Public Utilities 2026/07/22CITY OF ANAHEIM
PUBLIC UTILITIES BOARD
MINUTES
July 22, 2026
The agenda having been posted on Thursday, July 16, 2026, the Regular Meeting of the Public Utilities Board
(Board) was called to order by Chairperson J. Seymour at 5:00 p.m. on Wednesday, July 22, 2026, in the Gordon
Hoyt Conference Center, 2nd floor, Anaheim West Tower, 201 S. Anaheim Blvd., Anaheim, California.
Board Members Present: Chairperson J. Seymour, Vice -Chairperson A. Pham, M. Lee, A. McMenamin,
I. Castillo, T. Ibrahim, S. Kewalramani
Board Members Absent: None
City Staff Present: B. Beelner, A. Lee, P. Starr, C. Parker, J. Lonneker, J. Sanks, T. Castaneda, M.
Seifen, C. Espinoza, P. Mendez, B. Gurrola, P. Bogdanoff, G. Ludesirishoti,
S. Nelson, B. Mendoza, A. Ramirez, G. Cruz
Guests Present: Sarah K., Cambridge Virtual Academy; George C., Anaheim High School; Halle
C., Loara High School; Gem N., Katella High School; and Eva G., Anaheim High
School; A. Kirby, G. Kirby, S. Chan, M. Rodriguez, S. Mercadante, M. Herbert,
V. Nelson
AGENDA ITEM ACTION TAKEN
1. RECOGNITION: 2026 HIGH SCHOOL SCHOLARSHIP
RECIPIENTS.
T. Castaneda, Community and Sustainability Programs Manager,
provided an overview of the selection process of the High School
Scholarship Recipients. T. Castaneda thanked the Board Members
who served on the ad hoc Scholarship Selection Committee for their
contributions during the selection process. The recipients received a
scholarship and a paid internship through the partnership with
Workforce Development and Hope Builders, to obtain firsthand
experience in the workplace.
T. Castaneda congratulated Sarah K., Cambridge Virtual Academy;
George C., Anaheim High School; Halle C., Loara High School; Gem
N., Katella High School; and Eva G., Anaheim High School; as the
2026 High School Student Scholarship recipients. The students then
gave a brief presentation about their internship experience.
The Board recognized and congratulated the 2026 High School
Student Scholarship recipients.
2026 - 55
2. PUBLIC COMMENTS. Following the public
comments, Chairperson J.
There being no electronic public comments submitted by the deadline, Seymour closed the public
Chairperson J. Seymour opened the public comments portion of the comments portion of the
meeting. meeting.
S. Mercadante voiced her concerns regarding water quality.
M. Herbert voiced his concerns regarding water quality and submitted
comments in writing.
3. ELECTIONS FOR PUBLIC UTILITIES BOARD T. Ibrahim moved to close the
CHAIRPERSON AND VICE -CHAIRPERSON. nominations. M. Lee seconded
the motion. By voice votes, the
A. Lee, Assistant City Attorney, opened the floor for nominations for Board closed the nominations and
Chairperson and Vice -Chairperson. Chairperson J. Seymour elected J. Seymour as Chairperson
nominated A. Pham for Vice -Chairperson, who accepted the of the Board and A. Pham as Vice -
nomination, and T. Ibrahim nominated J. Seymour for Chairperson, Chairperson of the Board.
who accepted the nomination. MOTION CARRIED: 7-0.
ABSTAINED: 0.
By voice votes, the Board unanimously voted to close the nominations ABSENT: 0.
and voted to elect J. Seymour to the position of Chairperson and A.
Pham to the position of Vice -Chairperson.
4. ELECTION FOR THREE UNDERGROUND CONVERSION Chairperson J. Seymour moved
SUBCOMMITTEE MEMBERS. ** to close the nominations. Vice -
Chairperson A. Pham seconded
Chairperson J. Seymour opened the floor for nominations for three the motion. By voice votes, the
Underground Conversion Subcommittee Members. Chairperson J. Board closed the nominations
Seymour nominated A. Pham, T. Ibrahim, and A. McMenamin, who and elected A. Pham, T. Ibrahim,
accepted their nominations. and A. McMenamin to serve on
the Underground Conversion
By voice votes, the Board unanimously voted to close the subcommittee.
nominations and voted to elect A. Pham, T. Ibrahim, and A. MOTION CARRIED: 7-0.
McMenamin to serve on the Underground Conversion Subcommittee. ABSTAINED: 0.
ABSENT: 0.
