Loading...
22 (01) Susana Barrios From:Laura Hernandez <LHernandez@arellanoassociates.com> Sent:Tuesday, August 25, 2026 5:18 PM To:Public Comment; Mayors Office; Berenice Ballinas; Carlos A. Leon; Ryan Balius; Natalie Rubalcava; Norma C. Kurtz; Kristen Maahs; Natalie Meeks Cc:DiCamillo, LaDonna@HSR; Galvez, Stefan@HSR; Schmeltzer, Hope@HSR Subject:\[EXTERNAL\] City Council Meeting 8/25- CAHSR Letter Attachments:20260825 Ltr_to_City_of_Anaheim_OCVibe_FINAL.pdf Some people who received this message don't often get email from lhernandez@arellanoassociates.com. Learn why this is important Warning: This email originated from outside the City of Anaheim. Do not click links or open attachments unless you recognize the sender and are expecting the message. Dear Anaheim City Council Members: On behalf of the California High-Speed Rail Authority, attached please find a letter for your consideration related to Item 22 on tonight’s agenda. We look forward to continuing to work together to bring High-Speed Rail to Southern California. Regards, Laura Hernandez Project Manager 5851 Pine Avenue, Suite A | Chino Hills, CA 91709 P • 909.627.2974 | C • 909.314.6913 E • LHernandez@arellanoassociates.com www.arellanoassociates.com 1 770 L Street, Suite 620, Sacramento, CA 95814 • T: (916) 324-1541 • F: (916) 322-0827 • www.hsr.ca.gov August 25, 2026 Greg Garcia, Interim City Manager City of Anaheim 200 S. Anaheim Blvd Anaheim, CA 92805 Re: Agenda Item 22: Lot B development proposed as part of OC Vibe development Dear Greg Garcia: The California High-Speed Rail Authority (“Authority”) is currently in the process of preparing a Final Environmental Impact Report (EIR)/Environmental Impact Statement (EIS) for the Los Angeles to Anaheim project section, following circulation of the Draft EIR/EIS at the end of 2025 and our efforts to address feedback from the public and various local, State and Federal agencies on that document. The Authority has collaborated with the City of Anaheim throughout development of the Draft EIR/EIS as it pertains to potential effects on the community, infrastructure, and existing and future development, and in particular regarding changes near the ARTIC station resulting from construction and operation of high-speed rail (HSR) facilities. Background The Authority acknowledges the City of Anaheim’s planned development in the Platinum Triangle and has coordinated regularly with the city on planned HSR facilities in this area. The Authority and the City of Anaheim executed a Memorandum of Understanding (MOU) in December 2020 specifically regarding the HSR station design at Anaheim Regional Transportation Intermodal Center (ARTIC). The 2020 MOU formalized the commitment by the Authority and City of Anaheim to work together to accommodate HSR passengers within the existing ARTIC facilities and parking supply and acknowledges that modifications to existing facilities and infrastructure may be needed in and around ARTIC, including parking facilities, vehicular circulation and access, passenger circulation and access, and any other necessary changes. The 2020 MOU also formalized the Authority’s commitment to collaborate with other parties, in addition to the City of Anaheim, as it relates to planned development within the Platinum Triangle. A central area of cooperation under this MOU pertains to the City of Anaheim-approved OCVIBE, a 100-acre master planned campus that would surround the Honda Center and consist of shopping, dining, sports, entertainment, open space, apartments, offices, and parking. The Authority acknowledges OCVIBE’s status as a planned project that has been approved and vested by the City of Anaheim, and that it is already under construction, with major components slated to be completed in 2027 and full buildout completed after 2030. Amongst other changes, the proposed HSR station facilities are expected to conflict with OCVIBE at Parcel 5A/Lot B of the OCVIBE Master Site Plan (Assessor’s Parcel Number Greg Garcia, Interim City Manager Page 2 August 25, 2026 386-521-17), where an OCVIBE office building was planned. An HSR passenger terminal and a power substation are proposed in this same location. The Authority anticipates construction activities associated with the project section to commence in 2031 or later, at which point the majority of OCVIBE would already be completed. Consistent with the 2020 MOU, the Authority is committed to ongoing coordination with the City of Anaheim and Anaheim Real Estate Partners, because the Authority’s goal is to integrate the HSR station facilities into the ARTIC and OCVIBE area in a mutually beneficial way so that the HSR station enhances the existing and future development. The Authority’s coordination with the City of Anaheim and Anaheim Real Estate Partners on the ARTIC HSR station platform and passenger terminal design is an example of the Authority’s commitment to coordinating with other parties associated with planned development within the Platinum Triangle. The Authority has shared the proposed plans with the City and Anaheim Real Estate Partners and met several times to discuss potential conflicts in the designs, and through the Authority’s continued coordination with OCVIBE, Parcel 5A/Lot B is anticipated to be developed through a shared vision that supports the institutional office building and ARTIC HSR facilities, with shared access to both uses. Conflicting Use Proposed by Agenda Item 22 On August 24, 2026, the Authority was made aware of the resolutions listed under Item 22 on the City Council agenda related to OCVIBE Mixed-Use Project scheduled for discussion on August 25, 2026. It is our understanding that these resolutions include clarifications and provisions related to Parcel 5A/Lot B in the OCVIBE site plans that could adversely affect proposed HSR plans for this area. If the proposed resolutions allow for new land uses development options on Parcel 5A/Lot B that are not reflected in the current OCVIBE planning documents and associated environmental clearance (i.e., not an office building), or as discussed in the past coordination meetings with the Authority regarding this development and the proposed HSR station improvements/platforms, the Authority cannot guarantee that new land use proposals on Parcel 5A/Lot B will allow for the shared use of the ARTIC station platforms for both future HSR and passenger rail services The Authority encourages the City Council to review the commitments the City of Anaheim has agreed to under the current 2020 MOU with the Authority and to consider the long-term implications for connection of High-Speed Rail to ARTIC and other transit serving the area. To that end, we ask that the City Council refrain from approving Item 22 and instead seek a mutually beneficial way to proceed and support the long-term success of both projects. The Authority remains ready and willing to discuss proposed OCVIBE plans with you and work together to the mutual benefit of all parties and looks forward to continuing to engage on this important project together. Greg Garcia, Interim City Manager Page 3 August 25, 2026 Sincerely, LaDonna DiCamillo LaDonna DiCamillo, Northern and Southern California Regional Director cc via email only: Mark Tollefson, Chief of Staff, California High-Speed Rail Authority Basem Muallem, Statewide Regional Director, California High-Speed Rail Authority Soon-Sik Lee, Chief of Planning & Engineering, California High-Speed Rail Authority Stefan Galvez, Director of Environmental Services, California High-Speed Rail Authority