Public Utilities 2026/08/26CITY OF ANAHEIM PUBLIC UTILITIES BOARD MINUTES August 26, 2026 The Secretary posted the agenda on Thursday, August 20, 2026, and Chairperson J. Seymour called the Regular Meeting of the Public Utilities Board (Board) to order at 5:00 p.m. on Wednesday, August 26, 2026, in the Gordon Hoyt Conference Center, 2nd floor, Anaheim West Tower, 201 S. Anaheim Blvd., Anaheim, California. Board Members Present: Chairperson J. Seymour, Vice -Chairperson A. Pham, M. Lee, A. McMenamin, I. Castillo, T. Ibrahim Board Members Absent: S. Kewalramani City Staff Present: B. Beelner, A. Lee, P. Starr, C. Parker, J. Lonneker, J. Sanks, M. Avelino -Walker, M. Seifen, B. Mendoza, A. Nguyen, D. Agrawalla, P. Bogdanoff, B. Fruchter, P. Mendez, G. Ludesirishoti, T. Penson Guests Present: None AGENDA ITEM 1. PUBLIC COMMENTS. 2. APPROVE THE MINUTES OF THE REGULAR MEETING OF JULY 22, 2026. 3. PRESENTATION: GYPSUM CANYON MEMORIAL PARK DEVELOPMENT WATER AND ELECTRIC UTILITIES UPDATE. D. Agrawalla, Principal Civil Engineer, presented an update on the Water and Electric Utilities for the Gypsum Canyon Memorial Park development. D. Agrawalla briefed the Board on the Electric and Water Added Facilities Financing Agreement with the Orange County Cemetery District (OCCD) to construct water and electric line extensions to the proposed Memorial Park at the intersection of Santa Ana Canyon Road and Gypsum Canyon Road. ACTION TAKEN Chairperson J. Seymour closed the public comments portion of the meeting with no comments made by members of the public. Vice -Chairperson A. Pham moved the approval of the Minutes of the Regular Meeting of July 22, 2026. A. McMenamin seconded the motion. MOTION CARRIED: 6-0. ABSTAINED: 0. ABSENT: 1. [S. Kewalramanil 2026 - 63 D. Agrawalla also provided a brief update on the electric line construction, which began at the end of August, and the water line construction, which is anticipated to begin in summer of 2027. Other updates included the undergrounding of poles by Southern California Edison (SCE) and AT&T, planned to be completed by 2027, and the work by California Department of Transportation (Caltrans) and Transportation Corridor Agencies (TCA) to upgrade the California State Route 91 and California State Route 241 interconnector. Construction for the latter is scheduled to begin in early 2027 and continue through 2029. D. Agrawalla emphasized the necessity for coordination with the various agencies and both APU's Water and Electric divisions continue to work with them on a regular basis. The Board asked if the work would begin east of Weir Canyon Road. D. Agrawalla responded that the work starts about one block east of Weir Canyon Road. The Board asked if the street will need to be excavated for the electric work. D. Agrawalla noted that the line will be installed in the street on the south side and once the water line is constructed on the north side, the entire stretch will be paved curb -to - curb. OCCD will reimburse half of the cost incurred to pave the street. The Board asked how APU plans to mitigate traffic issues during construction, as there can be significant traffic there. J. Lonneker, Assistant General Manager — Electric Services, noted that APU is coordinating with the Department of Public Works (PW) to determine if the work should be done during the day or at night to avoid potential traffic issues. D. Agrawalla noted that the water line will be constructed after the electric line work is done. Traffic control for the construction will be coordinated with PW and flagmen will be used as needed to direct traffic. The Board asked if the development will receive water from the Lenain Water Treatment Plant. C. Parker, Assistant General Manager — Water Services, confirmed that it would. The Board asked if SCE and AT&T will be upgrading the internet or will they be going wireless. D. Agrawalla mentioned that APU is not aware of their plans. The Board asked if OCCD will need a sewer connection from the City. D. Agrawalla noted that OCCD will not need a connection as they will have an on -site septic system. The Board asked how APU will be reimbursed by OCCD. D. Agrawalla explained that the downpayment of $1 million (M) is due within a month of start of construction of the electric line extension. J. Lonneker mentioned that the electrical line work is $6M; thereafter, monthly payments will be made through the term defined in the Electric and Water Added Facilities Financing Agreement. 2026 - 64 The Board asked why APU decided to use ductile iron for the water line considering the corrosive nature of the soil in the area. C. Parker noted that polyvinyl chloride (PVC) pipelines larger than 12 inches in diameter have a propensity for unreliability, so ductile iron has proven itself as a more reliable option for this 20-inch line. D. Agrawalla mentioned that the design -build entity will conduct soil testing and provides corrosion protection for the pipeline based on the test results. 