93-146 RESOLUTION NO. 93R-146
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
ANAHEIM ADOPTING THE DISNEYLAND RESORT
SPECIFIC PLAN NO. 92-1 (INCLUDING ZONING AND
DEVELOPMENT STANDARDS, A DESIGN PLAN AND
GUIDELINES, AND A PUBLIC FACILITIES PLAN)
(SP92-1)
WHEREAS, pursuant to Chapter 18.93 of the Anaheim
Municipal Code, The Walt Disney Company submitted an application
dated October 30, 1992, for City consideration of adoption of The
Disneyland Resort Specific Plan No. 92-1 (including Zoning and
Development Standards, a Design Plan and Guidelines, and a Public
Facilities Plan) for the portion of the project area owned by The
Walt Disney Company and a request dated October 30, 1992, as
amended on March 15, 1993, that the Planning Commission initiate
Specific Plan No. 92-1 for the portions of the project area not
owned by The Walt Disney Company; and
WHEREAS, on March 22, 1993, the Planning Commission by
Resolution No. PC93-39 initiated Specific Plan No. 92-1 for the
portions of the project area not under the ownership of The Walt
Disney Company; and
WHEREAS, The Disneyland Resort project area encompasses
approximately 490 acres, plus approximately 11 acres of right-of-
way improvements generally located within the City of Anaheim's
Commercial Recreation Area adjacent to and southwest of the Santa
Ana Freeway (I-5) and accessible from Harbor Boulevard, Ball
Road, Freedman Way, Katella Avenue, West Street, Orangewood
Avenue, Haster Street and Walnut Street, more particularly
described in Attachment 1 of this resolution; and.
WHEREAS, on and off-site intersection improvements at
the following locations and identified in Draft EIR No. 311 are
recommended conditions of approval for the project:
1. Ball Road at Euclid Street, Walnut Street, West
Street, and Anaheim Boulevard;
2. Cerritos Avenue at Walnut Street and West Street;
3. Katella Avenue at Euclid Street, Walnut Street,
West Street, Harbor Boulevard, Clementine Street
and Haster Street;
4. Freedman Way at Harbor Boulevard and Clementine
Street; and
5. Chapman Avenue at Harbor Boulevard
WHEREAS, the Anaheim City Planning Commission did hold
a public hearing upon said application, notice of said public
hearing having been duly given as required by law; and
WHEREAS, said Commission, after due inspection,
investigation and study made by itself and in its behalf, and
after due consideration of all evidence and reports offered at
said hearing, did adopt its Resolution No. PC93-59 recommending
to the City Council the adoption of The Disneyland Resort
Specific Plan No. 92-1; and
WHEREAS, thereafter, within the time prescribed by law,
the City Council caused the review of said Planning Commission
action at a duly noticed public hearing; and
WHEREAS, at the time and place fixed for said public
hearing, the City Council did duly hold and conduct such hearing
and did give all persons interested therein an opportunity to be
heard and did receive evidence and reports, and did consider the
same; and
WHEREAS, the City Council did approve a motion to
remove a parcel of approximately 56.48 acres from the boundaries
of the proposed Specific Plan; and
WHEREAS, the City Council after careful consideration
of the recommendations and findings of the City Planning
Commission set forth in Planning Commission Resolution No. PC93-
59, and all evidence and reports offered at said hearing, DOES
HEREBY FIND:
1.0 THE DISNEYLAND RESORT SPECIFIC PLaN WILL GENERATE
SUBSTANTIAL PUBLIC B~NEFITS AND IS IN THE PUBLIC
INTEREST.
1.1 Revenues for City. The Disneyland Resort will generate
substantial beneficial fiscal impacts, as indicated in the public
testimony before the Planning Commission and City Council and in
the Anaheim Commercial Recreation Area Fiscal Impact Report,
prepared by Economic and Planning Studies (April 1993). New
hotel, sales and property taxes will generate tens of millions of
dollars in revenues to the City of Anaheim.
