Resolution-PC2026-009RESOLUTION NO. PC2026-009
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY
OF ANAHEIM APPROVING A FINAL PLAN TO PERMIT A 50-UNIT
CONDOMINIUM RESIDENTIAL DEVELOPMENT AND MAKING
CERTAIN FINDINGS IN CONNECTION THEREWITH
(DEV2023-00012)
(3036 WEST LINCOLN AVENUE)
WHEREAS, the Planning Commission of the City of Anaheim (the "Planning
Commission") did receive a verified petition to approve a final plan for a 50-unit for -sale
condominium development which is inclusive of five affordable units for low-income households
(the "Proposed Project") on certain real property located at 3036 West Lincoln Avenue in the City
of Anaheim, County of Orange, State of California, as generally depicted on Exhibit A attached
hereto and incorporated herein by this reference (the 'Property"); and
WHEREAS, the Property is approximately 0.67 acres in area and was formerly
developed with a motel which was demolished in 2002 and has since been vacant. The Property is
designated Mixed -Use High land uses in the General Plan. The Property is in the Mixed -Use High
(MU-H) Development Area of the Beach Boulevard Specific Plan No. 2017-1 (SP 2017-1) and is
subject to the zoning and development standards contained in Chapter 18.122 (Beach Boulevard
Specific Plan No. 2017-1 Zoning and Development Standards) of the Anaheim Municipal Code
(the "Code"); and
WHEREAS, the final plan is proposed in conjunction with a request for a tentative tract
map to permit a one -lot subdivision for condominium purposes. The final plan and Tentative Tract
Map No. 19393, shall be referred to herein collectively as the 'Proposed Project"; and
WHEREAS, Chapter 18.122 (Beach Boulevard Specific Plan No. 2017-1 Zoning and
Development Standards) prescribes the methods and procedures for implementation of the SP
2017-1, which for the Proposed Project requires the processing and approval of a final plan in
accordance with Chapter 18.70 (Final Plan Reviews) of Title 18 (Zoning) of the Code; and
WHEREAS, Section 18.60.080 (Planning Director Reviews) of Chapter 18.60
(Procedures) of the Code provides that, when an application is made in conjunction with, and as
part of, a project that requires Planning Commission action, the application shall be made to the
Planning Commission in accordance with Chapter 18.60, and because the Proposed Project
includes a tentative tract map that requires Planning Commission action, the final plan is being
processed concurrently before the Planning Commission as the granting authority; and
WHEREAS, pursuant to and in accordance with the provisions of the California
Environmental Quality Act (Public Resources Code Section 21000 et seq.; herein referred to as
"CEQA"), the State of California Guidelines for Implementation of the California Environmental
Quality Act (Title 14 of the California Code of Regulations; herein referred to as the "CEQA
Guidelines"), the City is the "lead agency" for the preparation and consideration of environmental
documents for the Proposed Project; and
WHEREAS, the Planning Commission did hold a public hearing at the Civic Center in
the City of Anaheim on April 6, 2026 at 5:00 p.m., with notice of said public hearing having been
duly given as required by law and in accordance with the provisions of Chapter 18.60 (Procedures)
of the Code, to hear and consider evidence for and against the Proposed Project and to investigate
and make findings and recommendation in connection therewith; and
WHEREAS, the Planning Commission finds that the effects of the Proposed Project
are Categorically Exempt from the requirements to prepare additional environmental
documentation per CEQA Guidelines, Section 15315 — Minor Land Divisions. The Proposed
Project is a request to subdivide the property into a one -lot map for condominium purposes, and
the subject site is located in an urbanized area within the Mixed -Use High development area of
the SP 2017-01 and is designated for Mixed -Use High land uses in the General Plan which permits
residential uses. The proposed subdivision would be in conformance with the General Plan and
applicable development standards, with the exception as those that are granted under State Density
Bonus law. All services and access to the property would be provided in accordance with local
standards, the property was not involved in the division of a larger parcel within the previous two
years, and the parcel does not have an average slope greater than 20 percent and the project would
therefore be consistent with this type of exemption. Additionally, the Proposed Project is exempt
from the requirement to prepare additional environmental documentation per CEQA Guidelines,
Section 15182(c) —Residential Projects Implementing a Specific Plan. In 2018, the City Council
certified Environmental Impact Report (EIR) No. 350, prepared for the Beach Boulevard Specific
Plan No. 2017-1 ("SP 2017-1 ") which adequately analyzed future residential developments project
pursuant to CEQA Guidelines. The Proposed Project implements SP 2017-1 and the Mixed -Use
High Development Area development standards set forth therein for a permitted density and land
use. Applicable mitigation measures from EIR No. 350 have been included as conditions of
approval. Further, no revisions to certified EIR No. 350 are required by the Proposed Project or a
result of changed circumstances due to the involvement of new significant effects or substantial
increase in the severity of previously identified significant effects; and, there is no new information
that shows the Proposed Project will have significant effects not discussed in EIR No. 350 or that
these significant effects will be substantially more sever; and
WHEREAS, the Planning Commission, after due inspection, investigation and study made
by itself and in its behalf, and after due consideration of all evidence and reports offered at said
hearing with respect to the request to approve the final plan, does find and determine the following
facts:
1. The design and layout of the proposed development are consistent with the General
Plan, any applicable specific plan, the development standards of the applicable zoning district, and
any special area guidelines or policies as the proposed multiple -family development is a permitted
use within the SP 2017-01 and is consistent with the applicable General Plan land use designation.
The Proposed Project conforms to the development standards of the Mixed -Use High designation,
except where modifications are authorized through State Density Bonus Law. The intent of the
- 2 - PC2026-009
Mixed -Use High development area is to allow a mix of uses, including residential, commercial,
services, hospitality, and professional office use, in a high -quality environment. Uses and activities
should be designed together to create a dynamic urban environment. Typical residential uses
include stacked flats, live -work units, townhouses, and lofts.
The Proposed Project incorporates requested Incentives and Waivers that are consistent
with State law that allow for the development of a 50-unit residential project, including five units
reserved for low-income households. Based on the project setting within the Mixed -Use High
development area, reduced setbacks would reinforce the urban -style streetscape without negatively
impacting the neighborhood. The site design, building configuration, and overall layout are
consistent with the applicable standards as otherwise modified by applicable State Density Bonus
Law, and implement the intended residential density and development pattern envisioned for the
site.
2. The design and layout of the proposed development will not create traffic or
pedestrian hazards. As described in the Proposed Project narrative, the Proposed Project provides
vehicular access from Lincoln Avenue, with a turnaround area incorporated at the Proposed Project
entry to allow vehicles to maneuver on -site and exit without queuing onto the public street in the
event of a gate malfunction or other obstruction. This design feature would provide on -site
circulation by allowing vehicles to turn around on -site and reducing the potential for congestion
along Lincoln Avenue. The front setback improvements would maintain the required visibility
triangle free of obstructions to ensure clear sightlines between drivers and pedestrians. The
Proposed Project would provide covered pedestrian walkways connecting common open space
and amenity areas throughout the site. Collectively, the site design, internal circulation, and
frontage improvements promote safe and efficient vehicular and pedestrian movements.
3. The design of the proposed development is consistent with applicable objective
design standards and will provide a desirable environment for its occupants, visiting public, its
neighbors, and be appropriately maintained. The Proposed Project complies with the applicable
objective design and development standards of SP 2017-01, including requirements related to
building height, setbacks, open space, landscaping, and architectural design, with permitted
modifications pursuant to State Density Bonus Law through approved Incentives and Waivers.
The development would feature a modern architectural design with articulated facades,
varied materials, and architectural detailing that provide visual interest and reduce perceived
massing. The site is designed to accommodate the proposed residential density as allowed by State
Density Bonus Law, while maintaining functionality, efficient circulation, and livability. Common
and private open space areas, including a roof terrace with seating, landscaping, and recreational
amenities, provide meaningful opportunities for resident use and contribute to a high -quality living
environment. A homeowner's association would be established to manage and maintain all
common areas and the overall residential community.
