1985-365RESOLUTION N0.85R-365
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF ANAHEIM FINDING AND DETERMINING THAT
PUBLIC CONVENIENCE AND NECESSITY REQUIRE THE
CONSTRUCTION AND COMPLETION OF A PUBLIC WORK.
WHEREAS, public convenience and necessity require the
construction and completion of a public improvement (Project) in
the City of Anaheim described in Exhibit A attached hereto and
incorporated by reference herein; and
WHEREAS, the City Council instructed the Public Works
Department to prepare or cause to be prepared detailed designs,
plans, profiles, drawings and specifications, and estimates of
quantities and costs and make necessary surveys for the
construction of said Project; and
WHEREAS, said Public Works Department has prepared or
caused to be prepared said detailed designs, plans, profiles,
drawings and specifications for the construction of said Project
and has submitted the same to the City Council; and
WHEREAS, the City Council finds that said detailed
designs, plans, profiles, drawings and specifications for said
Project above mentioned are in accordance with good engineering
practice and are adequate to serve the needs and requirements of
the City of Anaheim and the citizens and residents in said area for
the purposes for which they are intended, and that they are
adequate for the construction of said Project and should be
approved.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the
City of Anaheim that the detailed designs, plans, profiles,
drawings and specifications for said Project hereinabove mentioned
and described be, and the same are hereby, approved and adopted.
BE IT FURTHER RESOLVED that said Project shall be
constructed in accordance with said detailed designs, plans,
profiles, drawings and specifications as hereby approved, and such
addenda or modifications thereto as may be approved prior to the
awarding of bids therefor.
BE IT FURTHER RESOLVED that the City Clerk of the City of
Anaheim be, and she is hereby, authorized and directed to publish a
....~.... notice according to law, inviting sealed proposals for the
furnishing of all plant, labor, services, materials and equipment,
and all utilities and transportation, including power, fuel and
water, and performing all work necessary to construct and complete,
in a good and workmanlike manner, in strict accordance with said
detailed designs, plans, profiles, drawings and specifications the
Project hereinabove mentioned and described, and fixing the Bid
Opening Date as set forth in Exhibit A at the hour of 2:00 o'clock
P.M. as the date and hour for the opening of said bids at the City
Council Chamber in the Civic Center in the City of Anaheim.
BE IT FURTHER RESOLVED that the successful bidder or
bidders shall be required to enter into a contract with the City of
Anaheim in the manner and form approved by the City Attorney of the
City of Anaheim for the construction, installation and completion
of said Project hereinabove mentioned and described, in accordance
with the plans and specifications, the notice inviting sealed
proposals, this resolution and all applicable City Ordinances or
Code Sections and the laws of the State of California, and shall be
required to post bonds and insurance in the amounts and within the
time required by law, as specified in the notice inviting sealed
proposals, and in a form approved by the City Attorney.
THE FOREGOING RESOLUTION is approved and adopted by the
City Council of the City of Anaheim this 20th day of August, 1985.
MAYOR OF THE CIT OF ANAHEIM
PRO TEM
ATTEST:
~~
CIT CLERK OF THE CITY OF ANAHEIM
-2-
CLERK
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss.
CITY OF ANAHEIM )
I, LEONORA N. SOHL, City Clerk of the City of Anaheim, do hereby certify that ,,...,~,
the foregoing Resolution No. 85R-365 was introduced and adopted at a regular
meeting provided by law, of the City Council of the City of Anaheim held on
the 20th day of August, 1985, by the following vote of the members thereof:
AYES: COUNCIL MEMBERS: Kaywood, Bay, Overholt, Pickler and Roth
NOES: COUNCIL MEMBERS: None
ABSENT: COUNCIL MEMBERS: None
AND I FURTHER certify that the Mayor of the City of Anaheim signed said
Resolution No. 85R-365 on the 20th day of August, 1985.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of the
City of Anaheim this 20th day of August, 1985.
~~. i~ S
CITY CLERK OF THE CITY OF ANAHEIM
(SEAL)
I, LEONORA N. SOHL, City Clerk of the City of Anaheim, do hereby certify that
the foregoing is the original of Resolution No. 85R-365 duly passed and
adopted by the Anaheim City Council on August 20, 1985.
CITY CLERK
FXHTRTT A
EJECT: (DESCRIPTION AND ACCOUNT NUMBER)
A FEDERAL AID URBAN FUNDED PROJECT DBE 12% WBE 20
Construction of Harbor Boulevard Street, Water and Sewer Improvement in
the City of Anaheim consisting of clearing and grubbing; excavation;
construction of asphalt concrete pavement; construction of base
material; AC planing; heater remix; placement of reinforcing .fabric; AC
binder; application of rejuvenating agent; adjustment of manholes, water
valve boxes, cleanout, pullboxes and survey monument to grade;
construction of PCC sidewalk, cross gutter, aprons, access ramps, curb
and gutter; traffic striping and legends; pavement markers; interconnect
conduit and pedestals; traffic signals; construction of sewer main and
facilities; construction of DIP water main; tie-in of existing 18", 10",
6" and 4" mains; installation of butterfly and gate valves; construct
fire hydrant assemblies; remove and salvage existing fire hydrants;
construct water services; concrete sewer encasement; abandon existing
valves; plug existing water main; construct landscaped median island
including patterned P.C.C., plant material and irrigation facilities;
and all appurtenant work as shown on the plans and delineated in the
specifications. Project Account Nos. 12-793-6325-E3760,
11-790-6325-E0580, 52-606-6329-02246 FAU Project No. M-M005(4) Fiscal
Year 1984-85.
LCt~JEST AND BEST RESPONSIBLE BIDDER:
PUBLICATION DATES: August 29 and September 5, 1985
BID OPENING DATE: September 19, 1985
PREVAILING WAGE RATE RESOLUTION N0: 85R-9
AWARD DATE: October 8, 1985
AWARD RESOLUTION N0:
NTRACT PRICE:
CONTRACT COMPLETION DAYS: One Hundred Forty (140) working days
LIQUIDATED DAMAGES: