Loading...
91-336 RESOLUTION NO. 91R-336 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ANAHEIM AMENDING RATES, RULES AND REGULATIONS FOR THE SALE AND DISTRIBUTION OF ELECTRICITY AS ADOPTED BY RESOLUTION NO. 71R-478 AND MOST RECENTLY AMENDED BY RESOLUTION NO. 90R-349. WHEREAS, the City of Anaheim maintains an electric generation and distribution system for the furnishing of electricity to residents and inhabitants of the City of Anaheim and has adopted Electric Rates, Rules and Regulations for the sale and distribution of electricity; and WHEREAS, the Public Utilities Board held a public hearing on August 8, 1991 and evidence was presented in connection with proposed revisions of Electric Rates, Rules and Regulations; and WHEREAS, a Notice of Hearing was published as follows: 1. On July 29, 1991, notice of the public hearing on water rates was published in the Orange County Register and proof thereof is on file with the Secretary of the Public Utilities Board. 2. On July 28, 1991, notice of the public hearing on water rates was published in the Orange County Edition of the Los Angeles Times and proof thereof is on file with the Secretary of the Public Utilities Board. 3. On July 29, 1991, notice of the public hearing on water rates was published in the Anaheim Bulletin and proof thereof is on file with the Secretary of the Public Utilities Board. WHEREAS, the Public Utilities Board considered the California Environmental Quality Act and made the findings set forth in the record of the public hearing, including the finding that the establishment of these rates is exempt from the California Environmental Quality Act pursuant to Section 21080(b) (8) of the Public Resources Code; and WHEREAS, the Public Utilities Board considered the proposal of the Public Utilities Department and the evidence presented at the public hearing, and has made findings with respect to the need for changes to the Electric Rates, Rules and Regulations which findings have been provided to the City Council; and WHEREAS, based on its findings, the Public Utilities Board has recommended to the City Council that the Council adopt the changes to the Electric Rates, Rules and Regulations as shown in Appendix A; and WHEREAS, the City Council has considered the evidence presented at the public hearing and the findings of the Public Utilities Board. NOW, THEREFORE BE IT RESOLVED that: 1. The City Council of the City of Anaheim hereby makes the following findings with respect to the need for changes to the Electric Rates, Rules and Regulations: a. The Electric System revenue requirement of the Anaheim Public Utilities Department was established, as set forth below, on the basis of projections for the 1991- 92 fiscal year consisting of the twelve months July 1, 1991 through June 30, 1992. b. A reasonable estimate of the revenue requirement for power supply for the test period is $149,767,000 including the cost of surplus power. c. A reasonable estimate of the revenue requirement for other operating expenses for the test period is $25,293,000. d. A reasonable estimate of the revenue requirement for capital expenditures funded from rates for the test period is $22,821,000. e. A reasonable estimate of the revenue requirement for current debt service and principal and reserve increases for the test period is $30,364,000. f. A reasonable estimate of the revenue requirement for transfer to the General Fund for the test period is $8,734,000. g. A reasonable estimate of the revenue requirement for an increase in working capital for the test period is $791,000. h. A reasonable estimate of the revenue requirement offsets due to other electric revenues and interest income for the test period is $33,126,000. i. The estimated service life of SONGS is thirty years and the estimated retirement date is October 18, 2013. j. The decommissioning cost estimate for SONGS is $639,700,000 (1988 dollars) of which the city of Anaheim's share is 3.16%. k. A reasonable estimate of the revenue requirements for decommissioning costs for the test period is $1,574,000. 1. It is appropriate to include decommissioning costs in the utility rates charged to all customers. m. An estimated revenue requirement of $204,644,000 as set forth below, is appropriate for the test period: REVENUE REQUIREMENT ITEM CASH-FLOW BASIS Power Supply Costs $149,767,000 Other Operating Expenses 25,293,000 Capital Expenditures Funded from Rates 22,821,000 Debt Service & Reserve Increase 30,364,000 Transfer to General Fund 8,734,000 Change in Working Capital 791,000 Less: Other Electric Revenue and Interest Income (33,126,000) Total Revenue Requirement $204,644,000 n. It is appropriate to perform a cost-of-service study in order to determine the allocated revenue requirement for the test period for the following customer classes: Residential, Small Commercial, Large Commercial, Industrial, Agricultural and Pumping, Street Lights and Municipal. o. The estimated total allocated annualized revenue requirement is $208,162,000. The Customer Class revenue requirements, on a Utility basis, as determined by a cost-of-service analysis and set forth below, is appropriate for the test period: ALLOCATED ANNUALIZED REVENUE REQUIREMENT CUSTOMER CLASS COST-OF-SERVICE BASIS Residential $ 48,615 000 Small Commercial 12,839 000 Large Commercial 50,985 000 Industrial 88,720 000 Agricultural and Pumping 1,839 000 Street Lights 149 000 Municipal 5.015 000 Total $208,162,000 p. Section 1221 of the City Charter provides that utility rates charged to a class of consumers shall be uniform within the class and shall be based on cost of service revenue requirement for the class. Section 1221 also provides that lifeline rates may be established which would not necessarily be based on cost of service. q. It is appropriate to phase in rate changes to bring class revenues to their cost-of-service levels when one time changes would be burdensome to a particular customer class. The Department intends to bring rates in line with cost of service. r. The California Public Utilities Commission has established baseline rates for Southern California Edison Company ~''~' (Edison) and Edison is the retail supplier of electric service in all the communities surrounding Anaheim, and therefore, it is appropriate to establish residential lifeline rates for Anaheim. s. To the extent that the Anaheim lifeline rates produce lower revenues than would be produced by rates based on cost of service, the rates charged for nonlifeline sales must be increased above the level of rates based on cost of service. The difference between the revenues from sales made at the lifeline rates and revenues from those sales made at cost-of-service rates is the lifeline ~ shortfall. t. In allocating the lifeline shortfall to the nonlifeline customers, it is appropriate to give consideration to both cost of service and the retail rates of Edison. u. On the basis of the preceding findings, the annual class revenues under the proposed rates as shown above are reasonable and appropriate: REVENUES AT PROPOSED RATES AS A % OF REVENUES AT REVENUES BASED ON CUSTOMER CLASS PROPOSED RATES COST OF SERVICE Residential Lifeline 22,119,000 73.6 Nonlifeline 26.638.000 143.4 Total Residential 48,757,000 100.3 Small Commercial 11,989,000 93.4 Large Commercial 51,267,000 100.6 Industrial 88,767,000 100.0 Agricultural & Pumping 1,923,000 104.6 Street Lights 210,000 140.9 Municipal 5,249,000 104.7 208,162,000 100.0 v. It is appropriate that the Rate Stabilization Account (RSA) be used as a means of providing more stable retail electric rates for the customers of the City's Electric Utility. It is appropriate to temporarily stop the rate stabilization program when there are no funds remaining in the RSA. Likewise, it is appropriate to resume the program when refunds are received from Edison. The Stabilization Rate may still remain in effect despite the '~'~ temporary discontinuance of the program. w. It is appropriate that the Power Cost Adjustment (PCA) mechanism be kept as an emergency procedure to hedge against sudden and unforeseen changes in power supply costs. Generally, power supply costs will be recovered through application of the base rate. In the event that substantial changes in projected power supply costs occur, either as an increase or decrease, the Power Cost Adjustment Billing Factor will be activated to ensure that the Department charges appropriately for electric service. When activated, the Billing Factor will remain in effect ~ until the next base rate change or until a revision to the Billing Factor is necessary. At the time of a base rate change, the power supply costs recovered through the Billing Factor will be included in base rates and the Billing Factor will be deactivated and returned to zero. Continuation of this mechanism would enable the Department to take rapid rate action in order to protect its financial stability. x. It is appropriate to decrease the Electric Utility power supply budget for 1991/92 from $154,320,713 to $149,767,000. y. It is appropriate to decrease the Electric Utility revenue from sales budget for 1991/92 from $213,733,860 to $204,644,000. z. It is appropriate to increase the Electric Utility Rate Stabilization Adjustment budget for 1991/92 from $7,265,000 to $11,488,000. aa. It is appropriate to increase the Electric Utility General Fund Transfer for 1991/92 from $8,572,000 to $8,734,000. bb. Reasonable estimates for engineering and service fees and charges are contained in the proposed Electric Rates, Rules and Regulations. 2. The changes and additions to the Electric Rates, Rules and Regulations as shown in Appendix A are hereby adopted by the City Council of the City of Anaheim. THE FOREGOING RESOLUTION is approved and adopted by the City Council of the City of Anaheim on this 17~h day of December , 1991. ~RR OF T ANAHEIM ATTEST: CITY CLERK OF THE CITY OF ANAHEIM STATE OF CALIFORNIA ) COUNTY OF ORANGE ) SS. CITY OF ANAHEIM ) I, LEONORA N. SOHL, City Clerk of the City of Anaheim, do hereby certify that the foregoing Resolution No. 91R-336 was introduced and adopted at a regular meeting provided by law, of the Anaheim City Council held on the 17th day of December, 1991, by the following vote of the members thereof: AYES: COUNCIL MEMBERS: Simpson, Pickler, Daly and Hunter NOES: COUNCIL MEMBERS: Ehrle ABSENT: COUNCIL MEMBERS: None AND I FURTHER certify that the Mayor of the City of Anaheim signed said Resolution No. 91R-336 on the 18th day of December, 1991. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of the City of Anaheim this 18th day of December, 1991. CITY CLERK OF THE CITY OF ANAHEIM (SEAL) I, LEONORA N. SOHL, City Clerk of the City of Anaheim, do hereby certify that the foregoing is the original of Resolution NO. 91R-336 duly passed and adopted by the City Council of the City of Anaheim on December 17, 1991. CITY CLERK OF THE CITY OF ANAHEIM  Appendix "A" cr~ OF ANAHEIM, CALIFORN~ ,. Public Utilities Depa~ment DATE: November 14, 1991 TO: Public Utilities Board FROM: Public Utilities General Manager SUBJECT: Electric Utility Rate Action RECOMMENDATION That the Public Utilities Board (PUB) recommend to the City Council a rate action proposed to be effective January 1, 1992 supporting the Electric Utility's programs and projects for Fiscal Year (FY) 91/92 and the first half of FY 92/93. DISCUSSION On October 1, 1991, the City Council denied the Utility Department's request for a 4.5% increase in electric rates. This rate increase was necessary to support the Electric Utility's FY 91/92 budget as adopted on June 18, 1991 and September 10, 1991. After the city Council's action, Department staff delayed and/or deferred Electric Utility program expenditures planned for FY 91/92. These delays totaled approximately $7.0 million and brought spending in line with projected revenues until alternative actions could be prepared. Department staff has prepared, and is submitting for PUB consideration and review, three electric rate scenarios. The following table summarizes these rate scenarios: Forecast 1992 1993 1994 Base Case 0.0% 16.0% 9.0% (Current situation) Original Rate Proposal 4.5% 9.0% 6.0% Revised Rate Proposal 3.5% 9.0% 7.0% Rate increases effective January 1 These rate scenarios are based on the following assumptions: 1. The Electric Utility will rely more heavily on the Rate Stabilization Account (RSA) to offset operating costs. Staff (714) 254-5100 P.O. Box 3222, Anaheim, California 92803 Public Utilities Board November 14, 1991 Page 2 of 5 reviewed the amount of RSA funds to be used as previously proposed to the City Council in October and now proposes the accelerated use of RSA funds. The forecast for using the RSA funds assumes the receipt of additional settlements from SCE within the next twelve months. There is currently approximately $17.5 million available in the RSA. A comparison of the October proposal and the revised proposal is as follows: ($'s in millions) Octobe~ Proposed FY 91/92 8.0 11.5 Forecast FY 92/93 13.2 13.2 Forecast FY 93/94 13.6 19.4 2. The Department is preparing to downsize the organization. The implementation of the second phase of the Management Audit and additional management efficiency studies are projected to produce annual savings to the Department of about $1.6 million. Included are the elimination of.approximately 15 positions, of which 10 are expected to be full-time positions. Approximately 75 percent of these savings are expected to be within the Electric Utility ($1.2 million). These savings will begin to be realized during the 1992 calendar year and should be fully implemented within 18 months. This is in addition to the audit savings of $1 million and the elimination of 5 management positions which have already been incorporated into the budget. 3. Some of the programs delayed and/or deferred are resumed on January 1, 1992. The Department has several key capital projects totaling about $5.0 million that must begin. These projects support~ growth in East Anaheim, the I-5 widening, and system reliability. Also resuming on January 1,1992 are demand side management programs which were delayed. These programs will help customers reduce their electric consumption while reducing the Electric Utility's long-term power supply costs. 4. The Department forecasts that the economic slowdown affecting the Southland area will continue through early 1992, slowing commercial and residential development. The timing for projects related to this development has shifted out, reducing near term capital expenditures but possibly exacerbating future capital needs if the economy strongly rebounds. 5. Under the original rate proposal and the revised rate proposal the Underground Conversion Program would be funded an additional .5% in FY 91/92, to a total of 1% of overall rates. The base case scenario has no additional funding in FY 91/92 for Public Utilities Board November 14, 1991 Page 3 of 5 undergrounding. All three scenarios contain a 1% increase in rates in the forecast for 1993 and 1994 for undergrounding. 6. The Department does not expect to request further rate action until January 1993. All subsequent rate actions will be on a calendar year basis. Future rate changes will also correspond to SCE's annual rate adjustments making it easier to compare Anaheim's rates to SCE's on an annual basis. A brief discussion of each of the three rate scenarios follows. BASE CASE: Forecast ~' 1992 1993 1994 0.0% 16.0% 9.0% The base case consists of no rate increase in FY 91/92. Although there would be no rate increase in FY 91/92, this scenario forecasts a double-digit increase in 1993. The large increase forecast in 1993 is followed by an increase in 1994 that is greater than that projected in either the original rate proposal or the revised rate proposal. These projected increases in the second and third years are undesirable but necessary to keep debt service coverage at acceptable levels and to fund capital projects. Debt service coverage is lowest under this scenario due to the extended delay in rate action. Additionally, the reluctance to raise rates over an extended period of time could be negatively perceived by the rating agencies which could result in lower credit ratings. Lower credit ratings would increase the electric Utility's cost of borrowing. The additional planned .5% increase in rates to fund the Underground Conversion Program is not implemented in this scenario. Funding would not be provided to meet either the existing undergrounding plan, or the revised plan which will be submitted to the PUB in coming weeks. Finally, the base case will result in considerable rat~ shock due to the double-digit increase forecast in 1993. ~' ORIGINAL R~TE PROPOSAL: Forecast 1992 1993 1994 4.5% 9.0% 6.0% The original rate proposal consisted of a 4.5% increase in electric rates effective September 1, 1991. Public Utilities Board November 14, 1991 Page 4 of 5 This scenario provides a stable pattern of rate increases in all years. Debt service coverage is better under this scenario compared to both the base case and the revised rate proposal. Maintaining existing credit ratings is also best supported under this scenario. The original rate proposal also maintains the Department's competitive position with SCE as the projected future annual increases for the Electric Utility are comparable or better than those projected for SCE. This scenario contains the lowest projected rate increase in 1994 and provides the most flexibility to deal with the projected increase in 1993 than either of the other scenarios. REVISED RATE PROPOSAL: Forecast 1992 1993 1994 3.5% 9.0% 7.0% The revised rate proposal consists of a 3.5% increase in electric rates effective January 1, 1992. The original rate increase proposed by the Department was 4.5% effective September 1, 1991. The revised rate proposal forecasts relatively stable rate increases in 1993 and 1994 while maintaining reasonable debt service coverage ratios. This scenario recognizes that current economic conditions warrant keeping today's rate increases