4. The proposed development will not be detrimental to the public health, safety or
welfare, or materially injurious to the properties or improvements in the vicinity because the use
is permitted within the Mixed -Use High development area, the site is designed with on -site
parking, internal circulation, emergency access, and required life safety improvements, and the
- 3 - PC2026-009
Proposed Project has been reviewed for compliance with applicable development standards, as
modified by State Density Bonus Law. The Proposed Project would not introduce hazardous
conditions or safety concerns, as it consists of a residential use that would be compatible with the
surrounding area and permitted within the applicable development area. Furthermore, the site is
surrounded by commercial uses and is located within an area planned for mixed -use development.
The proposed residential use would support the long-term vision of horizontal mixed -use
development, where nearby commercial uses may serve future residents. Given the Proposed
Project's setting within the mixed -use high development area, reduced setbacks would reinforce
the urban streetscape style without negatively impacting the neighborhood; and
WHEREAS, this Planning Commission determines that the evidence in the record
constitutes substantial evidence to support the actions taken and the findings made in this
Resolution, that the facts stated in this Resolution are supported by substantial evidence in the
record, including testimony received at the public hearing, the staff presentations, the staff report,
and all materials in the Proposed Project files. There is no substantial evidence, nor are there other
facts, that negate the findings made in this Resolution. This Planning Commission expressly
declares that it considered all evidence presented and reached these findings after due
consideration of all evidence presented to it.
NOW, THEREFORE, BE IT RESOLVED, that pursuant to the above findings, this
Planning Commission does hereby approve the final plan, contingent upon approval of Tentative
Tract Map No. 19393 and subject to the conditions of approval set forth in Exhibit B attached
hereto and incorporated herein by this reference, which are hereby found to be a necessary
prerequisite to the proposed use of the Property for which the final plan is applicable in order to
preserve the health, safety and general welfare of the citizens of the City of Anaheim. Extensions
for further time to complete conditions of approval may be granted in accordance with Section
18.60.170 (Extension of Time to Comply With Conditions of Approval) of the Code. Timing for
compliance with conditions of approval may be amended by the Planning and Building Director
upon a showing of good cause provided (i) equivalent timing is established that satisfies the
original intent and purpose of the condition, (ii) the modification complies with the Code, and (iii)
the applicant has demonstrated significant progress toward establishment of the use or approved
development.
BE IT FURTHER RESOLVED, that any amendment, modification, or revocation of
this permit may be processed in accordance with Chapters 18.60.190 (Amendment of Permit
Approval) and 18.60.200 (Revocation or Modification of Permits) of the Code.
BE IT FURTHER RESOLVED, that the Planning Commission does hereby find and
determine that adoption of this Resolution is expressly predicated upon applicant's compliance
with each and all of the conditions hereinabove set forth. Should any such condition, or any part
thereof, be declared invalid or unenforceable by the final judgment of any court of competent
jurisdiction, then this Resolution, and any approvals herein contained, shall be deemed null and
void.
BE IT FURTHER RESOLVED, that approval of this application constitutes approval
of the proposed request only to the extent that it complies with the Code and any other applicable
- 4 - PC2026-009
City, State and Federal regulations. Approval does not include any action or findings as to
compliance or approval of the request regarding any other applicable ordinance, regulation, or
requirement.
THE FOREGOING RESOLUTION was adopted at the Planning Commission meeting
of April 6, 2026. Said resolution is subject to the appeal provisions set forth in Chapter 18.60
(Procedures) of the Anaheim Municipal Code pertaining to appeal procedures and may be replaced
by a City Council Resolution in the event of an appeal.
CHAIRPERKON, PLANNING COMMISSION
OF THE CITY OF ANAHEIM
ATTEST:
SECRETARY, PLANNING COMMISSION
OF THE CITY OF ANAHEIM
- 5 - PC2026-009
EXHIBIT "A"
DEV NO.2023-00012
PC2026-009
EXHIBIT "B"
FINAL PLAN
(DEV2023-00012)
Mitigation Monitoring Plan No. 342 (Beach Boulevard Specific Plan EIR No. 350)
Applicable mitigation measures from Mitigation Monitoring Plan No. 342 are included as
conditions of approval [MM].
Mitigation Monitoring Plan No. 394 (General Plan Focused Update Program EIR No. 356)
Master Standard Conditions of Approval applicable to all discretionary development projects are
included as [SC].
RESPONSIBLE
NO.
CONDITIONS OF APPROVAL
DEPARTMENT
ON -GOING THROUGHOUT THE OPERATION OF THE PROJECT
1
The gate located at the southern edge of the property adjacent to
Public Works,
the alley shall be restricted for emergency vehicle and trash
Traffic Engineering
collection access only. This gate shall not provide any direct
residential ingress oregress access
2
Association and/or Owner shall maintain the screening for all
Planning and Building
ground -mounted equipment in the front yard to the maximum
Department,
extent possible throughout the operation of the project.
Planning Services Division
PRIOR TO ISSUANCE OF GRADING PERMIT
3
Prepare and submit a final grading plan showing building
Public Works,
footprints, pad elevations, finished grades, drainage routes,
Development Services
retaining walls, erosion control, slope easements and other
pertinent information in accordance with Anaheim Municipal
Code and the California Building Code, latest edition.
4
Prepare and submit a final drainage study, including supporting
Public Works,
hydraulic and hydrological data to the City of Anaheim for
Development Services
review and approval. The study shall confirm or recommend
changes to the City's adopted Master Drainage Plan by
identifying off -site and on -site storm water runoff impacts
resulting from build -out of permitted General Plan land uses. In
addition, the study shall identify the project's contribution and
shall provide locations and sizes of catchments and system
connection points and all downstream drainage -mitigating
measures including but not limited to offsite storm drains and
interim detention facilities.
5
The developer shall execute a Save Harmless Agreement with
Public Works,
the City of Anaheim for any storm drain connections to a City
Development Services
storm drain system. The agreement shall be recorded by the
applicant on the property prior to the issuance of any permits.
- 7 - PC2026-009
NO.
CONDITIONS OF APPROVAL
RESPONSIBLE
DEPARTMENT
6
All required plans and studies shall be prepared by a Registered
Public Works,
Professional Engineer.
Development Services
7
Submit Water Quality Management Plan (WQMP) to the City
Public Works,
for review and approval. The WQMP shall be consistent with the
Development Services
requirements of Section 7 and Exhibit 7.II of the Orange County
Drainage Area Management Plan (DAMP) for New
Development/ Significant Redevelopment projects. Identify
potential sources of pollutants during the long-term on -going
maintenance and use of the proposed project that could affect the
quality of the stormwater runoff from the project site; define
Source Control, Site Design, and Treatment Control (if
applicable) best management practices (BMPs) to control or
eliminate the discharge of pollutants into the surface water
runoff; and provide a monitoring program to address the long-
term implementation of and compliance with the defined BMPs.
Submit the Final WQMP Report and a plan checking deposit to
the Public Works, Development Services for consideration and
approval.
8
Submit a Preliminary Geotechnical Report to the Public Works,
Public Works,
Development Services Division for review and approval. The
Development Services
report shall address any proposed infiltration features of the
WQMP.