5. APPOINTMENT OF THREE MEMBERS AND ALTERNATES
FOR THE PUBLIC UTILITIES HEARING BOARD AND
APPOINTMENT OF UP TO THREE MEMBERS FOR THE AD
HOC LEGISLATIVE WORKING GROUP. **
Chairperson J. Seymour appointed Vice -Chairperson A. Pham and
Board Members M. Lee and I. Castillo to serve on the ad hoc
Legislative Working Group. Vice -Chairperson A. Pham and Board
Members M. Lee and I. Castillo accepted their appointments.
Chairperson J. Seymour appointed himself along with A. McMenamin,
and T. Ibrahim, who accepted the nomination, to serve on the Public
Utilities Hearing Board. Chairperson J. Seymour then appointed Vice -
Chairperson A. Pham and Board Members M. Lee and I. Castillo to
2026 - 56
serve as alternates on the Public Utilities Hearing Board, who accepted
their appointments as alternates. Chairperson J. Seymour confirmed all
appointments to the Public Utilities Hearing Board.
6. APPROVE THE MINUTES OF THE REGULAR MEETING OF
JUNE 24, 2026.
7. RECOMMEND APPROVAL OF RESPONSE TO 2025-2026
ORANGE COUNTY GRAND JURY REPORT REGARDING
PEAS AND PUBLIC AWARENESS.
C. Parker, Assistant General Manager— Water Services, briefed the
Board on the recent Orange County Grand Jury report (Grand Jury
Report) titled "PFAS (per- and polyfluoroalkyl substances) and Public
Awareness: A Closer Look at Orange County (OC) Drinking Water".
The Grand Jury Report commended the City of Anaheim (Anaheim)
for having one of the largest PFAS treatment programs in the country.
C. Parker then shared Anaheim's proposed responses to the Findings
and Recommendations assigned to Anaheim. Anaheim generally
agreed with most of the Findings, except the one regarding PFAS
education. Although Anaheim does rely on the Orange County Water
District to educate the public on PFAS, Anaheim has provided
educational resources such as open houses, community district
meetings, student tours, workshops at the Sustainability Education
Center, Orange County Green Expo, Water Awareness Month,
website information, social media, and reports directly to the City
Council and Public Utilities Board. Anaheim agrees with the
recommendations and has partially implemented them and will be
implementing the remaining items in the future.
The Board asked how many other cities throughout Orange County
were involved in the Grand Jury Report. C. Parker responded that not
every city is involved, there are about 14-15 agencies involved.
8. QUARTERLY STATUS REPORT FOR PRE -QUALIFIED
PROFESSIONAL SERVICES, CONSTRUCTION, AND
MATERIAL PURCHASES (APRIL - JUNE 2026).
B. Beelner, Acting Public Utilities General Manager, explained that
Anaheim Public Utilities (APU) provides a quarterly status report for
pre -qualified professional services, construction, and material
purchases, which was included in the Board packet.
M. Lee moved the approval of
the Minutes of the Regular
Meeting of June 24, 2026. Vice -
Chairperson A. Pham seconded
the motion.
MOTION CARRIED: 7-0.
ABSTAINED: 0.
ABSENT: 0.
M. Lee moved the
recommendation to approve the
response to 2025-2026 Orange
County Grand Jury Report
regarding PFAS and Public
Awareness. I. Castillo seconded
the motion.
MOTION CARRIED: 7-0.
ABSTAINED: 0.
ABSENT: 0.
2026 - 57
9. UPDATE ON ELECTRIC SYSTEM ITEMS.
J. Lonneker, Assistant General Manager — Electric Services, shared
that APU participated in the Fourth of July event at Peralta Park. APU
staff engaged with residents by offering rides on the electric bucket
trucks.
J. Lonneker updated the Board on the recent ductbank installation
underneath the railroad tracks on Nutwood Street for the
Cerritos/Nutwood undergrounding project. J. Lonneker explained
there was a delay in getting the permits from Union Pacific Railroad
Company for this crossing, which is the last segment of the civil work
before electrical installation begins. Mayor Pro Tem C. Leon
witnessed the installation of the steel encasement within the 20 foot
bore pit.
J. Lonneker shared that F. Barvarz, Transmission and Distribution
Manager, was invited to speak at The Exchange 2026, an Energy
Industry Conference held at the Anaheim Convention Center. F.
Barvarz provided insight on how APU uses automation throughout
the electric grid for situational awareness to assist in locating the
cause of the outage, to improve response time to isolate a power
outage and using electric metering infrastructure for expedited
disconnects and reconnects. APU's response time is in the top quartile
across the nation, and leverages automation when new equipment is
installed.