as low as possible while still providing sufficient revenues to support operations. The revised rate proposal also maintains the Department's competitive rate relationship with SCE as none of the annual increases for the Electric Utility are excessively above those projected for SCE. This scenario does forecast a larger rate increase in 1994 than would be required under the original rate proposal (7.0% vs 6.0%). STAFF RECOMMENDATION The Department recommends adoption of the revised rate proposal. Rat~ relief is needed in FY 91/92 to cover increased costs for power supply, debt service and financial reserves. The Department's staff believes that with the planned downsizing, the proposed 3.5% rate proposal is livable. The revised rate proposal will fund capital projects necessary for system reliability and growth while at the same time increasing the funding for the Underground Conversion Program. Additionally, this Public Utilities Board November 14, 1991 Page 5 of 5 scenario avoids rate shock by avoiding the need for double-digit rate increases over the next 3 years. This scenario also maintains adequate debt service coverage, protecting the Electric Utility's credit ratings. Rate increases by class have been prepared at this time and are presented in the following table. Class % Increase Residential 2.8% Small Commercial 5.0% Large Commercial 3.3% Industrial 3.8% Ag/Pumping 3.5% Street Lights 0.0% Municipal 3.5~ System 3.5% In addition to recommending the revised rate proposal, the Department is also reco~mending that the Electric rule and fee changes proposed in the original rate proposal be adopted. These rule and fee changes are provided for Board consideration. IMPACT ON THE RESOURCE ALLOCATION PLAN Revenues sufficient to fund the approved FY 91/92 RAP have not been adopted. Under any of the scenarios presented, it will be necessary to amend the FY 91/92 RAP to reflect a lower level of funding. Respectfully submitt~ Edward K. Aghja~n / v Public Utilities~C~neral Manager ~:i~t:es F:nanc:ai %,~ ~ces A.N'D I~EGL~LATIONS S xm,me~m Bhd An~eirn, CA q2g05 P~ge No RATES, RULES AND REGULATIONS TABLE 0F CONTENTS EFFECTIVE TITLE DATE PA~ Title 10-01-89 i Table of Contents 01-01-92 08 01 95 ii 01-01-92 08 01 ~O iii " *' 01'01'92 '03 Cl 90 iv 01-01-92 n~ n, ~, Electric Utility Policy 11-14-71 1.0.1 Rate Schedules 10-01-89 2.0.1 Schedule pCA Power Cost Adjustment 10-01-89 2.0.2.1 " " " " 10-01-89 2.0.2.1.1 " " " 10-01-89 2.0.2.2 Schedule D: Domestic Service 01-01-92 C~ 91 9C 2.1.1 " " " " 01-01-92 .... 90 2 1 2 " " " 01-01-92 .... 90 2.1.3 " " " 06-01-79 2.1.4 " " " " " 2.1.5 " " " 11-03-82 2.1.6 Schedule No. GS-I: General Service 01-01-92 02 ~I ~0 2.2.1 " " " " " 10-01-89 2 .2.2 Schedule No. GS-2: General Service 01-01-92 ...... 2.3.1 " " " " 10-01-89 2.3,2 Schedule No. TOU: Time-of-Use 01-01-92 Ol 01 91 2.4.1 " " 01- 01-91 2 .4 .2 " " " " 01-01-92 ...... 2 4 3 " " " 01-01-91 2 ,4 .4 Schedule No. TES: Thermal Energy Storage 01-01-92 01 01 ~1 2.5.1 " " " " 01°01'92 ~ ..... 2.5.2 " " 01-01-91 2.5.3 " " " 01-01-91 2.5.4 (Continued) ISSUED BY Ed Aghjayan Effective 01-01-92 By Resolution No. 91R- Dated General Manager Superceding Resolution No. 90R-349 Dated t,~-I 1-90 &nane~m. CA g2805 Page No i-,- RATES, RULES g/qlD REGULATIONS TABLE OF CONTENTS (Continued) EFFECTIV~ TITLE DATE PAGE NO. Rule No. 4: Contracts 11-14-71 3.4.1 " " 3.4.2 Rule No. 5: Special Information Required on Forms 10-01-89 3.5.1 " " " " " " " 10-01-89 3 Rule No. 6: Establishment and Reestablisblnent 11-14-71 3.6.1 of Service " " " " " 3 . 6.2 Rule No. 7: Deposits 10-01-89 3,7.1 Rule No, 8: Notices 10-01-89 3.8.1 Rule No, 9: Rendering & Payment of Bills 10-01-89 " " " " " " 10-01-89 3.9.2 Rule No. 10: Disputed Bills 10-01-89 3.10,1 Rule No. ll: Discontinuance & Restoration of Service 01-01-92 10 01 ~g 3.11.1 " " 10-01-89 3.11,2 " " " " 10-01-89 3.11 " " " 10-01-89 3 Rule No. 12: Rates and C~tional Rates 10-01-89 3.12.1 " " " " " " 10-01-89 3.12.2 Rule No. 13: Temporary Service 10-10-78 3.13,1 Rule No. 14: Shortage of Supply and Interruption of Delivery 08-01-90 3.14.1 Rule No. lS,0: Line Extensions 01-01-92 11 1~ 71 3.15.0.1 " " 01-01-92 ** ~* ~ 3.15.0.2 "· " " 11-14-71 3.15.0.3 " " " " " " 3. " " " " " " 3.15.0.5 Rule NO. 15.1: Underground Extensions Within New Residential Subdivisions 11-14-71 3.15. l. " " " " " "01-01-92 ...... 3 lS 1 2 Rule No. lS.2: Underground Extensions Within New Commercial and Industri&l Developments 01 - 01- 92 3.15.2.1 Rule No. 16: Service Connections and Facilities on Customers' Premises 6-01-79 3.16.1 ,t " '" " 11-03-82 3.16,2 " " " " 11-14-71 3 .16.3 ". " " " 11-03-82 3.16 " " " " 11- 14- 71 3.16.5 " " " " " 3.16.6 " " " " " 3.16.7 Rule No. 17: Meters Tests and Adjustment of Bills for Errors 10-01-89 3.17.1 (Cont inued) ISSUED BY Ed Aghjayan Effective 01-01-92 By Resolution No. 91R- Dated__ General Manager Superceding Resolution No. 90R-27l Dated 07-24-90 2~:c< F:nanc;,u Se,~ ~ces .~.h'D REGL'L~.TIONS ~n~ne:m Bl~d ~TES, RULES ~ REGU~TIONS T~LE OF C0~E~S (Continued) EFFECTI~ TITLE DATE PAGE NO. Schedule No. PA: Power-Agriculzural 01-01-92 ~ ~ ~ 2.6.1 Schedule No, LS-i: Lighting - Street ~d Highway City-O~ed Lightin~ Districts 08-01-90 2.7.1 Schedule No. LS-2: Li~htin9 - Street ~d Highway, Customer-O~ed Installation U~etered 08-01-90 2.8.1 Schedule No. LS-3: Li~htin~ - Street and Highway, Customer-O~ed Ins~allazion Me~ered 08-01-90 2.9.1 Schedule No. LO: Lightin~ - Outdoor Area City-O~ed System 08-01-90 2.10,1 " " " " 08- 01- 90 2 . 10 . 2 Schedule No. ~: M~icipal Service 0~-0~-92 ~8 ~I ~ 2.11.1 Rules and Re~lations 10-01-89 3.0.1 Rule No. 1: Definitions 10-01-89 3.1.1 " 10-01-89 3.1.2 10-01-89 3.1.3 11-14-71 3.1.4 3.1.5 10-01-89 3.1.6 10-01-89 3.1.7 Rule No, 2: Descri )tion of Service 01-06-88 3.2.1 3.2.2 3.2.3 3.2.4 3.2.5 3.2.6 3.2.7 3.2.8 10- 0~- 89 3.2.9 01-06-88 3.2.10 01-06-89 3.2.11 Rule No. 3: ~plication for Se~ice 07-19-78 3.3.1 ,' " " " " 10-01-89 3.] .2 (Continued) ISSUED BY Ed Aghjayan Effective 01-01-92 By Resolution No. 91R- Dated__ General Manager Superceding Resolution No. 90R-271 Dated 07-24-90 R~TES, RULES AND REGULATIONS TABLE OF CONTENTS (Continued) EFFECTIVE TITLE DATE PAGE NO. Rule No. 17: Meter Tests and Adjustment of Bills for Errors 10-01-z. 3.17.2 Rule No. 18: Supply to Separate Premises and Resale 10-01-89 3.18.1 Rule No. 19:Rate Stabilization Account 01-06-88 3.19.1 . ,, 01-01-92 ~ ~I ~ 3.19.2 Rule No. 20: Replacement of Overhead with Underground Distribution Facilities 01-01-92 00 01 90 3.20.1 " " " " "01-01-92 .... a~ 3.20.2 " " " " " 01-01-92 ..... ~ 3.20.3 Rule No. 21: Swimming Pool Off-Peak Filtration 10-01-89 3.21.1 . . . . 06=08-82 3.21.2 Rule No. 22: Cogeneration and Small Power Production Interconnection Standards 11-18-86 3.22.1 ,, . . " 3 . 22 . 2 . ,, . . ,, " 3.22.3 ,, ,, ,, . ,' " " 3 . 22.4 . ,, ,, ,, ,, ,' " 3 . 22 . 5 Rule No. 23: Utility Charges 01-01-92 ~ Cl 90 3.23.1 Rule No. 24: Electric Division Charges 01-01-92 3.24,1 · · · · · 01-01-92 3.24.2 · · · · · 01-01-92 3.24.3 ISSUED BY Ed Aghjayan Effective 01-01-92 By Resolution No. 9[P~- Dated__ General Manager Superceding Resolution No. 90R-271 Dated 07-24-90 CITY OF ANAHEIM ELECTRIC RATES, RULES, Utilities Financial Services AND REGULATIONS 200 S. Anaheim Blvd. Anaheim, CA 92805 Page No. 2.1.1 SCHEDULE NO. D DOMESTIC SERVICE APPLICABILITY - SCHEDULE DS Applicable to domestic service including lighting, heating, cooking and power or combination thereof in a single-family accommodation. RATES Rate A (01) is applicable where the customer is entitled to only the Basic Residential Use lifelifie allowances. Rate B (02) is applicable where the customer is entitled to the additional lifeline allowances for electric water heating. Rate C (03) is applicable where the customer is entitled to the additional lifeline allowance for electric space heating. Rate D (04) is applicable where the customer is entitled to the additional lifeline allowances for both electric water and space heating. Rate E (16) is applicable where the customer is entitled to any additional lifeline allowance for life support systems. Per Meter Lifeline Usage: Per Month Customer Charge .............................................................................$ 2.85 Energy Charge (to be added to Customer Charge): First 240 kwh for Electric Water Heating, per kwh ........................... 6.77C Plus 250 kwh for Electric Water Heating, per kwh ............................ 6.77¢ Plus 550 kwh for Electric Space Heating, for November 1 thru April 30, per kwh .....................................................6.77C Plus all kwh for Life Support Allowance, per kwh ............................ 