9
Prior to issuance of grading, demolition or building permits,
Planning and Building
whichever occurs first, the property owner/developer shall
Department,
provide a list of all construction equipment proposed to be used
Building Division
on the project site for projects that are subject to the California
Environmental Quality Act (i.e., non-exempt projects). This list
may be provided on the building plans. The construction
equipment list shall state the make, model, and equipment
identification number of all the equipment. [MM AQ-21
10
Prior to issuance of grading, demolition or building permits,
Planning and Building
whichever occurs first, for projects subject to the California
Department,
Environmental Quality Act (i.e., non-exempt projects), the
Building Division
property owner/developer shall submit a dust control plan that
implements the following measures during ground -disturbing
activities, in addition to the existing requirements for fugitive
dust control under South Coast Air Quality Management District
Rule 403, to further reduce PM10 and PM2.5 emissions:
a) Following all grading activities, the construction
contractor shall reestablish ground cover on the
construction site through seeding and watering.
b) During all construction activities, the construction
contractor shall sweep streets with Rule I I86—com liant,
- 8 - PC2026-009
NO.
CONDITIONS OF APPROVAL
RESPONSIBLE
DEPARTMENT
PM10-efficient vacuum units on a daily basis if silt is
carried over to adjacent public thoroughfares or occurs as
a result of hauling.
c) During all construction activities, the construction
contractor shall maintain a minimum 24-inch freeboard
on trucks hauling dirt, sand, soil, or other loose materials
and tarp materials with a fabric cover or other cover that
achieves the same amount of protection.
d) During all construction activities, the construction
contractor shall water exposed ground surfaces and
disturbed areas a minimum of every three hours on the
construction site and a minimum of three times per day.
e) During all construction activities, the construction
contractor shall limit onsite vehicle speeds on unpaved
roads to no more than 15 miles per hour.
The City shall verify compliance during normal construction site
inspections. [MM AQ-81
11
Prior to the issuance of any permits allowing ground -disturbing
Public Works Department,
activities that cause excavation to depths greater than current
Planning and Building
foundations, the project applicant/developer shall retain an
Department, Planning
archeologist who meets the Secretary of the Interior's Standards
Services
for professional archaeology for the project and will be on call
during all grading and other significant ground -disturbing
activities. The Qualified Archaeologist shall ensure that the
following measures are followed for the project.
• Prior to any ground disturbance, the Qualified
Archaeologist, or their designee, shall provide a worker
environmental awareness protection (WEAP) training to
construction personnel regarding regulatory
requirements for the protection of cultural (prehistoric
and historic) resources. As part of this training,
construction personnel shall be briefed on proper
procedures to follow should unanticipated cultural
resources be made during construction. Workers will be
provided contact information and protocols to follow in
the event that inadvertent discoveries are made. The
WEAP training can be in the form of a video or
PowerPoint presentation. Printed literature (handouts)
can accompany the training and can also be given to new
workers and contractors to avoid the necessity of
continuous training over the course of the project.
• In the event that unanticipated cultural material is
encountered during any phase of project construction, all
- 9 - PC2026-009
NO.
CONDITIONS OF APPROVAL
RESPONSIBLE
DEPARTMENT
construction work within 50 feet (15 meters) of the find
shall cease and the Qualified Archaeologist shall assess
the find for importance. Construction activities may
continue in other areas. If, through consultation with the
appropriate City, the discovery is determined not to be
important, work will be permitted to continue in the area.
• If a resource is determined by the Qualified
Archaeologist to constitute a "historical resource"
pursuant to CEQA Guidelines Section 15064.5(a) or has
a "unique archaeological resource" pursuant to Public
Resources Code Section 21083.2(g), the Qualified
Archaeologist shall coordinate with the applicant and the
City to develop a formal treatment plan that would serve
to reduce impacts to the resources, and construction
allowed to proceed. The treatment plan established for
the resources shall be in accordance with CEQA
Guidelines Section 15064.5(f) for historical resources
and Public Resources Code Sections 21083.2(b) for
unique archaeological resources. Preservation in place
(i.e., avoidance) is the preferred manner of treatment.
• If preservation in place is not feasible, treatment may
include implementation of archaeological data recovery
excavations to remove the resource along with
subsequent laboratory processing and analysis.
Any historic archaeological material that is not Native American
in origin shall be curated at a public, nonprofit institution with a
research interest in the materials, such as the South Central
Coastal Information Center at California State University,
Fullerton. If no institution accepts the archaeological material,
they shall be donated to a local school or historical society in the
area for educational purposes, as determined as appropriate by
the City of Anaheim. IMM CUL-31
12
Prior to the beginning of ground disturbances, the project
Public Works Department,
applicant/developer shall provide a study to document the
Planning and Building
presence/absence of paleontological resources. On properties
Department, Planning
where resources are identified, the City shall require the project
Services
applicant/developer to retain a qualified paleontologist to
monitor ground disturbing activities that occur in deposits that
could potentially contain paleontological resources (e.g., older
Quaternary Alluvium and terrace deposits and other older
sedimentary deposits). Before ground -disturbing activities
begin, a qualified paleontologist shall prepare a monitoring plan
specifying the frequency, duration, and methods of monitoring.
- 10 - PC2026-009
RESPONSIBLE
NO.
+CONDITIONS OF APPROVAL
DEPARTMENT
Sediment samples shall be collected in the deposits and
processed to determine the small -fossil potential in the project
site, and any fossils recovered during mitigation should be
deposited in an accredited and permanent scientific institution.
[MM PAL-11
13
Prior to the issuance of grading permits for individual
Planning and Building
development projects that would be accommodated by the
Department, Planning
Proposed Project, the project applicant/developer shall submit a
Services Division,
Phase I Environmental Site Assessment (ESA) to the City of
Building Division
Anaheim to identify environmental conditions of the
development site and determine whether contamination is
present. The Phase I ESA shall be prepared by a Registered
Professional Engineer and in accordance with the American
Society for Testing and Materials (ASTM) Standard E 1527.05,
Standard Practice for Environmental Site Assessments: Phase I
Environmental Site Assessment Process. If recognized
environmental conditions related to soils are identified in the
Phase I ESA, the project applicant shall perform soil sampling
as a part of a Phase 11 ESA. If contamination is found at
significant levels, the project applicant shall remediate all
contaminated soils in accordance with state and local agency
requirements (California Department of Toxic Substances
Control, Regional Water Quality Control Board, Anaheim Fire
& Rescue, etc.). All contaminated soils and/or material
encountered shall be disposed of at a regulated site and in
accordance with applicable laws and regulations prior to the
completion of grading. Prior to the issuance of building permits,
a report documenting the completion, results, and any follow-up
remediation on the recommendations, if any, shall be provided
to the City of Anaheim evidencing that all site remediation
activities have been completed. [MM HAZ-21
14
Prior to issuance of demolition, grading and/or building permits,
Planning and Building
a note shall be provided on plans for grading, demolition, and
Department, Planning
construction activities, indicating that the property
Services Division,
owner/developer shall be responsible for requiring contractors to
Building Division
implement the following measures to limit construction -related
noise:
• Construction activity is limited to the daytime hours
between 7:00 a.m. to 7:00 p.m., as prescribed in the
City's Municipal Code (Additional work hours may be
permitted if deemed necessary by the Director of Public
Works or Building Official).
- 11 - PC2026-009
NO.
CONDITIONS OF APPROVAL
RESPONSIBLE
DEPARTMENT
• All internal combustion engines on construction
equipment and trucks are fitted with properly maintained
mufflers.
• Stationary equipment such as generators and air
compressors shall be located as far as feasible from
nearby noise -sensitive uses.
• Stockpiling is located as far as feasible from nearby
noise -sensitive receptors
Construction traffic shall be limited to the established haul
routes. [MM N-11
15
Prior to the issuance of grading permits, each project applicant
Public Works Department,
within the project area shall prepare a construction management
Traffic Engineering
plan that shall be approved by the City of Anaheim Public
Works. The construction management plan shall:
• Establish truck haul routes on the appropriate
transportation facilities. Truck routes that avoid
congested streets and sensitive land uses shall be
considered.
• Provide Traffic Control Plans (for detours and temporary
road closures) that meet the minimum City criteria.
