1977-361RESOLUTION NO. 77R 361
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF ANAHEIM ACCEPTING A SEALED PROPOSAL AND
AWARDING A CONTRACT TO THE LOWEST RESPONSIBLE
BIDDER FOR THE FURNISHING OF ALL PLANT, LABOR,
SERVICES, MATERIALS AND EQUIPS ENT AND ALL
UTILITIES AND TRANSPORTATION, INCLUDING POWER,
FUEL AND WATER, AND PERFORMING ALL 1;ORK NECES-
SARY TO CONSTRUCT AND COMPLETE THE F')LLOWING
PUBLIC IMPROVEMENT:
PARK BUILDINGS AT:
RIO VISTA PARK WORK ORDER NO. 851
JUAREZ PARK WORK ORDER NO. 868
WHEREAS, the City Council of the City of Anaheim did
cause to be published in a newspaper of general circulation,
printed, published and circulated in the City of Anaheim, to
wit: The Anaheim Bulletin, on the 21st and 28th days of April,
1977, a notice inviting sealed proposals
for furnishing the following:
All plant, labor, services, materials and equipment, and
all utilities and transportation, including power, fuel
and water, and performing all work necessary to construct
and complete in a good and workmanlike manner, in strict
accordance with the specifications, plans and drawings
therefor on file in the Office of the City Engineer or
City Clerk of the City of Anaheim, the following public
improvement, to wit:
A single -level park building at Rio Vista Park and at
Juarez Park; contractor to provide all plant, labor,
service, materials and equipment necessary to perform
all work needed for the public restrooms, pump facility,
equipment room and electrical site work. Exterior and
interior walls shall be concrete block masonry. Roof
framing system shall be wood and construction shall be
Type V -N. Plumbing shall consist of sanitary drainage
and water supply for plumbing fixtures with connections
made to existing utilities. Electrical service shall
be underground and metered as indicated on drawings.
Lighting for the building shall be fluorescent and site
lighting shall be mercury vapor. Site work, other than
utility connections, shall be limited to the boundary
shown on the drawings. All work shall be done in strict
accordance with the plans and specifications on file in
the Office of the City Engineer, Work Order Nos. 851 and
in acq dlerN Ve t I of design, plans, profiles and specifications
of said public improvement on file in the Office of the City
Clerk of the City of Anaheim; and
-1-
WHEREAS, said notice inviting sealed proposals for said
public improvement did provide that sealed proposals would be
received by the City of Anaheim at the Office of the City Clerk
of the City of Anaheim up to the hour of 2:00 o'clock P.M. on
the 5th day of May 19 77 for the furnishing
of all plant, labor, services, materials and equipment, all
utilities and transportation, including power, fuel and water,
and performing all work necessary to construct and complete in
a good and workmanlike manner, the public improvement herein
above more particularly mentioned and described, and which
notice did state and declare that pursuant to the provisions
of Section 1770 of the Labor Code, the City Council of the City
of Anaheim had ascertained the prevailing rate of wages in the
locality in which this type of labor is to be performed for
each craft or type of workman or mechanic needed to execute the
contract, and which wage scale is on file in the Offices of the
City Clerk and City Engineer; and
WHEREAS, the City Clerk of the City of Anaheim did
receive the following sealed proposals prior to 2:00 o'clock
P.M. on the 5th day of May 19 77 in
response to the notice aforesaid inviting sealed proposals,
to wit:
NAME TOTAL PRICE
R. J. W. CONSTRUCTION COMPANY
W.O. No. 851 Rio Vista Park Building 66,558.00
W.O. No. 868 Juarez Park Building 65,308.00
NEAR -CAL CORPORATION
W.O. No. 845 Schweitzer Park Building)
W.O. No. 851 Rio Vista Park Building )...$273,690.00
W.O. No. 868 Juarez Park Building
AND WHEREAS, the City Engineer did thereupon examine
and tabulate said sealed proposals and did report to the City
Council the result of his examination and tabulation; and
WHEREAS, the City Council finds that the sealed pro-
posal submitted by R. J. W. CONSTRUCTION COMPANY, 923 No. Main,
Orange, California 92667
is the lowest responsible proposal submitted for the furnishing
of all plant, labor, services, materials and equipment, all
utilities and transportation, including power, fuel and water
and performing all work necessary to construct and complete in
a good and workmanlike manner, in strict accordance with the
specifications, plans and drawings therefor on file in the Office
-2-
of the City Clerk of the City of Anaheim, the public improvement
hereinabove mentioned and described, together with the appuren-
ances thereto, and as specified in the notice inviting sealed
proposals, and that said proposal of said above -named bidder
should be accepted and a contract awarded to said bidder in
accordance therewith; and
WHEREAS, the City Council finds that the above mentioned
sealed proposal is the lowest responsible proposal received and
that the person, firm or corporation submitting said proposal
is a responsible person, firm or corporation and that the pro-
posal submitted is the best suited and fitted for the public
improvement to be constructed.