Preservation of KeY Industries of Statewide Importance.
The Disneyland Resort will improve and enhance the tourist
industry, an industry of immense importance at the local,
regional and statewide levels. The Anaheim Area Visitor Center
and Convention Bureau, which tracks the County's tourists,
estimated that 37.7 million people visited the area's theme parks
and beaches in 1992. The Bureau estimated that the visitors
spent $4.7 billion in Orange County in 1992. The Orange County
region, and the City of Anaheim, benefit greatly from these
revenues from tourism. In 1992, the Governor's Council on
California Competitiveness published its report, "California's
Jobs and Future." The Report identified the tourism industry as
a key industry in the State of California and urged
"extraordinary efforts" be made to preserve and enhance the
competitiveness of such key industries.
The present Disneyland theme park has been an important
and vital source of jobs, revenue and prestige for the City of
Anaheim and the State. However, to maintain its vital role in
the economy, it is necessary to allow the theme park and
surrounding uses to evolve to meet current market demands for
newer, more integrated resorts geared toward longer visitor
stays, as would be accomplished by The Disneyland Resort.
1.3 Increased Economic Activity. Environmental Impact
Report No. 311 indicates The Disneyland Resort indirectly will
increase the demand for surrounding retail, restaurant service
and hotel rooms. For example, The Disneyland Resort is estimated
to induce demand for additional hotel rooms within the
surrounding area. Additionally, many other businesses will
benefit from opportunities such as construction of The Disneyland
Resort and provision of additional visitor services.
1.4 Jobs for Area Residents. The Disneyland Resort will
directly create thousands of new jobs, enhancing Disney's
position as the largest employer in Anaheim. The EIR estimates
that The Disneyland Resort will create a total of 11,848 net
direct jobs, and thousands of construction jobs. The Disneyland
Resort also will create thousands of additional indirect jobs in
visitor-serving businesses such as hotels, motels, restaurants,
retail shops and transportation.
1.5 Visual Enhancement and Revitalization.
Landscaping and urban design features of The Disneyland
Resort Specific Plan will unify and upgrade the appearance of the
Project area, and substantially improve the aesthetic quality of
the Commercial Recreation Area. The perimeter of The Disneyland
Resort will be landscaped utilizing a series of greenbelt
parkways and screening foliage that creates a public park-like
atmosphere. Landscaped parkways and medians will be incorporated
into Katella Avenue, Harbor Boulevard, West Street/Disneyland
Drive and Walnut Street.
1.6 Improvements to Transportation and Access to Resort.
The Specific Plan provides a Vehicular Circulation Plan
and Pedestrian Circulation Plan. A number of improvements to the
existing transportation and circulation system have been
incorporated into the project design to enhance access to and
egress from the Project area, and to provide convenient and
pedestrian-oriented circulation within the Project area. These
improvements will remove some of the current Disneyland traffic
from the local streets. Impacts to local streets will be
minimized by moving parking facilities to locations more
convenient to I-5 and by providing freeway on/off ramps that
directly access the parking facilities. The public parking
facilities and pedestrian circulation systems will minimize trip
generation within the Commercial Recreation Area. These
improvements will benefit all users of the transportation system
and improve overall levels of service in the area.
The Disneyland Resort will provide an extensive
internal pedestrian circulation system, including landscaped
walkways, and electrical conveyance systems. The project will
accommodate a potential connection to the Orange County Fixed
Guideway project and a potential pedestrian bridge over Katella
Avenue.
1.7 Publio Park~n~ F&cilltles.
Two new public parking facilities will be constructed
at opposite sides of The Disneyland Resort Specific Plan area
adjacent to I-5 to receive traffic from I-5 and to eliminate such
traffic from local streets within the Commercial Recreation Area.
These public parking facilities will provide public parking for
The Disneyland Resort and the Anaheim Convention Center.