Traffic control plans shall determine if dedicated turn
lanes for movement of construction trucks and
equipment on- and off -site are available.
• Minimize off -site road closures during the peak hours.
• Keep all construction -related traffic onsite at all times.
Provide temporary traffic controls, such as a flag person, during
all phases of construction to maintain smooth traffic flow. [MM
N-21
16
Prior to issuance of demolition, grading, or building permits,
Public Works Department,
whichever occurs first, the developer/applicant shall pay sewer
Planning and Building
impact fees per the updated the Combined West Anaheim Area
Department, Planning
Master Plan of Sanitary Sewers described in Mitigation Measure
Services Division
USS-l. [MM USS-21
17
Prior to issuance of demolition, grading, building or water
Public Works Department,
permits, whichever occurs first, the property owner/developer
Planning and Building
shall submit plans to the Public Utilities Department for review.
Department, City
The Public Utilities Department shall review the location of each
Attorney's Office
project to determine if it is an area served by potentially deficient
water facilities, as identified in the latest updated water study for
the BBSP. In such a case, the property owner/developer shall
perform a hydraulic analysis for the existing and proposed public
water improvements to determine if the project domestic or fire
flow demands will increase flows beyond those programmed in
- 12 - PC2026-009
NO.
CONDITIONS OF APPROVAL
RESPONSIBLE
DEPARTMENT
the appropriate water master plan study for the area or if the
project will create a deficiency in existing water mains. The
hydraulic water analysis for the existing and proposed public
water improvements shall incorporate the anticipated flow,
pressure, and any other information specific for the project to
determine the conditions for final design. With the hydraulic
water analysis, the property owner/developer shall submit the
results of a field fire flow test and provide a written response
from Anaheim Fire Department confirming the fire flow
requirements for the project. The property owner/developer shall
be required to guarantee mitigation of the impact to adequately
serve the area to the satisfaction of the Public Utilities
Department and City Attorney's Office per Anaheim's most
current Water Rules and Regulations. MM USS-3
18
Prior to approval of each grading plan or issuance of each
Planning and Building
demolition or building permits, whichever occurs first, a
Department,
Construction Barrier Plan showing the location and types of
Building Division
barriers to be in place during grading and construction. Said plan
shall provide for all construction areas to be screened from view
in compliance with the City of Anaheim Municipal Code and
shall include provision for the type and height of the barriers to
be placed along all construction perimeters prior to the
commencement of demolition, Site preparation or grading,
whichever occurs first. SC AE-6
19
Applicants for future development projects which will generate
Planning and Building
construction -related exhaust emissions shall ensure off -road
Department,
diesel -powered construction equipment greater than 50
Planning Services
horsepower meets CARB Tier 4 Final off -road emissions
Division, Building
standards. Requirements for Tier 4 Final equipment shall be
Division
included in applicable bid documents and successful
contractor(s) must demonstrate the ability to supply such
equipment. A copy of each equipment's Best Available Control
Technology (BACT) documentation (certified tier specification
or model year specification), and CARB or SCAQMD operating
permit (if applicable) shall be provided to the City prior to
obtaining the grading permit. If Tier 4 Final equipment is not
available, alternative measures may include the use of added
exhaust devices, alternatively fueled equipment, such as the use
of Tier 3 engines that include CARB Level 3 verifiable diesel
emission control devices that altogether achieve an 85 percent
reduction in particulate matter exhaust and 40 percent reduction
in NOX in comparison to uncontrolled equipment. [SC AQ-9]
- 13 - PC2026-009
NO.
CONDITIONS OF APPROVAL
RESPONSIBLE
DEPARTMENT
20
If construction activity involves tree removals or construction
Planning and Building
activities in proximity to trees, and is timed to occur during the
Department,
nesting season (typically February 1 through July 31), prior to
Planning Services Division
the issuance of the first demolition/grading/building permit,
owners/developers will be required to provide focused surveys
to the Planning and Building Department for nesting birds
pursuant to CDFW requirements. Such surveys shall identify
avoidance measures taken to protect active nests. [SC BIO-3]
21
Any crushing of existing habitat during the breeding season of
Planning and Building
the gnatcatcher shall occur only under the supervision of a
Department,
biological monitor and other mitigation measures as required by
Planning Services Division
CDFW may apply. [SC BIO-4]
22
Prior to issuance of a grading permit for any project potentially
Planning and Building
affecting wildlife movement, the owner/developer shall submit a
Department,
biological resources analysis which assesses potential impacts to
Planning Services Division
wildlife movement. SC BIO-8
23
Prior to the issuance of a demolition permit, grading permit, or
Planning and Building
building permit, whichever occurs first, a letter detailing the
Department,
proposed schedule for vegetation removal and building
Planning Services Division
demolition activities shall be submitted to the Planning and
Building Department, verifying that removal shall take place
between February 1 to July 31 to avoid the bird nesting season.
[SC BIO-91
24
Prior to the issuance of a demolition permit, grading permit, or
Planning and Building
building permit, whichever occurs first, and if project demolition
Department,
and/or vegetation clearing must occur during the bird nesting
Planning Services Division
season (February 1 to July 31), a pre -construction nesting bird
survey of structures to be demolished and/or vegetation to be
removed shall be conducted by a qualified Biologist no more
than three days prior to such work occurring. If the Biologist
does not find any active nests within or immediately adjacent to
the impact area, the Biologist's findings shall be submitted to the
Planning and Building Department, and the vegetation
clearing/construction work shall be allowed to proceed. The pre -
construction nesting bird survey shall be updated following any
work stoppage of two weeks or longer.
If an active nest of a bird species protected under California Fish
and Game Code or the Migratory Bird Treaty Act is identified
within or immediately adjacent to the construction area, and the
Biologist determines that the nest may be impacted or breeding
activities substantially disrupted, the Biologist shall delineate an
appropriate no -impact buffer zone (at a minimum of 25 feet)
around the nest de ending on the sensitivity of the species and
- 14 - PC2026-009
NO.
CONDITIONS OF APPROVAL
RESPONSIBLE
DEPARTMENT
the nature of the construction activity. All nests and associated
buffers shall be mapped on the construction plans. The active
nest shall be protected until nesting activity has ended. The
following restrictions to clearing and/or construction activities
shall be required until nest(s) are no longer active, as determined
by a qualified Biologist: (1) clearing limits shall be established
within a buffer around any occupied nest (the buffer shall be 25
to 100 feet for nesting birds and 300 to 500 feet for nesting
raptors), unless otherwise determined by a qualified Biologist;
and (2) access shall be restricted within the buffer of any active
nest, unless otherwise determined by a qualified Biologist.
Encroachment into the buffer area around a known nest shall
only be allowed if the Biologist determines that the proposed
activity would not disturb the nest occupants. Once the qualified
Biologist has determined that fledglings have left the nest, there
is no evidence of a second nesting attempt, or the nest has failed,
the Biologist's findings shall be submitted to the Planning and
Building Department, and construction can proceed within the
buffer zone. [SC BIO-101
25
City staff shall require property owners/developers to provide
Planning and Building
studies to document the presence/absence of archaeological
Department,
and/or paleontological resources for areas with documented or
Planning Services Division
inferred resource presence (i.e., presence of native soils that
would be disturbed). On properties where resources are
identified or a potential for presence exists, such studies shall
provide a detailed mitigation plan, including a monitoring
program and recovery and/or in situ preservation plan, based on
the recommendations of a qualified specialist. SC CUL-2
26
Potentially significant cultural resources consist of, but are not
Planning and Building
limited to, stone, bone, fossils, wood, or shell artifacts or
Department,
features, including hearths, structural remains, or historic
Planning Services Division
dumpsites. Any previously undiscovered resources found during
construction within the project site should be recorded on
appropriate California Department of Parks and Recreation
forms and evaluated for significance in terms of CEQA
Guidelines. Appropriate mitigation measures for significant
resources could include avoidance or capping, incorporation of
the site in green space, parks, or open space, or data recovery
excavations of the finds. No further grading shall occur in the
area of the discovery until the Lead Agency approves the
measures to protect these resources. Any archaeological artifacts
recovered as a result of mitigation shall be donated to a qualified
scientific institution approved by the Lead Agency, where they
- 15 - PC2026-009
RESPONSIBLE
NO.
