measured maximum demand and will be increased by
20 cents per kilovar of reactive demand. However, in
no case shall the kilovars used for the adjustment be
less than one -fifth the number of kilowatts.
The kilovars of reactive demand shall be calculated by
multiplying the kilowatts of measured maximum demand
by the ratio of the kilovar -hours to the kilowatt- hours.
Demands in kilowatts and kilovars shall be determined
to the nearest unit. A rachet device will be installed
on the kilovar-hour meter to prevent its reverse opera-
tion on leading power factor.
D. Voltage Discount:
The charges before power factor adjustment will be reduced
by 3% for service delivered and metered at voltages of from
2 to 10 KV; by 4% for service delivered and metered at volt-
ages of from 11 KV to 50 KV; and by 5% for service delivered
and metered at voltages from 50 KV; except that when only
one transformation from a transmission voltage level is
involved, a customer normally entitled to a 3% discount will
be entitled to a 4% discount.
E. Temporary Discontinuance of Service:
Where the use of energy is seasonal or intermittent, no
adjustment will be made for a temporary discontinuance of
service. Any customer prior to resuming service within
twelve months after such service was discontinued will be
required to pay all charges which would have been billed if
service had not been discontinued.
ISSUED BY
Gordon W. Hoyt
Utilities Director
(Continued)
Effective by Resolution No. Dated
Superseding Resolution No. 71R -472 Dated10 -26 -71
EL -82
CITY OF ANAHEIM
Electric Utility
Post Office Box 3222
Anaheim, California 92803
MISsosur
SPECIAL CONDITIONS (Continued)
F. Fuel Cost Adjustment:
SCHEDULE NO. GS -2
GENERAL SERVICE
(Continued)
Page No. 2.3.3
The rates above are subject to adjustment as provided for in
Schedule FCA. The applicable fuel cost adjustment billing
factor set forth therein will be applied to all kwhr billed
under this schedule.
ISSUED BY
Gordon W. Hoyt Effective by Resolution No. Dated
Utilities Director Superseding Resolution No. None Dated
CITY OF ANAHEIM
Electric Utility
Post Office Box 3222
Anaheim, California 92803
EL-82
APPLICABILITY
ISSUED BY
Gordon W. Hoyt
Utilities Director
SCHEDULE NO. PC
POWER CONNECTED LOAD BASIS
Page No 2 .4 .1
Applicable to all single or three phase general power service,
no lighting. This schedule is closed to new customers as of
November 14, 1971.
RATE (22)
First 100 KWH per HP of connected load per month
First 100 KWH 5.50
Excess KWII 4.674
Next 100 KWH per HP of connected load per month
All KWH 2.37
All Excess KWH 1.88
Minimum Charge:
$1.20 per HP of connected load per month. But in no
case shall the minimum charge be less than the
charges for 2 HP, single phase or the charges for 3 HP,
three phase.
SPECIAL CONDITIONS
A. Service voltage per rules and regulations.
B. Connected load is the sum of the rated capacities of all
the consumer's equipment that it is possible to connect to
the City's lines at the same time, determined to the nearest
1 /10 HP. 746 watts equivalent to 1 HP.
C. Whenever, upon test, equipment under normal operating con-
ditions is found to be delivering more than 125 per cent
of its capacity as indicated by its nameplate rating, the
City may disregard the nameplate rating and base its charges
upon the output as calculated from test. Equipment which
is billed on a basis in excess of its nameplate rating in
accordance with this special condition shall be tested upon
notification by the consumer of a permanent change in
operating conditions.
(Continued)
Effective by Resolution No. Dated
Superseding Resolution No. 73R -531 Dated 11 -6 -73
EL -82
CITY OF ANAHEIM
Electric Utility
Post Office Box 3222
Anaheim, California 92803
SCHEDULE NO. PC
Page No. 2.4.2
POWER CONNECTED LOAD BASIS
(Continued)
SPECIAL CONDITIONS (Continued)
D. Where X -ray apparatus is served under this schedule, the
minimum charge applicable thereto shall be as follows:
1. Where X -ray apparatus is metered separately from
the other load:
$3.00 per month, except where the transformer
capacity is installed exclusively to serve the
X -ray apparatus, the minimum charge will be $1.00
per month per KVA of such capacity but not less
than $3.00 per month.
2. Where X -ray apparatus is metered in combination with
other load:
$1.00 per month per KVA of X -ray apparatus capacity
as established by the City of Anaheim.
E. No adjustment in mi charge will be made for any tem-
porary reduction of connected load.
F. Fuel Cost Adjustment:
The rates above are subject to adjustment as provided for
in Schedule FCA. The applicable fuel cost adjustment
billing factor set forth therein will be applied to all
kwhr billed under this schedule.
ISSUED BY
Gordon W. Hoyt Effective by Resolution No. Dated
wramromeme
Uti 1 i ties Director Superseding Resolution No. 71R- 47R_Dated 10 -26 -77
CITY OF ANAHEIM
Electric Utility
Post Office Box 3222
Anaheim, California 92803
EL' -82
APPLICABILITY
RATE (24)
ISSUED BY
Gordon W. Hoyt
Utilities Director
SCHEDULE NO. PA
POWER AGRICULTURAL
Page No. 2.6 .1
Applicable to power service for general agricultural purposes, or
for general water or sewerage pumping.