10. UPDATE ON (I) WATER SYSTEM ITEMS AND (II)
INFORMATIONAL REPORT REGARDING WATER
QUALITY COMMENTS.
C. Parker briefed the Board on the Water Supply Dashboard, noting
that the Orange County Groundwater Basin and State Water Project
(SWP) are in good condition. The Colorado River is still in a strained
condition. The United States Bureau of Reclamation (USBR) has
recently provided some grant money to assist in conservation. The
seven states are still trying to negotiate a deal with USBR oversight.
The southern states have already agreed to provide additional
conservation on their own.
C. Parker provided an update on the "Informational Report Regarding
Water Quality Comments Made at the May Public Utilities Board
Meeting" which APU provided to address matters of broader public
interest covering drinking water operations and regulations involving
technical distinctions that may not be understandable from individual
observations, photographs, or isolated operational events.
C. Parker then discussed the PFAS Notification for Well 51, stating
that all regulations were followed and that Anaheim coordinated with
the California State Water Resources Control Board, Division of
Drinking Water (DDW) on the issue. DDW did not issue any notice
2026 - 58
of violations on the notification. C. Parker then confirmed that Well
51 remained in service as the DDW only issued a notification; no
action was required other than notification to the governing board
(i.e., City Council). C. Parker then mentioned that the City Council
and Public Utilities Board were told that Well 51 was shut down on
February 17, 2026, but was not actually shut down until March 6,
2026. C. Parker noted that per the water operations review,
improvements have been made to communication processes.
Regardless, Well 51 was not required to be shut down, so all
regulations were met.
C. Parker also discussed the OC Grand Jury report on PFAS and that
the City was commended for having one of the largest PFAS
treatment programs in the country. Additionally, C. Parker explained
the Walnut Canyon Reservoir operations and distribution flushing and
mentioned that a valve at the reservoir remained closed for an
extended period due to an instrumentation project. When operators
decided to open the valve, it was opened slowly to gradually allow
water into the Lenain Water Treatment Plant. This process resulted in
some temporary cloudy water into the plant before treatment.
However, all plant effluent (water leaving the plant to distribution)
met applicable regulations. The distribution water monitoring did
identify conditions warranting some additional measures to maintain
long term water quality. Flushing, an Environmental Protection
Agency (EPA) approved practice, was one of the measures utilized to
maintain water quality. Anaheim coordinated with DDW regarding
this issue, and Anaheim received no violations regarding this activity.
Additionally, DDW completed an investigation regarding a flushing
and compliance testing complaint with the California EPA filed by
three Water Operations employees on March 8, 2026. DDW
determined that there were no violations.
C. Parker then discussed the Water Operations Consulting (Auditing)
Services. The effort included bringing in an outside firm to provide
independent monitoring and review of water system operations
practices. The engagement was valuable while the City reviewed and
considered personnel matters. The consultant work included onsite
monitoring by state licensed professionals, review of operating logs,
assessment of best management practices, and assistance in
maintaining operational continuity. Anaheim will be implementing
improvements in the future based on this activity. In conclusion,
water quality and regulatory compliance are essential responsibilities
of a water agency, and APU has a history of working collaboratively
with our regional partners and regulatory agencies to provide safe,
reliable, high -quality water to its customers.
The Board asked if the public could obtain water quality data through
a Public Records Request. C. Parker confirmed that APU has already
been providing data to the public through such requests.
2026 - 59
The Board asked if APU has received customer inquiries regarding
brown water. C. Parker responded that APU has not received any
inquiries.
The Board asked if APU is in compliance with mandated federal and
state regulations. C. Parker said that APU remains in compliance.
11. UPDATE ON FINANCE AND ENERGY RESOURCES ITEMS.
B. Beelner discussed the monthly Electric Finance Dashboard for the
period ending June 2026. B. Beelner mentioned that the fiscal year
ended with electric revenue 0.4% ($1.7M) below budget with
operating revenue coming in 8.4% ($36.8M) below budget. APU will
carry over approximately half of the operating expenditure to the next
fiscal year with the remainder used for capital needs.
B. Beelner then discussed the Water Finance Dashboard. B. Beelner
informed the Board that water revenue for the Fiscal Year 2026 came
in 0.1% ($0.1M) above budget and mentioned that the fiscal year
ended with water operating expenditures at 8.2% ($7.5M) below
budget.