CONDITIONS OF APPROVAL
DEPARTMENT
would be afforded long-term preservation to allow future
scientific study. [SC CUL-6]
27
Prior to the issuance of any grading permits, the project
Planning and Building
proponent shall produce evidence acceptable to the Public
Department, Building
Works, that:
Division
• All construction vehicles or equipment, fixed or mobile,
operated within 500 feet of a noise -sensitive use, shall be
equipped with properly operating and maintained
mufflers
• All operations shall comply with City of Anaheim
Municipal Code Chapter 6.70.
Stockpiling and/or vehicle staging areas shall be located as far as
practicable from dwellings. SC NOI-1
28
In the event that tribal cultural resources such as human remains
Planning and Building
and artifacts are inadvertently unearthed during excavation
Department,
activities, the contractor shall immediately cease all earth-
Planning Services Division
disturbing activities within a 100-foot radius of the area of
discovery, and the contractor shall contact the City's Planning
and Building Department immediately. The Applicant shall
retain a qualified Native American tribal monitor from or
approved by the Native American tribe(s) requesting
consultation to evaluate the significance of the find, and in
consultation with the City's Planning and Building Department,
determine an appropriate course of action. If the tribal cultural
resources are found to be significant, the Native American tribal
monitor, in consultation with the City's Planning and Building
Department, shall determine appropriate actions for exploration,
salvage, and/or curation. After the find has been explored,
salvaged, and/or curated, work within the vicinity of the find
may resume. [SC TCR-11
29
If the monitoring site has hazardous materials concerns, the
Planning and Building
monitor(s) shall possess Hazardous Waste Operations and
Department,
Emergency Response (HAZWOPER) certification. The on -site
Planning Services Division
monitoring shall end when the project site grading and
excavation activities are completed, or when the Tribal
Representatives and monitor have indicated that the site has a
low potential for tribal cultural resources. [SC TCR-2]
30
The owner/developer shall obtain the required coverage under
Public Utilities,
California's General Permit for Stormwater Discharges
Water Engineering
associated with Construction Activity by providing a copy of the
Notice of Intent (NOI) submitted to the State Resources Control
Board and a copy of the subsequent notification of the issuance
- 16 - PC2026-009
NO.
CONDITIONS OF APPROVAL
RESPONSIBLE
DEPARTMENT
of a Waste Discharge Identification (WDID) number. [SC HYD-
31
31
Prior to the issuance of any grading and building permits,
Housing and Community
whichever occurs first for an Affordable For -sale Housing
Development Department
Development, Applicant/Owner shall execute and cause to be
recorded against the Property the Housing Incentives
Agreement, and if required by the Housing Incentives
Agreement, a declaration of covenants, conditions and
restrictions ("CC&R's") that sets forth the terms and conditions
of approval of said Housing Incentives. The Housing Incentives
Agreement/CC&Rs shall be binding on the Applicant/Owner
and all future owners and successors -in -in -interest of the
Property, and shall be and remain a senior, non -subordinate
encumbrance against the subject Property.
PRIOR TO ISSUANCE OR'A BUILDING PERMIT
32
Construction plans shall be submitted to the Building Division
Planning and Building
for review and issuance of any future building permit(s).
Department,
Construction plans shall comply with California Building Codes,
Building Division
as adopted and in effect at time of plan submittal. California
Building Code (CBC); California Plumbing Code (CPC);
California Mechanical Code (CMC); California Electrical Code
(CEC); California Residential Code (CRC); California Energy
Code (Energy); and California Green Building Standards Code
CGBSC .
33
All CBC and CFC requirements shall be followed for permit
Anaheim Fire and Rescue
issuance. Any fire permits shall be submitted directly to
Department
Anaheim Fire Prevention Bureau.
34
All drivable surfaces - Permanent, temporary, and phased
Anaheim Fire and Rescue
emergency access roads shall be designed and maintained to
Department
support an imposed load of 78,000 lbs. and surfaced to provide
all-weather driving capabilities
35
Emergency Responder Radio Communication System shall be
Anaheim Fire and Rescue
provided
Department
36
AM&M shall be provided onto the architectural plan set for
Anaheim Fire and Rescue
reference.
Department
37
Record Tract Map No.19393 pursuant to the Subdivision Map
Public Works,
Act and in accordance with City Code. Provide a duplicate photo
Development Services
M lar of the recorded map to the City Engineer's office.
38
Provide a certificate from the project's Registered Civil Engineer
Public Works,
certifying that the rough grading for the building pad(s) has been
Development Services
completed in accordance with the City -approved grading plan.
- 17 - PC2026-009
NO.
CONDITIONS OF APPROVAL
RESPONSIBLE
DEPARTMENT
39
All onsite sewer lines shall be privately owned and maintained
Public Works,
by the property owner/HOA and shall be designed per current
Development Services
CA Building/Plumbing Code, and shall be submitted, reviewed
and approved by the Building Division.
40
A Right of Way Construction Permit shall be obtained from the
Public Works,
Development Services Division for all work performed in the
Development Services
public right-of-way.
41
All Landscape plans shall comply with the City of Anaheim
Public Works,
adopted Landscape Water Efficiency Guidelines. This ordinance
Development Services
is in compliance with the State of California Model Water
Efficient Landscape Ordinance (AV 1881).
42
Submit an interim soils report indicating pad compaction and site
Public Works,
stability prepared by the project's Geotechnical Engineer of
Development Services
Record. The pad compaction report shall include a site plan
showing the compaction testing locations.
43
A cash -in -lieu payment based on the Civil Engineer of Record
Public Works,
cost estimate, in an amount determined by the City Engineer to
Development Services
be sufficient to pay for future street widening along Lincoln
Avenue, including utility relocations, required offsite BMPs,
etc., necessary for the widening to its ultimate location, shall be
aid to the City of Anaheim.
44
Applicants for new development projects in the Beach
Planning and Building
Boulevard Area Specific Plan that are subject to the California
Department, Planning
Environmental Quality Act (i.e., non-exempt projects) shall
Services Division
require the construction contractor to use equipment that meets
the US Environmental Protection Agency (EPA) Tier 4
emissions standards for offroad diesel -powered construction
equipment with more than 50 horsepower, unless it can be
demonstrated to the City of Anaheim that such equipment is not
available. Any emissions control device used by the contractor
shall achieve emissions reductions that are no less than what
could be achieved by a Level 4 diesel emissions control strategy
for a similarly sized engine, as defined by the California Air
Resources Board's regulations. Prior to issuance of any
construction permits, documentation shall be provided by the
applicant to the City of Anaheim that verifies, to the satisfaction
of the City, the use of construction equipment as stated in this
mitigation measure. MM AQ-1
45
Prior to issuance of a building permit for projects that are subject
Planning and Building
to the California Environmental Quality Act (i.e., non-exempt
Department, Planning
projects), the property owner/developer shall require the
Services Division
construction contractor and provide a note on construction plans
indicating that:
- 18 - PC2026-009
NO.