ENERGY CHARGE IN ADDITION TO SERVICE
CHARGE RATE PER KWH FOR CONSUMPTION
PER HP PER YEAR
Size of Annual Service 1st 1000 2nd 1000 All over 2000
Installation HP Charge per HP KWH KWH KWH
2 to 4.9 $10.60 2.89 1.50 1.10
5 to 14.9 9.60 2.69 1.50 1.10
15 to 49.9 9.00 2.59 1.50 1.10
50 to 99.9 8.40 2.49 1.50' 1.10'
100 and over 7.80 2.394 1.50 1.10
Minimum Charge:
The anIYual minimum charge shall be thc =vice charge, but
in no case will the total annual service charge be less than
$21.20 for single phase service nor less than $31.80 for
three phase service.
SPECIAL CONDITIONS
A. The rate applies to service rendered at 240 or 480 volts at
the option of the consumer. 746 watts shall be equivalent
to 1 HP.
B. The agricultural year upon which this rate is based shall
consist of twelve consecutive months, the start of the first
month being the first regular meter reading taken during
the month of May and the end of the last month being the
last regular meter reading taken during the month of April
of the succeeding year.
C. The service charge is payable in six monthly installments
during the months of May to October inclusive. Consumers,
whose normal use of energy does not occur within the period
May through October, may elect, if satisfactory to the City
of Anaheim, another six months within which to pay the ser-
vice charge, provided such period shall not begin later than
the month of October. The energy charge is payable monthly
as energy is used.
(Continued)
Effective by Resolution No. Dated
Superseding Resolution No. 73R -531 Dated11 -6 -73
CITY OF ANAHEIM
Electric Utility
Post Office Box 3222
Anaheim, California 92803
SPECIAL CONDITIONS (Continued)
1.
2.
ISSUED BY
Gordon W. Hoyt
Utilities Director
EL -82
SCHEDULE NO. PA
POUER AGRICULTURAL
(Continued)
H. Change of Connected Load:
Where there is an increase or decrease in connected load
during the agricultural year, no adjustments in billing to
date of change will be made. For the period subsequent to
date of change, billing shall be made on the following basis:
Any remaining service charge installments shall
be based on the new connected load.
Energy charge billing will be based on the new
connected load using the full annual blocks less
the adjusted kilowatt -hour use to date of change.
This adjustment is determined by multiplying the
kilowatt -hours to date of change by the ratio of
the new connected load to the old connected load.
I. Fuel Cost Adjustment:
The rates above are subject to adjustment as provided for
in Schedule FCA. The applicable fuel cost adjustment
billing factor set forth therein will be applied to all
kwhr billed under this schedule.
Effective by Resolution No. Dated
Superseding Resolution No. 71 R -478 Dated 10-26 -7
Page No. 2.6.3
EL -82
CITY OF ANAHEIM
Electric Utility
Post Office Box 3222
Anaheim, California 92803
APPLICABILITY
ISSUED BY
Gordon W. Hoyt
Utilities Director
SCHEDULE NO. MS
MUNICIPAL SERVICE
RATE (15)
All KWH per meter per month 2.0 per KWH
SPECIAL CONDITIONS
A. Fuel Cost Adjustment:
Page No 2.10.1
Applicable to single or three phase service where the City of
Anaheim owns, operates and maintains the electrical equipment.
The rates above are subject to adjustment as provided for
in Schedule FCA. The applicable fuel cost adjustment
billing factor set forth therein will be applied to all
kwhr billed under this schedule.
Effective by Resolution No. Dated
Superseding Resolution No. 73R -531 Dated 11-6-73
/kw
BE IT FURTHER RESOLVED that the Rates, Rules and
Regulations adopted by this resolution,except Schedule No.
PA Power Agricultural (Rate 24), shall go into effect
February 19, 1974.
BE IT FURTHER RESOLVED that Schedule No. PA as
adopted by this resolution shall go into effect on all bills
rendered to consumers reflecting consumption for any complete
billing period commencing on or after February 19, 1974.
THE FOREGOING RESOLUTION is approved and signed by
me this 19th day of February, 1974.
ATTEST:
CITY CLERK OF THE CITY OF ANAHEIM
STATE OF CALIFORNIA
COUNTY OF ORANGE ss.
CITY OF ANAHEIM
r
OR OF THE CITY OF ANAHEIM
I, ALONA M. FARRENS, City Clerk of the City of Anaheim,
do hereby certify that the foregoing Resolution No. 74R -75 was
passed and adopted at a regular meeting of the City Council held
on the 19th day of February 19 74, by the following
vote of the members thereof:
AYES: COUNCILMEN: Stephenson, Sneegas, Pebley, Thom
and Dutton
NOES: COUNCILMEN: None
ABSENT: COUNCILMEN: None
AND I FURTHER CERTIFY that the Mayor of the City of
Anaheim approved and signed said Resolution on the 19th day of
February 19 74
IN WITNESS WHEREOF, I have hereunto set my hand and
affixed the seal of the City of Anaheim this 19th day of
February 19 74
(SEAL)
CITY CLERK OF THE CITY OF ANAHEIM
I, ALONA M. FARRENS, City Clerk of the City of Anaheim, do
hereby certify that the foregoing is the original of Resolution No.
74R -75 duly passed and adopted by the Anaheim City Council on
February 19, 1974.
-2-
City Clerk