Loading...
1979-315RESOLUTION NO. 79R -315 A RESOLUTION OF THE CITY COUNCIL OF TIIE CITY OF ANA1IEI'' FINALLY ACCEPTING THE ".Of1PLETION ANI) THE FHRi :TSUING OF ALL PLANT LABOR, SER- VICES, MATEK1ALS AND EQUIPMENT A»T) ALL UTILI- TIES AND TRANSPORTATION INCLUDI POWER, FUEL AND WATER, AND THE PERFORMANCE OF ALL WORK NECESSARY TO CONSTRUCT AND COMPLL' E THE FOLLOW ING PUBLIC IMPROVEMENT, TO WIT: COMMUNITY DEVELOPMENT PROGRAM AREA 1 2 STREET ALLEY IMPROVEMENTS; AREA 1, 2 4 BARRIER REMOVAL; Area bound by La Palma Avenue, Union Pacific Railroad, Cypress Street and Anaheim Boulevard, in the City of Anaheim. WHEREAS, the City of the City of Anaheim d i d cause to be published in a newspaper of general circulati.c printed, pub and circulated in the City of Anaheim, to wit: The Anaheim Bulletin, on the 15th and 22nd days of June 197$ a notice inviting sealed ,roposalsor furnishing the following: All plant, labor, services, materi all utilities and ransportation, and water, and performing all work and complete in a good and workman accordance with the specifications therefor on file in the Office of City Clerk of the City of Anaheim, improvement, to wit: Community Development Program, in the City of Anaheim, consisting of clearing and grubbing; excavation; placement of import borrow; construction of P.C.C. curb, gutter, cross gutter, apron, side- walk, access ramps and driveway approaches; construction of asphalt concrete; placement of slurry seal; adjustment of manholes, cleanouts, pullboxes, water valves and monuments to grade; reloca- tion of signs; installation of W21R signs; modification of sprinkler system; placement of select fill, reseeding of lawns; removal of palm trees for planting; relocation of fences; construc- tion of pilaster; installation of pipe guards, construction of redwood header; asphalt concrete removal; relocation of traffic signals and controls; and all appurtenant work as shown on the plans and delineated in the specifications on file in the Office of the City Engineer, Account Nos. 25- 793 6325 -3050, -3080, -3060, -3090, -3100, 3070); and 46 -792- 6325 -2020. -1- als and equipment, and including power, fuel necessary to construct like manner, in strict plans and drawings the City Engineer or the following public in accordance with the designs, plans, profiles and specifica- tions prepared by the Public Works Department and the notice inviting sealed proposals, which said notice specified that sealed proposals as specified in said notice would be received up until 2:00 o'clock: P.M. of the 6th day of July 19 78 and which said notice did state and declare that, pursuant to the provisions of Section 1770 of the Labor Code, the City Council of the City of Anaheim had ascertained the prevailing rate of wages for each type of labor needed to execute said contract, and did state that the prevailing hourly wage scale so ascertained was on file in the Office of the City Clerk; and WHEREAS, on July 6 1978 at the hour of o'clock P.M., the City Clerk and the City Engineer of the City of Anaheim did open said sealed proposals received up to that time for the furnishing of all plant, labor, services, materials and equipment, and all utilities and transportation, including power, fuel and water, and performing all work necessary to construct and complete, in a good and workmanlike manner, in strict accordance with the specifications, plans and drawings therefor on file in the Office of the City Clerk of the City of Anaheim, the public improvement hereinabove more particularly described and set forth, in public, in the City Council Chamber in the City Hall, Anaheim, California, and the City Engineer did tabulate the result of said sealed proposals and did make a report to the City Council at its Aexncxxxxxxxxxxx regular meeting; and third subsequent WHEREAS the City Council of the City of Anaheim did, at its i iix9 xxgi t re g ular meeting, held on the 25th day of July 978 at the hour of 1:30 o'clock P.M., consider the sealed propo submitted for furnishing the materials and performing the work hereinabove more particularly described and set forth, and did thereupon find and determine that the sealed proposal submitted by BLYSTONE COMPANY, Post Office Box 6589, Orange, California 92667 for the construction, installation and completion of said Community Development Program: Ares 1 2 street and alley improvements; Area 1, 2 and 4 Barrier Removal hereinabove mentioned and described, was the lowest responsible proposal submitted there- for, and thereupon accepted said bid and did award a contract to said contractor for furnishing all plant, labor, services, materials and equipment and all