4. RECOMMEND APPROVAL OF A DESIGN -BUILD AGREEMENT WITH BIG BEN, INC. FOR THE SANTA ANA CANYON ROAD WATER MAIN EXTENSION PROJECT (PROJECT) FOR THE GYPSUM CANYON MEMORIAL PARK DEVELOPMENT IN THE AMOUNT OF $9,263,000, PLUS A 10% CONTINGENCY; AND DETERMINE THAT THE PROJECT IS EXEMPT FROM THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) PURSUANT TO PUBLIC RESOURCES CODE SECTION 21080.62. * C. Parker provided an overview of the proposed agreement with Big Ben, Inc. to award a design -build contract for the water line serving the cemetery. Per the Anaheim Municipal Code, APU requested a Statement of Qualifications, followed by a Request for Proposals (RFP). APU seeks the approval to award Big Ben, Inc. based on project delivery, traffic control, schedule and other factors. Big Ben Inc. has performed work for the City in the past and has worked for neighboring agencies. The work includes use of the Community Workforce Agreement. 5. RECOMMEND APPROVAL, IN SUBSTANTIAL FORM, OF A SOFTWARE LICENSE AND SERVICES AGREEMENT WITH IVOYANT LLC FOR SYSTEMS INTEGRATION SOFTWARE LICENSES, IMPLEMENTATION SERVICES, AND SUPPORT SERVICES WITH AN INITIAL TERM OF FIVE YEARS AND UP TO TWO OPTIONAL FIVE-YEAR EXTENSIONS, AT A NOT -TO -EXCEED COST OF $1,080,000 FOR THE INITIAL TERM, AND AN ANNUAL SUPPORT -SERVICES COST OF $60,000 WITH A CONSUMER PRICE INDEX (CPI) ESCALATOR CAPPED AT THREE PERCENT FOR EACH EXTENSION TERM YEAR, PLUS A CONTINGENCY FOR AS - NEEDED ADDITIONAL SERVICES NOT -TO -EXCEED $100,000 PER YEAR (WITH UNUSED BALANCES CARRYING FORWARD A MAXIMUM OF ONE YEAR). * J. Sanks, Assistant General Manager — Administration and Risk Services, briefed the Board on the proposed agreement with iVoyant LLC (Ivoyant) to provide systems integration software and services. J. Sanks described that APU has multiple individual software systems that comprise the Customer Information System, which APU uses for automated metering, issuing billing statements, receiving payments, and managing customer accounts. These systems translate and transfer data using specialized software. M. Lee moved the recommendation of approval of a Design -Build Agreement with Big Ben, Inc. for the Santa Ana Canyon Road Water Main Extension Project. A. McMenamin seconded the motion. MOTION CARRIED: 6-0. ABSTAINED: 0. ABSENT: 1. [S. Kewalramanil I. Castillo moved the recommendation of approval, in substantial form, of a Software License and Services Agreement with iVoyant LLC. T. Ibrahim seconded the motion. MOTION CARRIED: 6-0. ABSTAINED: 0. ABSENT: 1. [S. Kewalramanil 2026 - 65 The proposed agreement provides a perpetual license to use the software for a one-time price of $300,000, includes one-time implementation services for $480,000 to migrate existing data connections to the new platform, and includes annual maintenance and support services for $60,000, fixed for the initial agreement term of five years and then subject to annual increases for the lesser of the United States Consumer Price Index (CPI) or 3%. The proposed agreement also includes an allowance for additional professional services in an annual amount not -to -exceed $100,000, plus any unused balance from the prior year. The agreement would have an initial term of five -years with up to two optional five-year extensions to allow for continuity of APU's technology systems. The Board asked if the new software would take the place of the existing system. J. Sanks answered that the current vendor no longer supports the current software and is encouraging customers to a new cloud -based system. Since APU procured the original software in 2010, APU submitted an RFP to look for new market offerings. The Board asked if the new software would cost less to maintain than the current software. J. Sanks confirmed that the costs would be lower, and the project implementation team has experience with APU's current software. The Board asked if iVoyant would migrate existing integrations to the new tool. J. Sanks confirmed that the agreement included requirements to migrate the existing functionality and also included services to build new integrations if necessary. The Board asked if APU would lose any functionality with the new tool. J. Sanks confirmed there would not lose any function. B. Beelner, Acting Public Utilities General Manager, added there is an addition in the contract that updates bugs for fixes to the services per year. The Board asked if this software constitutes a lateral upgrade, or downgrade. J. Sanks confirmed the new system would upgrade current functionality and have additional features than the previous software. 