6.77¢ Nonlifeline Usage: All kwh in excess of the above, per kwh ..................................................11.15C Minimum Charge: The minimum charge shall be the monthly Customer Charge. ISSUED BY Ed Aghjayan Effective 01-01-92 By Resolution No. 91R-336 Dated 12-17-91 General Manager Superseding Resolution No. 90R-271 Dated 07-24-90 ~n~:m Bi~d SCHEDULE NO. D DOMESTIC SERVICE (Continuedl APPLIC_ABILITY - SCHEDULE DSM Applicable to domestic service including lighting, heating, cooking, and power or combination thereof ~n a multifamily accormmodation on a single premises where all of the single-f~ily acco~odations are no~ separately metered. Closed ~o new installations as of June 1, 1979 excep~ as o~herwise provided in Rule No. 16. ~TES Rate A (0~) is apDlic~le where the customer is entitled to only the Basic Residential Use lifeline allowance. Rate B (10) is applic~le where the customer is entitled to the addizional lifeline allow~ce for electric water heating. Rate C (11) is applic~le where the customer is entitled to the additional lifeline allow~ce fo: electric space heating. Rate D (12) is aDplic~le where the customer is entitled to the additional lifeline allow~ces for bo~h electric water ~d space heating. Rate E (16) is applic~le where the customer is entitled to ~y additional lifeline allow~ce for life support systems. Per Me~er Lifeline Usage: Per Month Customer Charge ......................................... ~2.75 Ener~ Charge (to be added to Customer Charge): First 190 kwh*, Basic Lifeline, per kwh ............ ~.~ 6.77¢ Plus 200 kwh* for Electric Water Heating, Der kwh -- ~.~ 6.7V¢ Plus 330 kwh* for Electric Space Heating, for Nove~e~ 1 th~ ~ril 30, per kwh ............. C.4~¢ 6.77¢ Plus all kwh for Life Support Allow~ce, per kwh --- ~.~C 6.77¢ Nonlifeline Usage: All kwh in excess of the ~ove, per kwh Minim~ Charge: The minim~ charge shall be the monthly Customer Charge. *The kilowatt-hours for these blocks shall be multiplied by the n~er of sin~le-f~ily acco~odations on the meters. ISSUED BY Ed Aghjayan Effective 01-01-92 By Resolution No. 911~- Dated.__ General Manager Superceding Resolution No. 90R-271 Dated 07-;~4-90 i t:l~r;e~ F~n3~c:al Semites X.NI) REGULATIONS 20{) 5 ~nane~m Bl,.d ~aahetm. CA 92805 ?~ge N,~ :.'- ~ SCHEDULE NO. B DOMESTIC SERVICE APPLICABILITY-SCHEDULE DSMS Applicable to domestic service including lighting, heating, cooking, and power or a combination thereof in a multifamily accommodation on a single premises where all of the single-family accommodations are separately sub-metered. P~ATES Rate A (05) is applicable where the customer is entitled to only the Basic Residential Use lifeline allowance. Rate B (06) is applicable where the customer is entitled to the additional lifeline allowance for electric water heating. Rate C (07) is applicable where the customer is entitled to the additional lifeline allowance for electric space heating. Rate D (08) is applicable when the customer is entitled to the additional lifeline allowances for both electric water and space heating. Rate E (16) is applicable where the customer is entitled to any additional lifeline allowance for life support systems. Per Meter Lifeline Usage: Per Month Customer Charge ~ "= $2.85 Energy Charge (to be added to Customer Charge): First 240 kwh*, Basic Lifeline, per kwh .......... :.~ 5.46¢ Plus 250 kwh* for Electric Water Heating, per kwh -- ~.~ 5.46¢ Plus 550 kwh* for Electric Space Heating, for November 1 thru D4~ril 30, per kwh ............... 4.~ 5.46¢ Plus all kwh for Life Support Allowance, per kwh --- ~.~ 5.46¢ Nonlifeline Usage: All kwh in excess of the above, per kwh ................. II.0~ 11.15¢ Minimunn Charge: The minimum charge shall be the monthly Customer Charge. *The kilowatt-hours for these blocks shall be multiplied by the number of single-faraily accommodations on the meter. (Continued) ISSUED BY Ed Aghjayan Effective 01-01-92 By Resolution No. 91R- Dated ,, General Manager Superceding Resolution No. 90R-271 Dated Q7-¢4-90 SCHEDULE NO. GS-1 GENEP~kL SERVICE APPLICABILITY Applicable to single and three phase ~eneral service including lighting and power. Per Meter RATES Per Month Rate A (13) Customer Charge ........................................ $7.50 $10.00 Energy Charge (to be added to Customer Charge): All kwb, per kwh ................................ 10.~C¢ 10.90¢ Minimum Charge: The minimum charge shall be the monthly Customer Charge. Rate B (14) and (19) Demand Charge: First 15 KW or less of billing demand ........... $99.59 $97.S0 All excess KW of billing demand, per KW ......... $ 5~DC $6.50 Energy Charge (to be added to Demand Charge): All kwh, per kwh ................................ 7.259~ 7.35¢ Minimum Charge: The minimum charge shall be the monthly Demand Charge. SPECIAL CONDITIONS A. Service voltage per rules and regulations. B. Rate B is applicable when a demand meter is installed in accordance with Special Condition E. (Continued ISSUED BY Ed Aghjayan Effective 01-01-92 By Resolution No. 91R- Dated General Manager Superceding Resolution No. 90R-271 Dated Q7-24-90 APPLICABILITY Applicable to single and three phase general service including lighting and power. This schedule is mandatory for all customers whose monthly maximum demand has exceeded 200 kw for any three months during the preceding 12 months and whose average demand for the preceding 12 months also exceeds 200 kw. Any customer whose monthly maximum demand has fallen below 200 kw for any three months during the preceding 12 months and whose average demand for the preceding 12 months also is less than 200 kw may elect to take service on Schedule GS-1B Per Meter P~ATE (21) Per MQnth Demand Charge: First 200KW or less of billing demand .......... $i,100.00 $1,600.00 All exoess KW of billing demand, per KW ........ $7.00 $8.00 Energy Charge (to be added to Demand Charge): All kwh, per kwh .............................. ~.71~ 6.80¢ Minimum Charge: The monthly minimum charge shall be the monthly Demand Charge. SPECIAL CONDITIONS A. Service voltage per rules and regulations. B. Billin~ Demand: The billing demand in any month shall be the average kilowatt input indicated or recorded by instruments to be supplied, owned, and maintained by the City and at the City's expense upon the consumer's premises adjacent to the watt-hour meter, in the 1S minute interval which the consumption of electric energy is greater than in any other 15 minute interval in the month, but not less than either (1) 50% of the contracted for or connected load, or (2) 50% of the highest billing demand in the preceding eleven months, whichever is the greater. However, in no case shall the billing demand be less than 200 k"w. Billing demand shall be determined to the nearest KW. Whenever the measured maximum demand has exceeded 400 KW for three consecutive months and thereafter until it has fallen below 300 KW for 12 consecutive months, a ~0 minute interval will be used. Where the demand is intermittent or s~bjected to violent fluctuations, the maximum demand may be based on a shorter interval. (Continued) ISSUED BY Ed Aghjayan Effective 01-O1-92 By Resolution No. 91R- Dated General Manager Superceding Resolution No. 90R-27t Dated 97-24-90 APPLICABILITY Applicable to three-phase electric service of customers whose monthly maxzmum demand was 500 KW or greater for any three months during the preceding 12 months or, if no prior billing history is available, whose total connected lighting and equipment load is 750 KW or greater.; also applicable to customers who contract with the Utilities Department as part of the Demand Side Management Program. AVAILABILITY A cuetomcr clccting ocrvice undcr this ratc schcdulc may do es aftor 01 01 91. A customer desiring service on this schedule or currently served on this schedule and desiring service on a differsnt schedule shall notify the City in writing at least ninety (90) days in advance of his intended change in service schedule, (unless meter availability allows less notice), and will be restricted from exercising the option to switch schedules more than once in any twelve-month period. Service under this schedule is subject to meter availability, P~ATES ( ) Per Meter Per Month Summer Winter Demand Charge: All on-peak billing demand-per KW $ 11.20 N/A Plus all mid-peak billing demand, per KW $ 0.20 $5.00 $ 5.50 $4.50 Plus thc first 500 KW or lcso of off peak billing domand, pcr K'W ~ ...... ~ ...... Plus all off-peak billing demand in cxccss of ~00 KW, per KW $ 3.00 $ 3.00 Energy Charge (added to Demand Charge): All on-peak energy, per KWh ~ 9.90¢ N/A Plus all mid-peak energy, per KWh ~.0~ 6.90¢ C.9~0 7.30¢ Plus all off-peak energy, per KWh 5.15¢ 5.00~ %.