CONDITIONS OF APPROVAL
RESPONSIBLE
DEPARTMENT
a) All coatings and solvents will have a volatile organic
compound (VOC) content lower than required under
Rule 1113 (i.e., super compliant paints).
b) All architectural coatings shall be applied either by (1)
using a high -volume, low-pressure spray method
operated at an air pressure between 0.1 and 10 pounds
per square inch gauge to achieve a 65 percent application
efficiency; or (2) manual application using a paintbrush,
hand -roller, trowel, spatula, dauber, rag, or sponge, to
achieve a 100 percent applicant efficiency.
c) The construction contractor shall also use
precoated/natural colored building materials, where
feasible. The City shall verify compliance during normal
construction site inspections. MM AQ-4
46
Prior to the issuance of building permits for new development
Planning and Building
projects in the Project Area, the project applicant shall show on
Department, Building
the building plans that all major appliances (dishwashers,
Division
refrigerators, clothes washers, and dryers) to be
provided/installed are Energy Star certified appliances or
appliances of equivalent energy efficiency. Installation of
Energy Star or equivalent appliances shall be verified by the City
of Anaheim prior to the issuance of a Certificate of Occupancy.
[MM AQ-51
47
Prior to issuance of building permits for non -single-family
Planning and Building
residential and mixed -use residential development projects in the
Department, Planning
Project Area, the project applicant shall indicate on the building
Services Division
plans that the following features have been incorporated into the
design of the building(s). Proper installation of these features
shall be verified by the City of Anaheim prior to the issuance of
a Certificate of Occupancy.
• Electric vehicle charging shall be provided as specified
in Section A4.106.8.2 (Residential Voluntary Measures)
of the CALGreen Code.
• Bicycle parking shall be provided as specified in Section
A4.106.9 (Residential Voluntary Measures) of the
CALGreen Code. MM AQ-61
48
Prior to issuance of a building permit, applicants for projects
Planning and Building
within the Beach Boulevard Specific Plan that involve high-
Department,
vibration construction activities, such as pile driving or vibratory
Planning Services Division
rolling/compacting, shall be evaluated for potential vibration
impacts to nearby sensitive receptors. The project applicant shall
submit a vibration report prepared to the satisfaction of the City
of Anaheim to determine if the use of pile driving and/or
- 19 - PC2026-009
NO.
CONDITIONS OF APPROVAL
RESPONSIBLE
DEPARTMENT
vibratory rolling/compacting equipment would exceed the
Federal Transit Administration's (FTA's) vibration -annoyance
criteria of 78 dB during the daytime or FTA's vibration -induced
architectural damage PPV criteria of 0.2 inches/second for
wood -framed structures or 0.5 inches/second for reinforced
masonry buildings. The construction contractor shall require the
use of lower vibration -producing equipment and techniques.
Examples of lower -vibration equipment and techniques would
include avoiding the use of vibratory rollers near sensitive areas
and/or the use of drilled piles, sonic pile driving, or vibratory pile
driving (as opposed to impact pile driving). [MM N-41
49
Prior to issuance of the first building permit for each building,
Public Works Department,
the property owner/developer shall pay all applicable
Planning and Building
transportation impact fees to the City of Anaheim in amounts
Department, City
determined by the City Council Resolution in effect at the time
Attorney's Office
of issuance of the building permit with credit given for City -
authorized improvements provided by the property
owner/developer; and participate in all applicable
reimbursement or benefit districts which have been established.
MM T-3
50
Per California Water Code, Division 1, Chapter 8, Article 5,
Public Utilities,
Section 537-537.5) as amended by Senate Bill 7, water
Water Engineering
submetering shall be furnished and installed by the
Owner/Developer, and a water submeter shall be installed to
each individual unit. Provisions for the ongoing maintenance and
operation (including meter billing) of the submeters shall be the
responsibility of the Owner and shall be included and recorded
in the Master CC&Rs for the project. [SC USS-4
51
Any backflow assemblies currently installed in a vault must be
Public Utilities,
brought up to current Water Services Administrative Procedures
Water Engineering
and Design Guidelines. Any other large water system equipment
shall be installed to the satisfaction of the Water Engineering
Division outside of the street setback area in a manner fully
screened from all public streets and alleys. Said information shall
be specifically shown on plans and approved by Water
Engineering and Cross Connection Control Inspector. [SC USS-
51
52
All existing water services and fire services shall conform to
Public Utilities,
current Water Services Standards Specifications. Any water
Water Engineering
service and/or fire line that does not meet current standards shall
be upgraded if continued use is necessary or abandoned if the
existing service is no longer needed. The Owner/Developer shall
- 20 - PC2026-009
NO.
CONDITIONS OF APPROVAL
RESPONSIBLE
DEPARTMENT
be responsible for the costs to upgrade or to abandon any water
service or fire line. [SC USS-7]
53
The Owner/Developer shall submit to the Public Utilities
Public Utilities,
Department Water Engineering Division an estimate of the
Water Engineering
maximum fire flow rate and maximum day and peak hour water
demands for the project. This information will be used to
determine the adequacy of the existing water system to provide
the estimated water demands. Any off -site water system
improvements required to serve the project shall be done in
accordance with Rule No. 15A.1 of the Water Utility Rates,
Rules, and Regulations. SC USS-101
54
Prior to issuance of each building permit, the property
Planning and Building
owner/developer shall demonstrate on plans that fuel -efficient
Department,
models of gas -powered building equipment have been
Building Division
incorporated into the proposed project to the extent feasible. [SC
EN-7]
55
Prior to issuance of a building permit, the property
Planning and Building
owner/developer shall incorporate feasible renewable energy
Department,
generation measures into the project. These measures may
Building Division
include but not be limited to use of renewable biofuels, solar and
small wind turbine sources on new and existing facilities and the
use of solar powered lighting in parking areas. [SC EN-8]
56
Prior to issuance of a building permit, the owner/developer shall
Public Works Department,
submit plans that specifically indicate that all vehicular ramps
Traffic Engineering
and grades conform to all applicable Engineering Standards. [SC
TRN-2
57
Prior to the issuance of building permits, street improvement
Public Works Department,
plans shall be submitted by the owner/developer to the Public
Traffic Engineering
Works Department, Traffic Engineering, for review and
approval of proposed signing and/or red curb painting. Signage
and curb painting modifications shall be installed per the
approved plans and shall be completed prior to the first final
building and zoning inspection. [SC TRN-31
58
That prior to the issuance of building permits, plans shall show
Public Works Department,
conformance with the current version of Engineering Standard
Traffic Engineering
Detail 470 and 473 pertaining to parking standards. NO
PARKING pavement markings shall be provided on both sides
of the trash enclosure. The subject property shall thereupon be
developed and maintained in conformance with said plans. [SC
TRN-4
59
Prior to the issuance of a building permit, the owner/developer
Planning and Building
shall submit draft Covenants Conditions and Restriction
Department, Public Works
- 21 - PC2026-009
NO.
CONDITIONS OF APPROVAL
RESPONSIBLE
DEPARTMENT
(CC&Rs) that are prepared by an authorized professional for
Department, City
review and approval by the City Engineer, Planning and
Attorney's Office
Building Director, and City Attorney, which will generally
provide for the following:
• A requirement that residents shall use designated
parking areas, including garages, only for the parking of
vehicles.
• A provision that parking garages are subject to
inspection by the Association or City of Anaheim staff.
• A provision requiring that proposed amendments to the
CC&Rs shall be submitted for review to the City
Engineer, Planning Director or designee, and shall be
approved by the City Attorney prior to the amendment
being valid.