6. RECOMMEND AUTHORIZING BY RESOLUTION THE ISSUANCE OF NOT -TO -EXCEED $325,000,000 AGGREGATE PRINCIPAL AMOUNT OF ANAHEIM HOUSING AND PUBLIC IMPROVEMENTS AUTHORITY (AHPIA) ELECTRIC REVENUE REFUNDING BONDS, SERIES 2026-A (ELECTRIC UTILITY DISTRIBUTION SYSTEM REFUNDING) AND SERIES 2026-B (ELECTRIC UTILITY DISTRIBUTION SYSTEM REFUNDING) (FORWARD DELIVERY); AND NOT - TO -EXCEED $225,000,000 AGGREGATE PRINCIPAL AMOUNT OF AHPIA WATER REVENUE REFUNDING BONDS, SERIES 2026-A (WATER UTILITY SYSTEM REFUNDING) AND SERIES 2026-B (WATER UTILITY M. Lee moved the recommendation to authorize by Resolution the issuances of not - to -exceed $325,000,000 aggregate principal amount of AHPIA electric revenue refunding bonds and not -to - exceed $225,000,000 aggregate principal amount of AHPIA water revenue refunding bonds. Vice -Chairperson A. Pham seconded the motion. 2026 - 66 SYSTEM REFUNDING) (FORWARD DELIVERY) TO MOTION CARRIED: 6-0. REFINANCE OUTSTANDING ELECTRIC AND WATER ABSTAINED: 0. REVENUE BONDS. * ABSENT: 1. [S. Kewalramani] B. Beelner discussed the proposed plan of finance which includes the potential refunding of up to $252M of electric revenue bonds, and the refunding of up to $164M of water revenue bonds, resulting in savings of approximately $19M in interest. The Board inquired when APU plans to refund these bonds. B. Beelner responded that rates are always changing and APU will act when interest rates fall to a more appropriate level. 7. RECOMMEND ADOPTION BY RESOLUTION OF RULE NO. I. Castillo moved the 27 (FINANCIAL ASSURANCE STANDARDS FOR LARGE recommendation to adopt by ELECTRIC LOAD) OF THE ELECTRIC RATES, RULES AND Resolution of Rule No. 27 — REGULATIONS, WHICH DOES NOT INCREASE RATES OR Electric Rates, Rules and FEES, EFFECTIVE OCTOBER 1, 2026; AND DETERMINE Regulations. Vice -Chairperson THAT THE ACTION IS NOT SUBJECT TO CEQA PURSUANT A. Pham seconded the motion. TO CEQA GUIDELINES (CAL. CODE REGS., TITLE 14, CH. 3) MOTION CARRIED: 6-0. SECTIONS 15060(C)(2)-(3) AND 15378. * ABSTAINED: 0. ABSENT: 1. [S. Kewalramani] A. Nguyen, Utilities Financial Planning Manager, presented a new Electric Rule that would specify requirements for certain large load customers, such as data centers, that may require significant investment by APU and/or long-term financial obligations by APU in order to serve these types of customers. A. Nguyen explained that the rule does not increase rates or fees and solely addresses the financial risk posed to APU's current customers by large load customers. A. Nguyen noted that serving a customer of this scale may involve sizable financial commitments, and if such a customer went bankrupt or exited the territory before APU could recover its costs to serve them, existing ratepayers may see a material rate impact to recover the stranded costs. A. Nguyen outlined three key financial protections in the proposed rule: requiring customers to fund infrastructure built to serve them, a prepayment account covering 6 to 18 months of service costs, and collateral security to guard against stranded costs, all administered by an independent third -party trustee. A. Nguyen explained that the rule's criteria apply to customers with electric demand of 15 megawatts or more, a load factor of 80% or greater, and a new or materially larger power supply commitment by APU. A. Nguyen then stated that APU intends the proposed rule to allow it to fulfill its obligation to serve these customers while protecting existing ratepayers from subsidizing the costs required to these large load customers without compromising affordable, competitive rates. 2026 - 67 The Board asked several questions about how APU would determine the prepayment size, what recourse APU has in recovering funds during a customer bankruptcy, and whether APU could address risks posed by customers who are under the load threshold. A. Nguyen and B. Beelner explained how specified provisions in the rule tie to a documented study to properly determine the prepayment and collateral required, how required collateral protects APU when a customer defaults, and how APU's existing rules provide protection for those customers who do not fall under the rule's criteria, such as allowing APU to collect a deposit when a new customer lacks adequate credit history. The Board inquired whether APU has considered a water -related rule, whether any current customers meet the proposed rule's criteria, and whether the rule addressed possible loopholes or evasion tactics from potential customers. B. Beelner and A. Nguyen indicated that a water - related rule was under development but staff prioritized release of the electric rule first due to the greater risk to the Electric Utility than to the Water Utility. They also confirmed that no current customer meets the proposed rule's criteria, and that staff crafted the proposed rule language to address possible evasion, such as providing the Public Utilities General Manager discretion in requiring compliance with the rule when material risks can be reasonably determined. 