~0¢ 4.50¢ Minimum Chargc: Thc monthly minlmu~ chargc shall bo thc monthly Dcm~nd Charge. SPECIAL CONDITIONS A. Service voltage per rules and regulations. ISSUED BY Ed Ag~hjg/..an Effective 01~01~92 By Resolution No. 91R- Dated Generlrl~anager Superceding Resolution No. 90R-349 Dated 09-I i-90 (vii.tics Financ:al Services ,~NI) REGL~LkTION'S ~n~e~m. CA %80. P~geNo SCHEDULE NO. TOU TIME-0F-USE (continued) SPECI3~L CONDITIONS (continued) Thc billing dcmand for ehc on peak pcriod in oummcr and the mid pcak pcriod in wintcr 0hall bc grcatcr of {i) thc maximum consumption of clcc~ric cncr~ in any 30 minutc intcrwal durin~ thc currcnt monthly billing pcriod, (ii~ of ~hc load lcvcl undcr contract with thc City, or (i~i) 50% of thc hi~hcst billin~ domed in the Drc~din~ cloven months. Billing demand shall be dete~ined to the nearest KW. ~ere the demand is inte~ittenc or s~ject to violent fluctuations, the maxim~ demand may be based on a shorter interval. D. Power Factor Adjustment The charges will be adjusted each month for the power factor as follows: The charges will be decreased by 20 cents per kilowatt of measured maxim~ dem~d ~d will be increased by 20 cents per kilovar of reactive demand. However, in no case shall the kilovats used for the adjustment be less one-fifth the n~er of kxlowat~s. The kilovars of reactive dem~d shall be calculated by multiplying the kilowatts of measured m~im~ dem~d by the ratio of ~he kilovat-hours to be kilowatt hours. Dem~d in kilowatts ~d kilovars shall be dete~ined t~ the nearest ~i~. A rachet device will be installed on the kilovar-hour meter prevent its reversal operation on leading power factor. E. Voltage Disco~t The char~es before power factor ~d power cost adjustments wi%l be reduced by 3% for service delivered ~d metered at voltages of from 2 or 10 ~; by for semite delivered ~d metered a~ voltages of from 11~ to 50~; ~d by 5% for se~ice delivered ~d metered at voltagms ~ove 50~; except tha~ when only one tr~sfo~ation from a tr~smission voltage level is involved, a customer no~ally entitled to a 3% distort will be entitled to a disco~t. Continued ISSUED BY Ed A~j~,an Effective 01-01-92 By Resolution No. 91R- Dated__ Genefa~Manager Superceding Resolution No. 90R-349 Dated 09-11-90 t.:::~ F n3nc'a~ Set,. ~ccq .~N1) I~EGL~,ATIONS S ~n~e~m BI',d ~n:~ulm. CA q2~05 Page N,~_ :' ~ : SCHEDULE NO. TES THERMAL ENERGY STO~AGE APPLIC3%BILITY Applicable to three-phase electric service for thermal energy storage equipmen~ which is metered separately from other lighting and e~ipmen~ load. AVAI~ILITY A cu~tomcr clcctin~ ~crv~cc undcr thi~ rate 0chcdulc may do ~o aftcr 01 01 91. A customer meeting the retirements set forth ~ove and desirin~ service on this schedule, or currently served on this schedule and desiring service on a differ~n~ sckedule, shall notify the City in writin~ at least ninety (90) days in advance of his intended change in service schedule (unless meter availability allows less notice). A customer will be retricted from exercising the option to sw~ch schedules more than once in any twelve-month period. Service under this schedule is subject to meter availability. ~TES ( ) Per Meter Per Month S~r Winter Demand Charge: All on-peak billin~ demand, per ~ $14.20 N/A Plus all mid-peak billing dem~d, per ~ $ 5.D0 $5.00 $ 5.5~ $4.50 Plus all off-peak billing dem~d, per ~ $ 3.00 $ 3.00 Ener~ Charge (added to Dem~d Charge) All on-peak ener~, per ~ ~.~ 7.~0¢ N/A Plus all mid-peak ener~, per K~ ~.~ 5.40¢ 5.~5~ 5.80¢ Plus all off-peak ener~, per ~ ~.15~ 3.80¢ 4.C0¢ 3.50¢ SPECI~ CO~ITIONS A. Service voltage per rules ~d re~lations. (Continued) ISSUED BY Ed A~[~j~?n Effective 01-01-92 By Resolution No. 9IR- Dated__ Gener~I Manager Superceding Resolution No. 90R-349 Dated 09-I 1-90 :!;¢s F:nanc:~ Sero ~ces .MNT} REGL'L-&'FIONS S An,m¢:m BI~J ~n~e~m. CA q2S05 Page No ; S C SCHEDULE NO. TES THER/4AL ENERGY STORAGE (continued) SPECIAL CONDITIONS (continued) B. Time periods are defined as follows: On-Peak: 1:00 p.m. to 7:00 p.m. summer weekdays except holidays. Mid-Peak: 8:009:00 a.m. to 1:00 p.m. and 7:00 p.m. to I~:009:00 p.m. summer weekdays except holidays. 7~009:00 a.m. to 9:00 p.m. winter weekdays except holidays. Off-Peak: All other hours. Off-peak holidays are New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, and Christmas. When any holiday listed above falls on Sunday, the following Monday will be recognized as an off-peak period. NO change in off-peak hours will be made for holidays falling on Saturday. The suauner season shall commence at 12:00 midnight on June 1 and continue until 12:00 midnight on SeptengDer 30 in each year. The winter season shall commence at 12:00 midnight on October I of each year and continue until 12:00 midnight on May 31 of the foillowing year. C. Billing Demand The billing demand in any month shall be based on electric consumption indicated or recorded by instruments supplied, owned, and maintained by the City, at the City's e~/Dense, upon the customer's premises. Separate billing demand shall be deter~ined for the on-peak, mid-peak, and off-peak time periods. The billing demands for the on-peak, mid-peak and off-peak time periods shall be the maximum rate of consu~tion of electric energy measured in any 30-minute interval during the monthly billing period. (Continued) ISSUED BY Ed A~}y. an Effective 01-01-92 By Resolution No. 91R- Dated General fVianager Superceding Resolution No. 90R-349 Dated3Zg-I 1-90 ~ :: :'e~ F~nxnc:~u Seduces A?,'D REGLl. ATIONS ~,nane~m. CA 02'305 Page SCHEDULE NO. PA POWER-AGRICULTIJRJ%L APPLIC-kBILITY Applicability to power service for general agricultural purposes, or for general water or sewerage pumping. P-~TE {24} Per Meter Service Charge: Per Month Two horsepower and over of connected lead, per horsepower .............................................. $1.t0 $1.20 Energy Charge (to be added to Service Charge): All kwh, per kwh ........................................ 7.7~¢ 7.75¢ Minimum Charge: The monthly minimum charge shall be the monthly Service Charge. P~ATE (23) Applicable to water utility pumps which are being controlled to limit the electrical system peak demand. Per Meter Service Charge: Pgr MQn~h Two horsepower and over of connected lead, per horsepower .............................................. $ l.lO $1.20 Energy Charge {to be added to Service Charge): All kwh, per kwh ........................................ ~.52~ 7.05¢ Minimum Charge: The monthly minimum charge shall be the monthly Service Charge. SPECIAL CONDITIQN$ A. The rate applies to service rendered at 240 or 480 volts at the option of the consumer. 746 watts shall be equivalent to 1 HP. B. Whenever, upon test, any equipment is found to be delivering more than 125% of its capacity as indicated by its nameplate rating, the City may disregard the nameplate rating and base its charges upon the actual output as calculated from the test. C. Where the use of energy is .seasonal or intermittent, no adjustment will be made for a temporary reduction of connected lead. Any customer who resumes service on such connected lead within 12 months must pay all charges that would have been billed had service been continuous. D. Power Cost Adjustment: The rates above are subject to adjustment as provided for in Schedule pCA. The applicable power cost adjustment billing factor set forth therein will be applied to all kilowatt-hours billed under this schedule. ISSUED BY Ed Aghjayan Effective 01-01-92 By Resolution No. 91R- Dated General Manager Superceding Resolution No. 90R-271 Dated 0%24-90 &na~e~m, CA 92805 Page No :. SCHEDULE NO. MS MUNICIPAL SERVICE APPLICABILITY Applicable to single or three phase service where the City of Anaheim operates and maintains the electrical equipment. PATE (lS) All kwh per meter per month ................ ~.~9~ 8.91¢ P~ATE (17) - Applicable to water utility booster pumps which are being controlled to limit the electrical system peak demand. All kwh per meter per month ................ 7.27~ 8.32¢ SPECIAL CONDITIONS A. Power Cost Adjustment: The rates above are subject to adjustment as provided for in Schedule PCA. The applicable power cost adjustment billing factor set forth therein will be applied to all kilowatt-hours billed under this schedule. ISSUED BY Ed Aghjayan Effective 01-01-92 By Resolution No. 91R- Dated General Manager Superceding Resolution No. 90R-271 Dated 0%24-90 RULE NO. 11 DISCONTINUANCE AND RESTORATIQN OF SERVICE A. PAST DUE BILLS Bills rendered will be considered past due if not paid within 15 days after date of presentation. B. NONPAYMENT OF BILLS 1. When a bill for utility service has become past due and a 15-day discontinuance of service notice has been issued, and delivery of personal 48-hour notification, service may be discontinued if the bill is not paid within the time required by such notice. A charge will be assessed if personel 48-hour notification is delivered. Any customer who contests a bill, and has initiated a complaint or requested an investigation within 5 days of receiving said bill shall not have sel-vice discontinued for nonpayment during the pendency of an investigation by the City of such customer's dispute or complaint. Services shall not be discontinued for nonpayment for any customer complying with a~ amortization agreement entered into with the City, provided the customer also keeps current the account for utility services as charges accrue in each subsequent billing period. If a customer fails to comply with an amortization agreement, the City will give a 7-day discontinuance of service notice before discontinuing services, but such notice shall not entitle the customer to further investigation by the City. 2. Utility services to a domestic customer will not be discontinued for non-payment when the customer has established to the satisfaction of the City that such termination would be especially dangerous to the health of the customer or a full time resident of the customer's household. Certification from a licensed physician, public health nurse, or a social worker may be required by the City. The City shall make available to customers, upon request, information regarding agencies and/or organizations that may provide financial assistance. 