utilities and transportation, including power, fuel and water, and performing all work neces- sary to construct and complete, in a good and workmanlike man- ner, in strict accordance with the specifications, plans and drawings, the said public improvement as specified in said notice inviting sealed proposals, and did authorize the Mayor and the City Clerk of the City of Anaheim to execute a contract for and on behalf of the City of Anaheim with said contractor, which said contract was duly made and entered into on the 1st day of August 19 78 and WHEREAS, the said contractor has furnished all plant, labor; services, materials and equipment and all utilities and transportation, and performed all work necessary for the con- struction and completion, in a good and workmanlike manner, in ATT-40 -2- strict accordance with the specifications, plans and drawings of said public improvement as specified in the notice inviting sealed proposals and in the detailed designs, plans, drawings and specifications prepared by the Public Works Department and the contract made and entered into with said contractor by the City of Anaheim; and WHEREAS, the Public Works Executive Director has duly certified to the construction and completion of said public improvement hereinabove mentioned and described, in accordance with the plans and specifications and the contract documents duly made and entered into with said contractor; and WHEREAS, the City Council finds that said contractor has completed said public improvement hereinabove more particu- larly described in accordance with the provisions of the con- tract and the contract documents, and that notice of completion should he filed and payment of the balance due said contractor authorized in accordance with the contract documents. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Anaheim that all plant, labor, services, materials and equipment and all utilities and transportation, and the per- formance of all work necessary to construct, install and com- plete in a good and workmanlike manner, in strict accordance with the specifications, plans and drawings therefor on file in the Office of the City Clerk of the City of Anaheim, together with the appurtenances thereto, said public improvement herein above more particularly described and set forth, in the City of Anaheim, by said contractor, be, and the same are hereby, accepted subject, nevertheless, to all the terms, conditions and provi- sions of the contract documents, and that the balance due said contractor for said work be paid to said contractor thirty -five (35) days from and after final acceptance of said work as evi- denced by the adoption of this resolution, but not sooner than thirty (30) days after the date of the filing of notice of com- pletion, excepting only such sum or sums as may lawfully be withheld in accordance with the provisions of said contract and contract documents. That acceptance by the contractor of said payments made in accordance with said final estimate shall oper- ate and shall be a release to the City of Anaheim, its officers, agents and employees from all claims and liabilities due the contractor for anything done or furnished or withheld or for any- thing relating to the work or any act or neglect of the City, its officers, agents and employees, excepting only claims against the City for amounts withheld by the City at the time of such payment. AND BE IT FURTHER RESOLVED that the Mayor be, and he is hereby, authorized to execute and file a notice of completion of said work as required by law. -3- THE FOREGOING RESOLUTION is approved and adopted by the City Council of the City of Anaheim this 29th day of May 197, ATTEST: ffm (SEAL) STATE OF CALIFORNIA COUNTY OF ORANGE ss. CITY OF ANAHEIM CITY CLE' OF THE CITY I, LINDA D. ROBERTS, City Clerk of the City of Anaheim, do hereby certify that the foregoing Resolution No. 79R -315 was introduced and adopted at a regular meeting provided by law, of the City Council of the City of Anaheim held on the 29th day of May, 1979, by the following vote of the members thereof: AYES: COUNCIL MEMBERS: Overholt, Kaywood, Bay, Roth and Seymour NOES: COUNCIL MEMBERS: None ABSENT: COUNCIL MEMBERS: None AND I FURTHER CERTIFY that the Mayor of the City of Anaheim signed said Resolution No. 79R -315 on the 29th day of May, 1979. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of the City of Anaheim this 29th day of May, 1979. F ANAHEIM I, LINDA D. ROBERTS, City Clerk of the City of Anaheim, do hereby certify that the foregoing is the original of Resolution No. 79R -315 duly passed and adopted by the Anaheim City Council on May 29, 1979. CITY CLERK