1.8 Air Oualit¥ Proteotion.
Completion of the Disneyland Resort Project will result
in significant decreases in vehicle miles travelled (VMT), both
by project cast and theme park guests who visit from outside
Southern California. In addition, Disney has committed to target
a 1.5 average vehicle ridership (AVR) for all cast trips, going
well beyond the requirements of the South Coast Air Quality
Management District's Regulation XV.
Provide Affordable Housing.
The applicant will build or preserve, or cause to be
built or preserved, 500 affordable housing units in the City of
Anaheim in connection with the development of the Project. The
housing units shall be preserved, constructed or under
construction prior to the opening of the WESTCOT Theme Park. The
City shall cooperate with the applicant in securing financing,
identifying sites and approving entitlements. The applicant
shall consult with the City prior to entering into binding
agreements to build or preserve, or cause to be built or
preserved, such housing units in the City. The applicant shall
give priority to the preservation of existing housing units in
deteriorating multi-family areas of the City. The applicant
shall give priority to family units of 2 and 3 bedrooms with a
goal of 50% of the units to be 2 or more bedrooms.
The applicant shall have discretion to select the
particular projects in which it will participate. Affordable
housing units required as part of other projects' conditions of
approval shall not be eligible for credit. A minimum of 40% of
the units shall serve "very low income households" (as defined in
Title 25 of the California Administration Code, Section 6926).
The remainder of the units will serve "low income households."
4
1.10 Imgrove Educational Pro,rams.
The Disneyland Resort will continue a series of
educational programs in cooperation with the local community and
regional agencies and organizations.
2.0 THE SPECIFIC PLaN PROPERTY H~S UNIOUE SITE
CHARACTERISTICS WHICH ~RE ENHANCED BY SPECIAL L~ND USE
AND DEVELOPMENT STANDARDS. Anaheim Municipal Code
S 18.93.070(1).
2.1 The Specific Plan Area is Part of the Con~eroial
Recreation Area.
The City of Anaheim's Commercial Recreation Area is an
approximately 1,040-acre area (increased to approximately 1,046
acres in connection with General Plan Amendment No. 331)
designated for Commercial Recreation uses in the city of
Anahelm's General Plan, a planning designation which permits
primarily recreation, tourist, convention and other visitor-
serving uses. The Commercial Recreation Area is generally
located southwest of I-5 between Ball Road and Orangewood Avenue.
There is another area which surrounds the Anaheim Stadium which
is also designated Commercial Recreation but is not referred to
in this EIR as part of the Commercial Recreation Area.
Existing land uses in the Commercial Recreation Area
surrounding the existing Disneyland theme park include the
Anaheim Convention Center and a number of hotel, motel,
commercial and retail establishments. In 1989, the city of
Anaheim initiated the Commercial Recreation Area Enhancement
Program and Transportation/Land Use Strategy Plan. The goal of
the city's efforts was to address the need for "visual
enhancement" and infrastructure improvements in the Commercial
Recreation Area. Specifically, the Commercial Recreation Area
Enhancement Program's goal was to comprehensively address
signage, landscaping and other land use and site development
issues in the Commercial Recreation Area. The
Transportation/Land Use Strategy Plan's goal was to assess
existing and future transportation conditions and recommend
improvements commensurate with land use intensification
projections over the next 20 years. In 1990, the Anaheim City
Council adopted a revised Commercial Recreation Zoning Ordinance
and established Design Guidelines for the Commercial Recreation
Area. The CR Zone currently regulates the C-R Area.
It was within this planning context that The Walt
Disney Company announced plans for The Disneyland Resort in 1991,
the project analyzed in this EIR. The proposed Disneyland Resort
Specific Plan encompasses approximately 490 acres of the City's
Commercial Recreation Area. The Specific Plan facilitates the
development of a world-class destination resort by consolidating
the Disneyland theme parks, hotels and other visitor-serving
facilities in close proximity to each other. If the proposed
Disneyland Resort Specific Plan is not approved, the project site
will continue to be regulated by the CR Zone as it currently
exists or as it may be amended in the future.