3. A customer's service may be discontinued for nonpayment of a bill for service previously rendered him at any location served by the Utility provided such bill is not paid within 15 days after presentation of a notice that present service will be discontinued for nonpayment of such bill for prior service. However, domestic service will not be discontinued because of nonpayment of bills for other classes of service. ISSUED BY (Continued) Ed Aghjayan Effective 01-01-92 By Resolution No. 91R- Dated General Manager Superceding Resolution No. 90R-271 Dated Q7-24-9Q ~na~eirn. CA 92805 Page No ~':~ : RULE NO. 15.0 LINE EXTENSIONS Extensions of distribution lines of standard voltages (12kv or lso~ below) necessary to furnish permanent electric service to applicants will be made by the Utility in accordance with the following provisions: A. GENERAL The Utility will construct, own, operate and maintain lines only along public streets, roads and highways which the Utility has the legal right to occupy, and on p~blic lands and private property across which rights of way satisfactory to the Utility may be obtained without cost or condemnation by the Utility. B. OVERREAD EXTENSIONS TO INDIVIDUAL APPLICANTS FOR SERVICE 1. Except for those instances where the customer requests special facilities, the Utility will install, own and maintain the necessary transformers, meters, and service wires in accordance with Rule No. 16. 2. ~pccial ~acilitics. Under this rule thc Utility shall install only ~hooc facilities which it deems arc ncecsoaz%- to rcndcr ocrvicc in accordancc ~lith the tariff ochcdulco. Whcrc thc applicant rcqucots facilitics which arc in addition to, or in substitution for, thc ot~-~dard f~ili~iee which ~hc Utility Ke~,..ally weuld install, the c~ctra costs thereef shall bc paid4~y ~hc applicant. 2. Where impractical to serve underground, and with special permission from the Public Utilities ~enerel Manager, overhead line extensions required to serve new developments shall be paid for by the applicant. The applicant shall be responsible for all costs to install said line, including preparation of plans, specifications and inspections. Where a line extension serves more than one customer, the cost of the line extension shall be borne by those persons benefitting from said line extension. Exceptions may be made at the discretion of the Public Utilities ~neral Manager. Group of Applicants a. Where mutually agreed upon by the Utility and the original applicant(s) and where the installation of an underground trunsform~tion point (a single transformer or transformer hank) will be required, all applicants to receive underground service fro~ the transformation point will be considered as a group for the purpose of this rule. · . Each applicant's share of the cost of the underground line extension shall be the sum of the amounts determined in Sections B.2 divided by the number of applicants. C. OVERREAD EXTENSIONS TO SERVE SUBDIVISIONS OR TRACTS, HOUSING PROJECTS, AND MULTIFAMILY DWELLINGS 1. Not applicable to line extensions within a new single family and/or multifamily residential subdivision of five or more lots (subdivision) ~nd in a or new residential developments consisting of five or more dwelling units in two or more buildings located on a single parcel of land (development) unless a master plan, preliminary map or tentative map has been filed for the subdivision or development with the City of A~aheim Planning Commission on or prior to May 5, 1970, and where an agreement has been entered into with the Utility for electric service prior to May 9, 1972. ISSUED BY (Continued) Ed Aghjayan Effectiv~ 01~1-92 By Resolution No. 91R- Dated Gener~ Manager Superseding Resolution No. 71R478 Dated 10-26-71 {n.~etm. ('A ~2805 Page No ~, :5.2 RULE NO. 15.0 LINE EXTENSIONS (Continued) C. OVERHEAD EXTENSIONS TO SERVE SUBDIVISIONS OR TPJ~CTS, HOUSING PROJECTS, AND MULTIFAMILY DWELLINGS (continued) 2. Extensions to serve real estate subdivisions will be made in accordance ~ with Section B hereof. D. UNDERGROUND EXTENSIONS 1. Conoral. Undcrground linc cxtcnsionc will bc madc only whcrc mutually agrccd upon by thc Utility and thc applicant, cxccpt in tho0c arcso whore thc Utility maintaint or dcoircc to ~alntain undcrground distribution facilities for itc opcrating convcni=ncc or in compliancc with applicablc law0, ordinancc, or similar rcquircmcntc of publlc authoritico o/%d thc City Council. 1. General. The City of ~u%aheim Public Utilities Department, by authority of the City Council, has declared itself an underground utility. Therefore, all new line extensions, up to 69kv, shall be underground, except in those areas where it is impractical to build underground lines, as determined by the Public Utilities Department, and approved by the General ~dana~er. 2. Utility-Installed Extensions to Serve Individuals. Nozq~,,ally undcrgro~nd cMtcnoiono w~11 bc inctailed, owned and maintaincd by thc Utility providcd tho applicant payc in advancc a nonrcfundablc sum ao dctcrmincd by thc Public Utilitics Conoral a. The applicant shell provide all substructures, including all conduit, manholes and vaults necessary for an underground electrical distribution syste~, and shall pay to the City of Anaheim, Publio Utilities Department, ~he cost of all labor and materials, including, but not limited to, cables and devices necessary for the installation of said underground system, and the cost for the preparation of plans, specifications and inspection of said system. b. Underground service will be installed and maintained as provided in Rule NO. 16. c. Group of Applicants. 1. Where mutually agreed upon by the Utility and the original applicant(s) and where the installation of an underground transformation point (a single transformer or transformer bank) will be required, all applicants to receive underground service from the transformation point will be considered as a group for the purpose of this rule. 2. Each applicant's share of the cost of the underground line extension shall be the sum of the amounts determined in Sections D.2.a. divided by the number of applicants. (Continued) ISSUED BY Ed Aghjayan Effective 01-01-92 By Resolution No. 91R- Dated General Manager Superceding Resolution No. 82R-534 Dated 11-02-82 I !;J[r!es Fmanc~&l Serx tce~ .-M'NI) REGL'LAI'IONS An~e~rn. C.-X 92805 P~ge No RULE NO. 15.1 UNDERGROUND EXTENSIONS WITHIN NEW RESIDENTIAL SUBDIVISIONS (Continued) B. INSTALLATION (Continued) ~ 4. Single phase underground line extensions will be installed, owned and maintained by the Utility provided the developer, subdivider or other customers requesting the extension pays before start of construction the nonrefundable sum as determined by the Utility based upon: a. The diffarcnco between thc c~tima~cd installed cost of tho underground oys~cm to oc~vc thc dcvclopment and a comparablc ovcrhcad oyotcm or a. All costs ~or labor and matsrial necessary ~or the installation of said underground system, and the preparation of plans, specifications and inspections ~or said system. b. A unit price per lot of dwelling unit as established in ~ar&~raph B %a above Rule 24 based upon historical cost adjusted annually. -~ C. SPECIAL CONDITIONS 1. Special Situations Special conditions of voltage, load, service, facilities and related matters applicable to the Rules and Regulations not expressly covered, shall be resolved by the Public Utilities General Manager. 2. Exceptional Cases In unusual circumstances, when the application of these rules appears impractical or unjust, developer may refer the matter to the Public Utilities General Manager for special ruling or for the approval of special conditions which are agreed upon prior to commencing construction. If the matter is not satisfactorily resolved with the Public Utilities General Manager! the developer may petition the City Council for final determination. ISSUED BY Ed Aghjayan Effective 01-01-92 By Resolution No. 91R- Dated General Manager Superceding Resolution No. 82R-534 Dated 11-02-82 I. ;:: es ? :w.'