The Power Supply Dashboard did not have any specific information
requiring discussion; however, B. Beelner provided an update of the
installation following the repair of Unit 1 of the Canyon Power Plant.
The Board inquired about the lifespan of the repaired unit. B. Beelner
mentioned that the original 30-year lifespan remained with an
expected life until 2040. B. Beelner reminded the Board that APU is
moving to a carbon -free portfolio by 2045, meaning that the unit will
not run past that date.
The Board asked about potential technological options to allow the
Canyon Power Plant to continue to run past that date. B. Beelner
shared that several agencies have identified hydrogen as a potential
solution; however B. Beelner cautioned the Board that hydrogen has
limitations and current technological concerns.
The Board inquired what the lead time to financially prepare and
implement the conversion to hydrogen. B. Beelner informed the
Board that APU has not done that study and will follow up with staff
and provide an update to the Board.
The Board mentioned it has been an advantage owning a power plant.
The Board asked if APU has a strategic plan that would allow us to
continue in the same mode before we go to all clean energy. B.
Beelner shared that APU is currently in the process to model what a
carbon free Anaheim will look like.
APU staff will provide an
update to the Board.
2026 - 60
12. UPDATE ON ADMINISTRATION AND RISK SERVICES
ITEMS.
J. Sanks, Assistant General Manager— Administration and Risk
Services, shared that APU tracked 85 legislative bills in June, fewer
than previous months as bills failed to meet legislative deadlines. J.
Sanks highlighted that APU supports two bills related to metal
theft. Assembly Bill (AB) 1941 would increase penalties for
organized metal theft. Senate Bill (SB) 1266 would require that the
value of stolen metal be calculated as the full cost to repair and
replace the stolen materials, including labor and equipment, rather
than the fair market scrap value. J. Sanks shared updates related to
portable solar generation. These small solar systems, sometimes
referred to as "balcony solar" could be installed on small residential
patios. J. Sanks shared that APU was watching AB 2612, which
would require adopting building standards for these systems, and was
concerned about SB 868, which would prevent utilities from requiring
interconnections for these devices.
The Board asked how balcony solar systems might be connected to
the electric system. J. Sanks described that they would be plugged
into a customer's ordinary household receptable and would back -
feed power into the home. J. Sanks noted that this could present a
safety hazard for electric crews if there was unexpected electricity on
a circuit.
J. Sanks described APU's safety performance, noting that the Lost
Time Injury Rate and Days Away, Restricted, and Transferred Injury
Rate were lower than the same period last year. The overall injury
rate was slightly elevated, but still consistent with previous years. J.
Sanks described that the increased reporting of close calls and good
catches was a sign of a proactive safety program. J. Sanks described
that three injuries occurred last month, including a foot injury and two
strains. APU continues to provide ergonomic safety training for crews
to reduce the risk of strain injuries. J. Sanks also described that the
University of California, Irvine — Health had recently provided burn
first aid training for APU staff exposed to electrical hazards.
13. ITEMS BY SECRETARY.
B. Beelner shared the following updates:
• D. Lee, former Public Utilities General Manager, hosted an
APU employee luncheon event in celebration of his retirement
after 26 years of service; and
• APU hosted a retirement reception for D. Lee to congratulate
and express gratitude for his dedicated service to the Anaheim
community.
2026 - 61
B. Beelner shared agenda items planned for next month:
• Agreement for an Enterprise Service Bus Software Solution and
Services;
• Approval of New Large Load Rule;
• Award of Design/Build Contract for Santa Ana Canyon Road
Water Main Extension; and
• Electric and Water Bond Refunding.
14. ITEMS BY BOARD MEMBERS.
L Castillo mentioned B. Beelner did a great job as emcee at D. Lee's
Retirement Reception.
M. Lee expressed appreciation to APU staff following the transition
in management.
15. ADJOURN: (NEXT REGULAR MEETING ON AUGUST 26,
2026 AT 5:00 P.M.)
Respectfully submitted,
Brian Beelner
Acting Public Utilities General Manager
I. Castillo moved to adjourn the
Regular Meeting in the Gordon
Hoyt Conference Center at 6:19
p.m. to the Board's Regular
Meeting date of August 26, 2026,
at 5:00 p.m. A. McMenamin
seconded the motion.
MOTION CARRIED: 7-0.
ABSTAINED: 0.
ABSENT: 0.
*Indicates voting item(s) that will be forwarded to City Council for action upon recommendation by the Board.
**Indicates voting item(s) that do not require further approval actions.
2026 - 62
CITY OF ANAHEIM
SISTER CITY COMMISSION
MINUTES
May 26, 2026 — 4:00 p.m.