A provision that the City is a third -party beneficiary to the
CC&Rs and has the right, but not the obligation, to enforce any
of the provisions of the CC&Rs relative to common area and
utility maintenance, Water Quality Management Plan, and
internal parking. [SC TRN-5
60
A detailed on -site lighting plan, including a photometric
Planning and Building
diagram, shall be submitted by project applicants and reviewed
Department,
and approved by the Planning and Building Director and Police
Planning Services
Department prior to the issuance of building permits. Such plan
Division, Police
shall indicate style, illumination, location, height, and method of
Department
shielding so as not to adversely affect adjacent properties. [SC
AE-7]
61
Projects will be reviewed by the City of Anaheim on an
Planning and Building
individual basis and will be required to comply with
Department, Building
requirements in effect at the time building permits are issued
Division
(impact fees, etc.) or if an initial study is prepared and the City
determines the impacts to be significant, then the project will be
required to comply with appropriate mitigation measures (fire
station sites, etc.. SC PS-1
62
An adequate water supply capable of providing minimum fire
Anaheim Fire and Rescue
flow requirements for fire hydrants and a fire sprinkler system
Department, Public
shall be available. [SC WF-3]
Utilities, Water
Engineering
63
The Owner shall irrevocably offer to dedicate to the City of
Public Utilities,
Anaheim (i) an easement for all large domestic above -ground
Water Engineering
water meters and fire hydrants, including a five (5)-foot wide
easement around the fire hydrant and/or water meter pad. (ii) a
twenty (20) foot wide easement for all water service mains and
service laterals all to the satisfaction of the Water Engineering
- 22 - PC2026-009
NO.
CONDITIONS OF APPROVAL
RESPONSIBLE
DEPARTMENT
Division. The easements shall be granted on the Water
Engineering Division of the Public Utilities Department's
standard water easement deed. The easement deeds shall
include language that requires the Owner to be responsible for
restoring any special surface improvements, other than asphalt
paving, including but not limited to colored concrete, bricks,
pavers, stamped concrete, decorative hardscape, walls or
landscaping that becomes damaged during any excavation,
repair or replacement of City owned water facilities. Provisions
for the repair, replacement and maintenance of all surface
improvements other than asphalt paving shall be the
responsibility of the Owner and included and recorded in the
Master CC&Rs for the project.
64
All backflow equipment shall be located above ground outside
Public Utilities,
of the street setback area in a manner fully screened from all
Water Engineering
public streets and alleys.
65
Water improvement plans shall be submitted to the Water
Public Utilities,
Engineering Division for approval and a performance bond in
Water Engineering
the amount approved by the City Engineer and form approved
by City Attorney shall be posted with the City of Anaheim.
66
Association and/or Owner shall incorporate screening for all
Planning and Building
ground -mounted equipment in the front yard to the maximum
Department,
extent possible to the satisfaction of the Director of Planning
Planning Services
and Building, prior to building permit issuance.
PRIOR TO FINAL BUILDING AND ZONING INSPECTIONS
All public improvements shall be constructed by the developer,
Public Works,
67
inspected and accepted by Construction Services prior to final
Development Services
building and zoning inspection.
68
All remaining fees/deposits required by Public Works
Public Works,
department shall be paid in full.
Development Services
Set all Monuments in accordance with the final snap and submit
Public Works,
69
all centerline ties to Public Works Department. Any monuments
Development Services
damaged as a result of construction shall be reset to the
satisfaction of the City Engineer.
Record Drawing Plans and Final Soils Report shall be submitted
Public Works,
70
for review and approval to the Department of Public Works,
Development Services
Development Services Division.
The WQMP Covenant shall be recorded in the Office of the
Public Works Department,
71
Orange County Recorder and incorporated into Verified Final
Development Services
WQMP Submittal. The Verified Final WQMP shall be approved,
all BMPs shall be constructed by the developer, inspected and
- 23 - PC2026-009
NO.
CONDITIONS OF APPROVAL
RESPONSIBLE
DEPARTMENT
accepted by Construction Services prior to final building and
zoning inspection.
Owner/Developer shall install an approved backflow prevention
Public Utilities,
assembly on the water service connection(s) serving the property
Water Engineering
72
behind property line and building setback in accordance with
Public Utilities Department Water Engineering Division
requirements.
Any new system improvements (e.g., substation, line
Public Works Department,
connections), if required and prior to final approval, shall be
Electric Engineering
constructed in accordance with the City's Electric Rates, Rules
73
and Regulations and Electrical Specifications. Electrical Service
Fees and other applicable fees will be assessed in accordance
with the current Electric Rates, Rules and Regulations and
Electrical Specifications. SC EN-5
Prior to approval of each final building and zoning inspection,
Planning and Building
the property owner/developer shall implement a program, as
Department, Building
required, to reduce the demand on natural gas supplies. The
Division
74
Southern California Gas Company has developed several
programs which are intended to assist in the selection of most
energy -efficient water heaters and furnaces. SC EN-6
ESN --GOING MIRING CONSTRUCTION
During construction activities, for projects that are subject to the
Planning and Building
California Environmental Quality Act (i.e., non-exempt
Department, Building
projects), the construction contractors shall ensure that the
Division
equipment shall be properly serviced and maintained in
75
accordance with the manufacturer's recommendations; and, that
all nonessential idling of construction equipment is restricted to
five minutes or less in compliance with Section 2449 of the
California Code of Regulations, Title 13, Article 4.8, Chapter 9.
MM AQ-3
Before and during construction, if human remains are discovered
Planning and Building
on -site, no further disturbance shall occur until the County
Department,
76
Coroner has made a determination of origin, and disposition
Building Division,
pursuant to California Public Resources Code Section 5097.98
Planning Services
and California Health and Safety Code Section 7050.5 has
occurred. SC CUL-4
GENERAL
77
If any existing building on an adjacent property that currently
Planning and Building
occupies a shared property line and eliminates the need for a
Department,
perimeter wall under this approval is demolished or removed,
Planning Services Division
the Owner/Operator shall, within 90 days followin final
- 24 - PC2026-009
NO.
CONDITIONS OF APPROVAL
RESPONSIBLE
DEPARTMENT
inspection of the demolition permit, construct a perimeter wall
along that property line in compliance with applicable
development standards.
78
The project shall be operated in accordance with the Project
Planning and Building
Narrative and Letter of Operation submitted as part of this
Department,
application. Any changes to the project as described in these
Planning Services Division
documents shall be subject to review and approval by the
Planning and Building Director to determine substantial
conformance with these documents, to determine that adequate
parking shall continue to be provided for onsite uses, and to
ensure compatibility with the surrounding uses.
79
Landscaping shall be replaced by the applicant in a timely
Planning and Building
manner if it is removed, damaged, diseased, and/or dead. All
Department,
new landscaping shall be installed by the owner/developer in
Planning Services Division
conformance with Chapter 18.46 "Landscape and Screening" of
the Anaheim Municipal Code and shall be maintained in
perpetuity.
80
The owner/developer shall ensure that the exterior of the
Planning and Building
building and parking lot shall be illuminated during all hours of
Department,
darkness. [SC AE-31
Planning Services Division
81
Trees and shrubs shall be pruned by the owner/developer to
Planning and Building
allow visual access to all parts of the premises. [SC AE-4]
Department,
Planning Services Division
82
Entrance windows shall not be covered with posters and
Planning and Building
announcements that obstruct natural surveillance. [SC AE-51
Department,
Planning Services Division
83
The owner/developer shall ensure the following: landscaping
Planning and Building
shall be of the type and situated in locations to maximize
Department,
observation while providing the desired degree of aesthetics.
Planning Services Division
Security planting materials are encouraged along fence and
property lines and under vulnerable windows. Shrubbery or
ground cover should not generally exceed 3 feet in height, and
tree branches should not descend below 6 feet from the ground;
trees should not be planted close enough to the structure to allow
easy access to the roof, or should be kept trimmed to make
climbing difficult. [SC AE-21
84
All archaeological resources shall be subject to the provisions
Planning and Building
of CEQA (Public Resources Code) Section 21083.2. [SC CUL-
Department,
31
Planning Services Division
- 25 - PC2026-009
NO.