8. UPDATE ON ELECTRIC SYSTEM ITEMS. J. Lonneker updated the Board on Beach Boulevard undergrounding progress. SCE removed high voltage wires and poles on Beach Boulevard north of Lincoln Avenue. Crews proceeded with pole topping on Beach Boulevard, south of Orange Avenue. APU sent Notices of Completion to the various telecommunication companies who will have up to 12 months to remove their lines before the poles so that the contractor can remove the poles. Council Member R. Balius visited the site to see the progress, as this is a major milestone for the undergrounding project. 9. UPDATE ON WATER SYSTEM ITEMS. C. Parker briefed the Board on the current Water Supply Dashboard. The Orange County Groundwater Basin is in good condition, and the Orange County Water District (OCWD) continues to design and build PFAS (per- and polyfluoroalkyl substances) treatment plants to maintain the water supply in the basin. Additionally, C. Parker stated that The State Water Project has ample supply. The Metropolitan Water District of Southern California (MWD) is conducting studies to construct storage south of the Northern California Delta to capture water during wet periods. The Colorado River Basin still suffers from drought conditions with supply straining against demand. The United States Bureau of Reclamation (USBR) has mandated a solution on the river due to the 2026 - 68 seven states not able to negotiate a conservation plan. The solution includes a 10-year framework and guidelines every two years. The southern Basin States (Nevada, Arizona, and California) have mandated cuts. Currently, the cuts have not affected MWD, most cuts are towards Nevada and Arizona. However, MWD has voluntarily cut demand as it has in the past to assist in the solution. C. Parker invited the Board to the Orange County Water Summit on September 25, 2026, and to let P. Starr, Executive Assistant, know if interested in attending. The Board asked about the potential for an El Nino event this year that could result in flooding. C. Parker stated that forecasters cannot predict rainfall from El Nino with any degree of accuracy, but it is possible. The Board asked about the future of the Colorado River and its ability to supply future water needs. C. Parker stated that not all years will suffer from this same level of dryness, so supply will still exist in future years. However, offtakers will still need to conserve in the future. 10. UPDATE ON FINANCE AND ENERGY RESOURCES ITEMS. B. Beelner discussed the monthly Electric Finance Dashboard for the period ending July 2026. B. Beelner mentioned that the month ended with electric revenue 4.6% ($2.M) below budget with operating revenue coming in 6.2% ($34.3M) below budget. B. Beelner then discussed the Water Finance Dashboard. B. Beelner informed the Board that water revenue for the Fiscal Year 2026 to date came in 0.3% ($0.3M) above budget and mentioned that the fiscal year ended with water operating expenditures at 2.2% ($8.4M) below budget. B. Beelner informed the Board that APU has more than enough power to supply with the heatwave and explained how the State was able to ensure there was enough power supply. B. Beelner also informed the Board that APU now has Unit 1 turbine of the Canyon Power Plant (CPP) back in service. B. Beelner informed the Board the J. Sanks was promoted to Assistant General Manager of the Administration and Risk Services division. 11. UPDATE ON ADMINISTRATION AND RISK SERVICES ITEMS. J. Sanks, Assistant General Manager — Administration and Risk Services, discussed the quarterly Internal Compliance Report, which provides an overview of compliance activities for April through June 2026. J. Sanks noted that the State Water Resources Control Board 2026 - 69 Division of Drinking Water (DDW) conducted a routine on -site sanitary survey at APU's facilities. DDW provided recommendations for various maintenance activities, such as fixing vent screens, tank cleaning, and valve maintenance and APU is working with DDW to complete these tasks. J. Sanks also described that APU received a notice of alleged violation related to the CPP from the California Energy Commission. The violation is related to not having documented quarterly inspections of a portion of CPP's fire suppression system. Other required testing and inspections of the fire suppression system, such as annual and