NOW, THEREFORE, BE IT RESOLVED by the City Council of
the City of Anaheim that the sealed proposal submitted by said
contractor for the furnishing of all plant, labor, services,
materials and equipment, all utilities and transportation,
including power, fuel and water, and performing all work
necessary to construct and complete, in a good and workmanlike
manner, in strict accordance with the specifications, plans and
drawings therefor on file in the Office of the City Clerk of the
City of Anaheim and the notice inviting sealed proposals, the
public works and improvement hereinabove more particularly men
tioned and described, together with the appurtenances thereto,
and the same is hereby, accepted, and that a contract for the
construction and completion of said public improvement be, and
the same is hereby, awarded to the said above -named bidder.
AND BE IT FURTHER RESOLVED that the successful bidder
or bidders upon each contract awarded as hereinabove set forth,
shall be, and they are hereby required to execute a contract in
the required form with the City of Anaheim upon the terms and
conditions specified in the notice inviting sealed proposals and
the proposal submitted by said successful bidder or bidders and
in accordance with the plans and specifications for said pur.l-ic
improvement hereinabove described, and in accordance with the
terms, conditions and provisions of this resolution, and that
said successful bidder or bidders to whom each contract is awarded
shall be required to furnish a surety bond in an amount equal to
one hundred per cent (100`/0) of the contract price for all labor,
materials and equipment to be furnished and performed, as set
forth in the sealed proposal submitted by said bidder for the
construction of said public improvement, together with the appur-
tenances thereto or such portion thereof as is covered by said
contract, as security for the faithful performance of said contract,
and a separate surety bond in an amount equal to one hundred per
cent (100 of the construction cost of said public improvement
covered by said contract, as security for the payment of all
persons performing labor and furnishing material for said project.
AND BE IT FURTHER RESOLVED that said successful bidder
or bidders be, and they are hereby required to furnish to the
City of Anaheim in companies satisfactory to the City of Anaheim,
public liability, property damage, compensation, and other insur-
ance in the amounts and for the purposes set forth and specified
in the notice inviting sealed proposals, and subject to the
approval of the City Attorney as to form and sufficiency.
AND BE IT FURTHER RESOLVED that the Mayor and the City
Clerk of the City of Anaheim be, and they are hereby, authorized
and directed to make, execute and enter into, for and on behalf
of the City of Anaheim, a written contract with said successful
bidder or bidders for the furnishing of all plant, labor,
materials, and equipment and performing all work, as iereinabovc
more particularly described, for the construction, installation
and completion of said public improvement hereinabove described
upon the terms and conditions as specified in the notice inviting
sealed proposals, the detailed design, plans, profiles, drawings
and general specifications and detailed specifications and draw-
ings, and all addenda thereto, and all modifications incorporated
therein prior to the date of the opening of bids, on file in
the Office of the City Clerk of the City of Anaheim and in strict
accordance with the terms, conditions and provisions of this
resolution, and in accordance with all of the contract documents
herein specified.
THE FOREGOING RESOLUTION is approved and signed by me
this 17th day of May 1977 /1
ATTEST:
ICA/
CI T L RK OI° TH. CITY 0 AN
/fm
idAtgl/P
Air
+F TH ANAHEIM
STATE OF CALIFORNIA
COUNTY OF ORANGE ss.
CITY OF ANAHEIM
I, LINDA D. ROBERTS, City Clerk of the City of Anaheim, do hereby certify that
the foregoing Resolution No. 77R -361 was introduced and adopted at a regular
meeting provided by law, of the City Council of the City of Anaheim held on
the 17th day of May, 1977, by the following vote of the members thereof:
AYES: COUNCIL MEMBERS: Kaywood, Seymour, Kott, Roth and Thom
NOES: COUNCIL MEMBERS: None
ABSENT: COUNCIL MEMBERS: None
AND I FURTHER CERTIFY that the Mayor of the City of Anaheim approved and
signed said Resolution No. 77R -361 on the 17th day of May, 1977.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of the
City of Anaheim this 17th day of May, 1977.
(SEAL)
CITY CL RK OF THE CI OF ANAHEIM
I, LINDA D. ROBERTS, City Clerk of the City of Anaheim, do hereby certify that
the foregoing is the original of Resolution No. 77R -361 duly passed and adopted
by the Anaheim City Council on May 17, 1977.