CONDITIONS OF APPROVAL
RESPONSIBLE
DEPARTMENT
85
The owner/developer shall design per City Standards full
Public Works Department,
improvements for all impacted public streets/facilities in
Development Services
accordance with City Code, Standards, and Specifications. Such
improvements shall include, but not be limited to the following:
driveway closures with new curb and gutter and sidewalk,
commercial driveway approach, parkway landscaping with
irrigation, storm drain lateral connection and manhole, sewer
lateral connection. [SC TRN-61
86
The owner/developer shall pay all applicable development
Public Works Department,
impact fees required under the Anaheim Municipal Code. [SC
Development Services
PS-2
87
2019 California Fire Code Section 503.1.1: Approved fire
Anaheim Fire and Rescue
apparatus access roads shall be provided for every facility,
Department
building, or portion of a building hereafter constructed or moved
into or within the jurisdiction. The fire apparatus access road
shall comply with the requirements of this section and shall
extend to within 150 feet of all portions of the facility and all
portions of the buildings as measured by an approved route
around the exterior of the building or facility. [SC PS-41
88
Knox box locations, fire hydrant location and fire flow
Anaheim Fire and Rescue
requirements, as well as fire sprinklers shall be provided in
Department
accordance with National Fire Protection Association (NFPA)
13 and fire alarms shall be provided in accordance with NFPA
72. The fire master plan shall be submitted directly at AF&R at
the time that grading plans are submitted to the city. [SC PS-61
89
A private water system with separate water service for fire
Public Utilities,
protection and domestic water shall be provided by the
Water Engineering
owner/developer and shown on plans submitted by the
owner/developer to the Water Engineering Division of the
Anaheim Public Utilities Department. SC PS-7
90
Pedestrian access control shall be considered by the
Anaheim Police
owner/developer to help prevent unwanted entry. If access
Department
control is installed, a digital keypad entry system shall be
included to facilitate quick response by emergency personnel.
The system's entry code shall be provided to the Anaheim Police
Department Communication Bureau. ISC PS-11
91
The owner/developer shall file Emergency Listing Card, Form
Anaheim Police
APD-281, with the Police Department, available at the Police
Department
Department front counter. This card should include on and off -
site property management contact information for regular
business hours as well as emergency after-hours contacts. [SC
PS-121
- 26 - PC2026-009
NO,
CONDITIONS OF APPROVAL
RESPONSIBLE
DEPARTMENT
92
The owner/developer shall submit a set of improvement plans
Public Utilities,
prior to submittal of the grading plan or as determined by the
Water Engineering
City for Public Utilities Water Engineering review and approval
in determining the conditions necessary for providing water
service to the project. SC USS-1
93
All requests for new water services, backflow equipment, or fire
Public Utilities,
lines, as well as any modifications, relocations, or
Water Engineering
abandonments of existing water services, backflow equipment,
and fire lines, shall be coordinated and permitted through Water
Anaheim Fire and Rescue
Engineering Division of the Anaheim Public Utilities
Department
Department. SC USS-6
94
The developer/owner shall submit a water system master plan,
Public Utilities,
including a hydraulic distribution network analysis, for Public
Water Engineering
Utilities Water Engineering review and approval. The master
plan shall demonstrate the adequacy of the proposed on -site
water system to meet the project's water demands and fire
protection requirements. [SC USS-91
95
The owner/developer shall contact Water Engineering for
Public Utilities,
recycled water system requirements and specific water
Water Engineering
conservation measures to be incorporated into the building and
landscape construction plans. [SC USS-131
96
The owner/developer shall install an approved backflow
Public Utilities,
presentation assembly on the water service connection(s)
Water Engineering
serving the property, behind the property line and building
setback in accordance with Water Services Administrative
Procedures and Design Guidelines. [SC USS-141
97
Any proposed changes to the Solid Waste Management Plan
Public Works Department,
must be approved by the Public Works Department, Sanitation
Sanitation Division
Division. [SC USS-18]
98
Prior to connection of electrical service, the legal owner shall
Public Utilities,
provide to the City of Anaheim a Public Utilities easement with
Water Engineering
dimensions as shown on the approved utility service plan. The
legal owner shall submit payment to the City of Anaheim for
service connection fees. [SC USS-191
99
A minimum 26' width for the fire access road is required for the
Anaheim Fire and Rescue
proposed structure and a minimum vertical clearance of 13 feet,
Department
6 inches. [SC WF-9
100
The Applicant/Owner shall defend, indemnify, and hold
Planning and Building
harmless the City and its officials, officers, employees and
Department,
agents (collectively referred to individually and collectively as
Planning Services Division
"Indemnitees") from any and all claims, actions or proceedings
brought against Indemnitees to attack, review, set aside, void,
or annul the decision of the Indemnitees concerning this permit
- 27 - PC2026-009
NO.
CONDITIONS OF APPROVAL
RESPONSIBLE
DEPARTMENT
or any of the proceedings, acts or determinations taken, done, or
made prior to the decision, or to determine the reasonableness,
legality or validity of any condition attached thereto. The
Applicant's indemnification is intended to include, but not be
limited to, damages, fees and/or costs awarded against or
incurred by Indemnitees and costs of suit, claim or litigation,
including without limitation attorneys' fees and other costs,
liabilities and expenses incurred by Indemnitees in connection
with such proceeding.
101
The premises shall be developed substantially in accordance
Planning and Building
with plans and specifications submitted to the City of Anaheim
Department,
by the applicant, which plans are on file with the Planning and
Planning Services Division
Building Department, and as conditioned herein.
102
The Owner shall be responsible for restoring any special surface
Public Utilities,
improvements, other than asphalt paving, within any right -of-
Water Engineering
way, public utility easement or City easement area including but
not limited to colored concrete, bricks, pavers, stamped
concrete, walls, decorative hardscape or landscaping that
becomes damaged during any excavation, repair or replacement
of City owned water facilities. Provisions for maintenance of all
said special surface improvements shall be included in the
recorded Master CC&Rs for the project and the City easement
deeds.
103
The following minimum horizontal clearances shall be
Public Utilities,
maintained between proposed water main and other facilities:
Water Engineering
• 10-feet minimum separation (outside wall -to -outside
wall) from sanitary sewer mains and laterals
• 5-feet minimum separation from all other utilities,
including storm drains, gas, and electric
• 6-feet minimum separation from curb face
• 10-feet minimum separation from structures, footings,
and trees.
The following minimum clearances shall be provided around all
new and existing public water facilities (e.g. water mains, fire
hydrants, service laterals, meters, meter boxes, backflow
devices,
etc.):
• 10 feet from structures, footings, walls, stormwater
BMPs, power poles, street lights, and trees.
• 5 feet from driveways, BCR/ECR of curb returns, and
all other utilities (e.g. storm drain, gas, electric, etc.) or
above ground facilities.
- 28 - PC2026-009
NO.
CONDITIONS OF APPROVAL
RESPONSIBLE
DEPARTMENT
12-inch minimum vertical separation from other utilities, except
24" minimum vertical separation from existing gas.
104
No public water main or public water facilities shall be installed
Public Utilities,
in private alleys or paseo areas.
Water Engineering
105
No public water mains or laterals allowed under parking stalls
Public Utilities,
or parking lots.
Water Engineering
106
The owner shall prepare a Stormwater Pollution Prevention Plan
Public Works,
(SWPPP). The SWPPP shall be kept at the project site and be
Development Services
available for Public Works, Development Services Division
review upon request.
- 29 - PC2026-009
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss.
CITY OF ANAHEIM )
I, Madeleine Pineda-Campos, Secretary of the Planning Commission of the City of
Anaheim, do hereby certify that the foregoing resolution was passed and adopted at a meeting of
the Planning Commission of the City of Anaheim held on April 6, 2026, by the following vote of
the members thereof:
AYES: Chairperson Walker and Commissions Castro, Perez and Tran-Martin
NOES: Commissioner Kelly and Lieberman
ABSTAIN: None
ABSENT: Commissioner Adulrahman
IN WITNESS WHEREOF, I have hereunto set my hand this 6tn day of April 2026.
SECRETARY, PLANNING COMMISSION
OF THE CITY OF ANAHEIM
- 30 - PC2026-009