semiannual tests were conducted and documented, and described that this was a recordkeeping violation rather than an operational issue with the fire suppression system. The Board asked if monetary penalties were possible. B. Beelner stated that penalties may occur and negotiations will take place with the California Energy Commission with the help of the City Attorney's office. J. Sanks shared that APU tracked 81 bills, and that the two-year legislative session ends on August 31, 2026. APU will continue to watch Assembly Bill (AB) 1820, which would cap city and county permit fees on electric vehicle (EV) chargers. J. Sanks described APU's safety performance for July, noting that the overall injury rate increased slightly compared to last year, but the lost time injury rate, which reflects serious injuries, dropped significantly and is well below APU's target. J. Sanks also reported an uptick in close call and good catch reporting. J. Sanks shared that one injury occurred in July, when an employee cut his hand while splicing an electric cable. APU's safety team continues to visit job sites. 12. ITEMS BY SECRETARY AND INFORMATIONAL UPDATE ON WATER PRESSURE EVENTS THAT OCCURRED ON JULY 28, 2026. B. Beelner shared the following updates: • The City hosted its Sister City — Mito, Japan where students joined staff for a tour of the Sustainability Education Center; • APU's Sustainability Education Center was awarded first place at the 2026 California Municipal Utilities Association (CMUA) Impact Awards in the large -size utility category; and • The Board will receive an invitation from the City Clerk's office for the Boards and Commissions Appreciation Dinner, which is scheduled for October 1, 2026. 2026 - 70 B. Beelner shared agenda items planned for next month: • Quarterly Wholesale Energy Risk Compliance Report; • Utilities Success Indicators; • Customer Services Operational Efficiency Consulting Contract; and • Annual Uncollectible Customer Account Write-offs. B. Beelner discussed the water pressure events that took place on July 28, 2026. He informed the Board that customers experienced low water pressure twice that day, once at approximately 5 AM and once again at approximately 6 PM. These events occurred while APU was in the process of widening a pipe underground near North Tustin and East La Palma Avenues. In order to complete the work, APU turned off six pressure regulators during this process. With the regulators disabled, pressure dropped in central and west Anaheim. This drop in pressure did not put the community at risk, however, four APU wells had automatic settings that forced the wells to go offline with the drop in pressure. APU has since removed those settings so that operators may operate the system manually if the water pressure drops below a safe or operationally prudent level. The Board asked how low the pressure fell. C. Parker stated the pressure dropped to 20 PSI, and B. Beelner mentioned it is not dangerous until it falls to 5 PSI. APU opened feeders from the Metropolitan Water District to restore the pressure to normal levels, which took approximately one to one and a half hours to restore pressure back to normal levels. The Board asked if APU is looking for other potential settings that might be similar. C. Parker confirmed that APU reviewed all of the settings, and stated APU will conduct an after action overview of the event with recommended improvements to APU's internal processes. The Board thanked APU for the briefing and asked that APU improve APU staff will provide an communication with its customers during future incidents. The Board update to the Board. would like APU staff to provide a future update on how APU plans on improving communication with its customers, including a plan to improve incoming calls to the water operators after hours. 13. ITEMS BY BOARD MEMBERS. Board Member I. Castillo congratulated J. Sanks on his promotion to Assistant General Manager of Administrative and Risk Services. Board Member M. Lee stated the presentations were very helpful, the design -build process is awesome, and refinancing bonds is a smart thing to do. 2026 - 71 14. ADJOURN: (NEXT REGULAR MEETING ON SEPTEMBER 23, 2026 AT 5:00 P.M.) Respectfully submitted, Brian Beelner Acting Public Utilities General Manager T. Ibrahim moved to adjourn the Regular Meeting in the Gordon Hoyt Conference Center at 6:36 p.m. to the Board's Regular Meeting date of September 23, 2026, at 5:00 p.m. A. McMenamin seconded the motion. MOTION CARRIED: 6-0. ABSTAINED: 0. ABSENT: 1. [S. Kewalramani] *Indicates voting item(s) that will be forwarded to City Council for action upon recommendation by the Board. **Indicates voting item(s) that do not require further approval actions. 2026 - 72