~c:a~ 5cr'. :ces A_~,I:) REGLLATION5 \n~e~m. CA ~£S05 Page No 3.15.2.1 RULE NO. 15.2 UNDERGROUND ~XTENSIONS WITHIN NEW COM~RCIAL A/fD INDUSTRIAL DEVeLOPMeNTS Extension of underground distribution lines at available standard voltages necessary to furnish permanent electric service within a new commercial or industrial development on a single parcel or on two or more contiguous parcels of land will be made by the Utility in accordance with the following provisions: A. GENEP. A~ The Utility will construct, own, operate, and maintain underground lines only along public streets, roads, and highways which the Utility has the legal right to occupy, and on public lands end private property across which rights of way and easements satisfactory to the Utility may be obtained without cost or condemnation by the Utility. B. INSTALLATION 1. The developer of the commercial or industrial development will, in accordance with the Utilities specifications: a. Perform all necessary trenching and backfilling, including furnishing of any imported backfill material ~equired. b. Furnish end install the underground duct system (including necessary conduits, concrete pads, ducts, manholes, vaults, and service lateral ducts) necessary to serve the development in accordance with the City's Utility specifications. o. Upon acceptance by the City's Utility, the developer will transfer ownership of such facilities to the City. Any additional underground facilities necessary to complete the extension shall be installed by the Utility at the developer's expense, in accordance with Rule 24. 2. Underground service will be installed and maintained as provided in Rule 16. The developer of the commercial or industrial development requesting the extension pays before the start of construction the nonrefundable sum, in accordance with Rule 24. C. SPECIAL CONDITIONS Special situations special conditions of voltage, load, service, facilities and related matters applicable to the Rates, Rules and Regulations not expressly covered, shall be resolved by the Public Utilities General Manager. ISSUED BY Ed Aghjayan Effective 01-01-92 By Resolution No. 91R- Dated__ Ge"~ral Manager Superceding Resolution No. Dated__ l':~;,t~es F;nanc~au Sen. ~c~s ~"',]) REGL~.TION$ -'UO ') ',n,zne~m Blvd &nxheim. CA 92805 Page No 3,:.9. RULE NO. 19 RATE STABILIZATION ACCOUNT (Continued) C. OPEBATION OF RATE STABILIZATION ACCOUNT 1. Within 15 days after the end of each month, the Stabilization Transfer will be calculated based on the recorded monthly kwh sales and existing Stabilization Rate. 2. Within 15 days after the end of each month Utilities Accounting takes appropriate action to move the Stabilization Transfer from the restricted cash of the Rate Stabilization Account to the unrestricted cash of the Electric Utility Operating Fund. 3. Within 15 days after the end of each month, the Public Utilities Department shall furnish to the city Manager, City Council and Public Utilities Board a report on the status of the RSA. D. RATE STABILIZATION ACCOUNT RATES The rate stabilization account rates, in cents per kilowatt hour, shall be shown in this section. Stabilization Effective Date Billin~ Rate Reference Rate Rate 10-16-85 8.904¢ 9.393¢ 0.489¢ 09-01-86 8.456¢ 8.778¢ 0.322¢ 01-06-88 7.970¢ 8.530¢ 0.560¢ 12-01-89 8.518¢ 8.518¢ 0.000¢ 08-01-90 8.832¢ 9.392¢ 0.560¢ 01-01-92 9.140¢ 9.700¢ 0.8600 ISSUED BY Ed Aghjayan Effective 01-01-92 By Resolution No. 91R- Dated General Manager Superceding Resolution No. 90R-271 Dated 07-~4-90 ::2:[:es F'n~nc[~ Set. :ces .~XI) REG[-L~TION'S R~LS ~O. 20 REPLACEMENT OF OVERHEAD WITH UNDERGROUND DISTRIB~ION ~ C~T~SMISSZCN FACILITIES UP TO 69kV A. The Utility will, at its e~ense, replace its existing overhead distribution and mubtransmission facilities with underground distribution and ~ubtransmission facilities up to 69kV along public streets and roads, and on public lands and private proper~y across which rights-of-way sa~isfacto~ ~o the Utility have been obtained or may be obtained without cost of conde~ation, by the Utility, provided that: 1. The City Council of the City of ~eim in which such distribution and subtransmission facilities up to 69kV are and will be located has: a. Dete~ined, after consultation with the Utility and after holding public hearings on the s~ject, that such ~dergro~ding is in the general public interest for one or more of the following reasons: (1) Such undergro~ding will avoid or eliminate an unusually hea~ concentration of overhead distribution and subtr~smission facilities up to 69kV; (2) Said street or road or right-of-way is extensively used by the general p~lic ~d carries a hea~ vol~e of pedestrian or vehicular traffic; Said street or road or right-of-way adjoins or passes through a civic area or p~lic recreation area or an area of ~usual scenic interest to the general p~lic. b. Adopted an or, in,co a resolution creating ~ undergro~d district in the area in which both ~he existing ~d new facilities are and will be located retiring, ~on~ other things, (1) that all existing overhead co~unication, electric distribution and g'~tr~smission facilities up to 69kV ,and CA~ in such district shall be removed, ~d (2) that each property o~ers se~ed from such electric overhead distribution facilities shall ..... ~=- in accord~ce with the Utility's ~les for ~dergro~d service, make all electrical facility ch~ges on his their premises necessa~ to receive se~ice from the ~dergro~d facilities of the Utility as soon as it is avail~le, ~d (3) authoriming that the Utility is authorized to discontinue its overhead se~ice. 2. The Utility will pay for no more than 100 feet of the customer's ~dergro~d semite lateral. For customers that re~ire more than 100 feet of semite laterml the Utility will ma~e an evaluation and the P~lic Utilities ~nerml ~nager' may at his discretion author&ze the additional cost of ~der~ro~ding such semite lateral. , (Continued) ISSUED BY Ed Aghjayan Effective 01-01-92 By Resolution No. 91R- Dated__ General Manager Superceding Resolution No. 90R-27I Dated 0%24-90 I ::[[ue~ F:na~c~ Ser~tces ~.'~T~ R~GLl,%TIONS -'00 5 A. na~e~m Blxd ',na~etrn. CA ~)-80_ Page No · 3.::.; RULE NO. 20 REPLACEMENT OF OVERHEAD WITH UNDERGROUND DISTRIBUTION AND CURTRANSMISSION FACILITIES UP TO 69kV IContinued) ~ B. (Continued) c. Paid a nonrefundable sum equal to the excess, if any, of the estimated costs (exclusive of transformers, meters and services), of completing the underground system and building a new equivalent overhead system. 3. The area to be undergrounded includes both sides of a street for at least one block or 600 feet, whichever is the lesser, and all existing overhead communication and electric distribution and cubtransmission facilities up to 69kv within the area will be removed. C. In circumstances other than those covered by A. or B. above, where mutually agreed upon by the Utility and an applicant, overhead distribution and u'~transmission facilities up to 69k~ may be replaced with underground distribution facilities, provided the applicant requesting the change pays, ~ in advance, a nonrefundable sum equal to the estimated cost of the underground facilities less the estimated net salvage velue and depreciation of the replaced overhead facilities. Underground services will be installed and maintained as provided in the Utility's rules applicable thereto· D. The term "underground distribution system" means an electric distribution system with all -~irc~ cables installed underground except those ~ircs conductors in surface-mounted equipment enclosures. E. The term "underground ='~transmission ~ystem" means a ~gk'; =ubtransmission system up to 69kV with all ~irco cables installed underground except those -Jircs conductors in surface-mounted equipment enclosures, ISSUED BY Ed Aghjayan Effective 01-01-92 By Resolution No. 91R- Dated__ General Manager Superceding Resolution No. 90R-271 Dated 7-_9._~-9 $ ~n~etm Bkd ~n~etm, CA g_~O_ P~eNo ~ :o.: ~U~g ~0. gO REPLACEMENT OF OVERHEAD WITH UNDERGROUND DISTRIBUTION A/TD SL~TP~kNSMISSION FACILITIES UP TO 69kV (Continued) A. (Continued) 3. The annual budgeted amount for undergrounding within the City of Anaheim may be allocated by the City Council upon recommendation of the Public Utilities General Manager. The undergrounding extends for a minimum distance of one block or 600 feet, whichever is the lesser. B. In circumstances other than those covered by A. above, the Utility will replace its existing overhead distribution and subtransmission facilities up to 69kV with underground facilities along public streets, and roads or other locations mutually agreed upon when requested by an applicant or applicants where all of the following conditions are met: 1. a. All property owners served from the overhead facilities to be removed first agree in writing to perform the wiring changes on their premises so that service may be furnished from the underground distribution system in accordance with the Utility's rules and that the Utility may discontinue its overhead service upon completion of the underground facilities, or b. Suitable legislation is in effect requiring such property owners to make such necessary wiring changes and authorizing the Utility to discontinue its overhead service. 