Loading...
1965-909RESOLUTION NO. 65R -909 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ANAHEIM AUTHORIZING THE EXECUTION OF AN AGREEMENT WITH THE COUNTY OF ORANGE WITH REFERENCE TO A LIGHTING AND TRAFFIC SIGNAL SYSTEM AT THE INTERSECTION OF DOWL- ING AND LA PALMA AVENUES. WHEREAS, considerable traffic congestion presently exists and is progressively increasing at the intersection of Dowling Avenue and La Palma Avenue; and WHEREAS, a study has been completed and the conclusion drawn that traffic conditions at said intersection warrant the installation of a traffic signal and intersection lighting sys- tem for the proper and orderly movement of traffic; and WHEREAS, the City of Anaheim and the County of Orange are willing to cooperate in the installation of the required traffic signals and intersection lighting systems and-in the contribution to the maintenance of said systems subsequent to their installation, and desire to enter into an agreement pro- viding for the joint installation and maintenance of said traf- fic signals and intersection lighting systems. NOW THEREFORE BE IT RESOLVED by the City Council of the City of Anaheim that an agreement be made and entered into between the City of Anaheim and the County of Orange, pro viding for the joint installation of a lighting and traffic signal system at the intersection of Dowling and La Palma Avenues, upon the following terms and conditions: 1. CITY SHALL: A. Prepare the detailed plans, specification and esti- mates for the project. B. Approve the plans and specifications as to design construction features affecting the construction and opera- tion of that portion of the project within the County. C. Have jurisdiction of the construction area within the City and the County. D. Be designated as the contracting and construction agent for the parties to do and perform all acts and things necessary or required in order to construct the project in accordance with the plans and specifications, including material control, inspection and construction work, and to execute and deliver all documents necessary or required in connection with the construction and completion of said project, including certificate of day labor, equipment and material costs and certificate of completion of the project. E. Upon completion of the project, submit a full, true and correct copy of documents, certificates and itemized bills to the County, setting forth the construction and installation costs and costs of design, survey and construc- tion engineering. 2. COUNTY SHALL: A. Approve the plans and specifications as to design -1- and construction features affecting the construction and operation of that portion of the project within the County. B. Prepare maps and deeds for all necessary additional rights of way in the County. C. Acquire the rights of way for its portion of the project and certify to the City that such acquisition will be accomplished prior to award of contract. D. At all times during the progress of the construc- tion of the project have access to the work for the pur- pose of inspection thereof and should the County deem any remedial measures to be necessary, notify City thereof. E. Reimburse the City and pay to the City the County's share of all the costs within thirty (30) days after the submission of the statement of the construction and installa- tion costs and costs of design, survey and construction engineering as hereinbefore mentioned. 3. COST. The proportionate share of costs to be borne by the respective parties shall be based on contract prices, and the County's share shall be one quarter of the cost of the project and the City's share of the cost shall be three quarters of the cost of the project. It is estimated that the total cost of installation will be approximately Twenty Five Thousand Dollars ($25,000.00), plus engineering and contingencies. In addition to its proportionate share of construction and installa- tion cost, the County shall pay one quarter of the design, survey and construction engineering costs. 4. ROAD WORK. Any and all road work which is necessary in connection with the project shall be paid for by the respec- tive parties on the basis of the actual work done within the geographical limits of their respective jurisdiction, and such shall be paid for on the basis of contract prices. 5. MAINTENANCE. After the completion of the project, the traffic signal and intersection lighting systems shall be maintained by the City, and the County shall pay to City, upon submission of said maintenance and energy costs, one quarter of the total amount. BE IT FURTHER RESOLVED that the Mayor and City Clerk be, and they are hereby authorized to execute said agreement for and on behalf of the City of Anaheim. THE FOREGOING RESOLUTION is approved and signed by me this 7th day of December, 1965. ATTEST: 0_ TH tITY OF ANAHEIM MAYOR OF THE CITY OF N EIM -2- (SEAL) STATE OF CALIFORNIA COUNTY OF ORANGE T ss. CITY OF ANAHEIM I, DENE M. WILLIAMS, City Clerk of the City•of Anaheim, do hereby certify that the•foregadng Resolution No. 65R -909 was introdUced and adopted at a regular meeting provided by law, of the City Council of the City of Anaheim, held on the 7th•day of December, 1965, by the .following vote of the members thereof: AYES: COUNCILMEN: Dutton, Pebley, Schutte, Chandler and Krein NOES r COUNC ILMEN* None ABSENT: COUNCILMEN: None AND I, FURTHER CERTIFY that the Mayor of the City of Anaheim approved and signed said Resolution No. 65R -909 on the 7th day of December, 1965, IN WITNESS *HEREOF, I have hereunto set my hand and affixed the official seal of the City of Anaheim this 7th day of December,'1965. I, DENE M. WILLIAMS, City Clerk of the City of Anaheim, do hereby "certify that the foregoing is the original of Resolution No. 65R -909 duly passed and adopted by the Anaheim City Council on December 7, 1965. CI CLERIC OF •THE CITY OF ANAHEIM CITY CLERK