COMMISSIONERS PRESENT: Lori Dinwiddie, Chiarina Piazza, James Dinwiddie
Kevin Barrot, Simin Heydari, David Bracey, Monika
Sargent, Anthony Al -Jamie Joseph Aihara
COMMISSIONERS ABSENT:
STAFF PRESENT:
GUEST PRESENT:
Deana Helmi, Jennifer Sasai, Alicia Valadez-Gonzalez,
Susan Klaren-Hatzenbuhler, Sandra Song
Karen Harrell — Executive Secretary
N/A
Agenda Posting: A complete copy of the Anaheim Sister City Commission Agenda was posted on
Thursday, May 21, 2026, at 2:00 p.m. at Anaheim City Hall.
I. CALL TO ORDER
Chair Lori Dinwiddie called the Anaheim Sister City Commission (ASCC) meeting to
order at 4:35 p.m. on Tuesday, May 26, 2026.
H. FLAG SALUTE
No Flag Salute
III. PUBLIC COMMENT
N/A
IV. APPROVAL OF MINUTES FOR APRIL 27, 2026
MOTION: Commissioner James Dinwiddie offered a Motion, seconded by
Commissioner Monika Sargent AND MOTION CARRIED (Vote: 9-0; ABSENT:
Deana Helmi, Jennifer Sasai, Alicia Valadez-Gonzalez, Susan Klaren-Hatzenbuhler,
and Sandra Song with (One Vacant Seat) that the Anaheim Sister City Commission
does hereby approve the minutes from the ASCC meeting held on April 27, 2026, as
presented.
Anaheim Sister City Commission
May 26, 2026
Page 2
V. APPROVAL OF TREASURER'S REPORT
MOTION: Commissioner Monika Sargent offered a Motion, seconded by
Commissioner James Dinwiddie AND MOTION CARRIED (Vote: 9-0; ABSENT:
Deana Helmi, Jennifer Sasai, Alicia Valadez-Gonzalez, Susan Klaren-
Hatzenbuhler, and Sandra Song with (One Vacant Seat) that the Anaheim Sister
City Commission does hereby approve the treasurer's report from the ASCC
meeting held on April 27, 2026, as presented.
VI. STUDENT EXCHANGE CALENDAR AND UPDATES
Chair Lori Dinwiddie noted that, due to staff member Kimberly Kelemen's absence,
no calendar updates were available for review. Lori stated she would email Kimberly
and request that the most current schedule be sent to all commissioners.
VII. DISCUSS HOST FAMILIES SELECTION
Chair Lori Dinwiddie noted no updates.
VIII. FUNDRAISING EFFORTS/LETTER TO BUSINESSES
Chair Lori Dinwiddie will be requesting letter from staff member Kimberly Kelemen.
IX. ANNIVERSARY CELEBRATION UPDATES/TO-DO'S:
Interim City Manager Greg Garcia confirmed the upcoming Sister City Anniversary
celebration scheduled for November 16-17, 2026. The planned activities include a reception
and recognition at the November 16 City Council Meeting and a visit to Disneyland Park on
November 17.
The Commission continued discussing potential commemorative gift ideas,
including artwork, statue, orange tree, a possible "time capsule" of all Anaheim
things. Other ideas discussed were to refurnish the current Mito, Japan plaques,
bridges, artwork.
Anniversary Celebration Subcommittee members are Commissioners Deana Helmy,
David Bracey, and Susan Klaren-Hatzenbuhler.
X. COMMISSIONER COMMENTS
Commissioners discussed how to handle students not selected for the exchange
program, including providing private feedback or general guidance for future
applicants. Commissioners also discussed discontinuing the use of "alternate"
students to avoid assumptions of automatic selection the following year.
Chair Lori Dinwiddie proposed conducting a post -exchange debrief to document
successful practices, challenges, and program improvements for future exchanges.
Commissioner Joseph Aihara reported that Mito representatives have begun
matching students and host families and are awaiting student information from
Anaheim to complete the process. Mito received 27 applications and plans to finalize
selections by June 14, 2026.
Anaheim Sister City Commission
May 26, 2026
Page 3
XI. STAFF COMMENTS
Staff member Karen Harrell re -confirmed the Anniversary celebration dates and the
number of people expected to come down from Mito. As of right now, about 15-20
so far, although the number is not confirmed.
XII. ADJOURNMENT
There being no further business, the meeting adjourned at 5:00 p.m. to Monday, June
29, 2026, at 4:00 p.m.