2. The applicant has: a. Furnished and installed the pads and vaults for transformers and associated equipment, conduits, ducts, boxes, pole bases and performed other work related to structures a~d substructures including breaking of pavement, trenching, backfilling, and repaving required in corunection with the installation of the underground system, all in accordance with Utility's specifications, or, in lieu thereof, paid the Utility to do so; end b. Transferred ownership of such facilities, in good condition, to the Utility; and Continued) ISSU£D BY Ed Aghjayan Effective 01-01-92 By Resolution No. 91R- Dated__ General Manager Superceding Resolution No. 90R-271 Dated RULE NO. 23 CUSTOMER SERVICE FEES ADDlicabilitv Applicable to all classes of service as provided in accordance with the Electric Rules and Regulations. Rule Number Description Fee Amount 3 Service Establishment Charge $ 5.00 3 Service Establishment Charge- Participating Apt. Owners $ 2.50 3 Service Establishment Charge/Additional $ 5.00 7 Minimum Deposit $ 85.00 9 Returned Check Charge In accordance with Anaheim's Municipal Code 11 Collection Fee $ 2.00 $7.00 11 Special 48-Hour Phone Notification $ 1.00 11 Special 48-Hour Field Notification $ 7.00 11 Recormection Charge $ 12.00 $20.00 11 Reconnection Charge/Same Day $ I?.00 $40.00 11 Damaged Steel Locking Ring $ 0.00 $8.50 11 Damaged Aluminum Meter Ring $ 3.00 11 Replace Damaged 1~ Meter $ ?5.00 $80.00 11 Replace Damaged 1~ Meter (after hours) $110.005120.00 11 Replace Damaged 1~ Meter w/Demand $205.005215.00 11 Replace Damaged 1~ Meter w/Demand (after hour~) 11 Replace Damaged 3~ Meter TLTe &Ysrs~dal 17 Meter Test 1~ - Shop ~ 27.00 $30.00 17 Meter Test 1~ - Field $ 52.00 $55.00 17 Meter Test - 3~ ~ &M~t~r~al ISSUED BY Ed Aghjayan Effective 01-01-92 By Resolution No. ~)IP-- Dated General Manager Superceding Resolution No. 90R-271 Dated Q7-~4-90 ELECTRIC DIVISION CFJiRGES The following charges, fees and bonds are to be assesssod, as appropriate, from builders, developers and customers requiring the Utility's services or rolocarlene. I. SUBDIVISIONS - RESIDENTIAL ~m~.~ A. Chapter 17.08.450 of Municipal Code requires developers to post a Subdivision and Tract Improvement Bond for Public Improvements. The estimated cost for electrical underground utilities: $4,500 Der acre. B. Rule 15.1, Underground Extension Within New Residental Subdivision, of the Electrical Rates, Rules and Regulations provides that the developer, subdivider or other customers requesting extensions within new residential subdivisions shall pay, before start of construction, a non-refundable sum as determined by the Utility based upon: 1. All costs for labor and material for the installation of said underground system, and the preparation of plans, specifications and inspections for said system. 2. By a unit price per lot or dwelling unit, as established in paragraph B.4,b of Rule 15.1, based upon historical costs adjusted annually. In accordance with these Rules and Regulations, the following charges are established: a. $1,350 per lot for lots in R-1 subdivision where known lots are not larger than 7,200 square feet. If · subdivision or development contains lots different than this, the per lot charge will be established by the Electrical Engineering Division in accordance with Rule 15.1.A. b. $1,485 per lot for lots in R-10,000 and R-22,000 subdivisions where lots are 10,000 and 22,000 square feet. $3,642 per single family unit or residence where the unit or residence requires an individual transformer. d. $231 per unit for an apartment complex development where service will be provided from an existing transformer. e. $242 per unit for an apartment complexe development where service will be provided from a new padmount transformer. f. $356 per unit for an apartment complex development where service will be provided from a new overhead transformer. C. These unit prices retain the requirements as stated in Rule 15.1 that require the developer to perform necessary trenching and backfilling with related material as required to complete the underground facilities specified by the Eleotricel Utility. These charges include the inspection and design fee as required by Section 17.08.%40 of the Municipal Code. D. If construction of the subdivision underground utility facilities has not begun within 12 months of the date of the fee payment, the per lot fee shall be escalated by 10% per lot and paid by the developer before construction proceode. E. These unit costs are reviewed and updated on an annual basis to reflect current expenses incurred by the City for installation of this type of underground facility. ISSUED BY (continued) Ed Aghjayan Effective 0l~1-92 By Resolution No. 91R- Dated Ganertl Manager Superceding Resolution No. Dated~ ' ::,:;cs F:::~a~c;a~ Ser~ ,ces ,~N~ REGL1-ATIONS ~n~e~m. CA 42805 Page No 3.2~.2 RULE NO. 24 ELECTRIC DIVISION C~GES (continued) II. COMMERCIAL/INDUSTRIAL SERVICE FEES Applicants requesting new commercial/industrial service shall Day, before start of construction, the following charges: 1. $1,400 for an underground service fed from an existing transformer. 2. $1,900 for an underground service fed from a new overhead transformer. 3. $4,032 for an underground service fed from a new padmount transformer. III. ENGINEERING FEE FOR REDESIGN If a contractor/builder/developer requests the Utility to revise, redesi~n, or change the Electrical Utility system design for a project after final approval by the Planning Commission, end such request requires duplication of engineering effort and a reassignment of priorities to accommodate his construction schedule, · fee shall be charged. Unless specific circumstances or magnitude of the project indicate a special cost estimate is necessary to recover all the City's exloenses of labor, overhead, burdens and printing expense, the engineering fee shall be $500. IV. TEMPOP, ARY POWER AND SERVICE CHARGES Applicants requesting temporary electrical service shall pay, before start of construction, the following charges: A. Single phase meter & overhead service $260.00 B. Span of single phase, three-wire secondary, plus meter & service $710.00 C. Single phase overhead transformer plus meter & service $1,750.00 D. Single phase underground meter & service using existing connections at pull box $150.00 E. Single phase underground meter & service using new ~ connections at pull box $450.00 F. Three phase service from new overhead transformer $3,500.00 G. Three phase iervice from new padmount transformer $6,250.00 H. Thrie phase service from new padmount transformer and riser $7,760.00 I. Any temDor&ry Job that appears unusually complicated or difficult, as determined by the Electric Utility, will be charged on an individual estimated basis to ricovet all costs of labor and expenie including depreciation and loss of selvage incurred by the City in making such installation. (continued) ISSUED BY Ed Aghjayan Effective 01-01-92 B~ Resolution No. 9[R- Dated General Manager Superceding Resolution No.~__Dated I : ~;;;e, F:nanc:.u Set,. ;ce~ A-N~D REGI.~,ATION$ .200 '~ ~,n,metm BI',J ~n~e~m. CA ~2805 P~ge No 3.24.3 RUL~ NO. 24 ELEC~IC DIVISION ~G~S (continued) V. STREET LIOHTS 1. Chapter 18.04.080.030 of the Municipal Coda requites the installation of ~' street lighting facilities or pas~ment of street lighting per front foot fee. The ordinanca requires all new developments to install the street lighting facilities required in accordance with th9 official street lighting standards on file in the Public Utilities Department. Front foot fees are only collected when street lighting facilities are existing and if the property has not previously paid a street light front foot fee. The front foot fee for street lighting is $6.00 Der front foot (Ordinance 4017 - June 5, 1979). 2 Developare/builders/contractors are required to poet a performance bond with tha City to assure installation of public improvements. The bond required for the street lighting facilities, which is a part of the Public Improvements Bond deposited with the Raal Property Section of the Engineering division, Public Works Department, is determined on a per ~ front foot basis for abutting dedicated streets or highways at S32.00 Der front foot; minimum $3,200.00 bond. 3. Private Streets - Public Works department, Enginaering Division Standard Detail No. 122, Note 10-A-4, states: 'Lighting adequate for pedestrian and vehicle safety and sufficient to minimize police problems as approved' by the Public Utilities ~enaral Manager shall ba provided.' It is the Public Utilitias Department's policy that street lighting on private straets ba in accordanca with IES street lighting recommendations. The luminaire and pole should be as required by the devaloper and not the City's street lighting unit. Street lighting on private street shall be matered in accordance with the Utilities Rates, Rules and Regulations and service requirements. If a private street is approved for dedication to the City as a public street, the street lights shall be installed per City Standards and Specifications by the owner and the circuit re-wired for City sarvioa prior to acceptance of dedication by the City. ISSUED BY Ed Aghjayan Effective 01-01-92 By Resolution No. 9[g' Dated General Manager Superceding Resolution No. Dated