The Specific Plan provides for the development of a
premier destination resort in the City's Commercial Recreation
Area. The site currently is comprised of the Disneyland theme
park, hotels and other commercial facilities, the Disneyland
theme park parking lot and agricultural land. The City
identified the Commercial Recreation Area as a priority growth
area in its 1990 Economic Development Strategic Plan. The
conversion of Disneyland from primarily a one-day visitor resort
into a world-class destination resort is consistent with the
city's stated vision for the Commercial Recreation Area.
The new Disneyland Resort will utilize the area in the
Commercial Recreation Area efficiently by constructing a second
theme park, the WESTCOT theme park on land presently occupied by
the Disneyland parking lot. Parking will be moved to a more
land-use efficient multi-level parking facility which will
benefit from convenient access to I-5.
The new Disneyland Resort represents a more efficient
use of Commercial Recreation Area land than the present use.
These improvements will enhance the value of the Commercial
Recreation Area as a whole, and will create synergistic benefits
with specific facilities within the area. The attractive and
desirable nature of the new Disneyland facility will ensure that
the Anaheim Commercial Recreation Area remains one of the
foremost commercial recreation attractions in the country.
Adjaoent Residentlal Land Uses will be Proteoted to the
Extent Feasible by The SDecifio Plan Development
The Specific Plan provides for the construction of
landscaped greenbelt parkways in setback buffer zones between the
perimeter of the resort and surrounding residential areas.
Building setbacks will create a buffer between the Specific Plan
development and surrounding residential areas. The setbacks next
to residential areas will be landscaped using techniques that
screen the new development from the residential areas. Streets
will be lined with trees, shrubs and other attractive landscaping
elements. The Specific Plan defines maximum heights for each
Specific Plan District based on the particular needs of the
District. In addition, maximum heights have been established for
most buildings at the required setbacks. A 2:1 sky exposure
plane height limit between the heights at the setback and the
maximum height has also been established. These height limits
increase the amount of sunlight available to the adjacent streets
or residential properties, reduce the apparent mass of structures
visible from adjacent streets or residential properties, and help
create a street environment more attractive to pedestrians.
6
Land Uses within the New Disneyland Resort will Enhance
the Present Disneyland Resort and will Employ State-of-
the-Art Environmentally-Sound Technolo~ies
The new Disneyland Resort will retain the character and
strengths of the present theme park, while utilizing new
approaches and technologies which reflect present needs and
advances. The Specific Plan provides for the construction of an
elaborate transportation system within the project area.
Visitors will be transported between the parking facilities, the
theme parks and the hotel district by electrical conveyance
systems, with people mover or moving sidewalk systems and an
improved monorail system. In addition, the theme parks will be
oriented toward pedestrian use. The design features noted in EIR
311 will make the Resort a tremendous asset to the Anaheim
community.
THE SPECIFIC PLAN IE CONSISTENT WITH THE GOALS AND
POLICIES OF THE GENERAL PLAN AND WITH THE PURPOSES,
STANDARDS, AND LAND USE GUIDELINES THEREIN. Anaheim
Municipal Code §§ 18.93.060 and 19.93.070(2)
The Disneyland Resort Specific Plan ("Specific Plan")
is consistent with the Anaheim General Plan ("General Plan") as
required by Anaheim Municipal Code Sections 18.93.060 and
18.93.070(2). This finding hereby incorporates Section 6.0
"General Plan Consistency" of the Specific Plan document, which
provides a goal-by-goal and policy-by-policy demonstration of
such consistency. The consistency of each relevant element, as
discussed in the Specific Plan, is summarized below.
3.1 General Communlt¥ Ob~eotives and Policies
The City of Anaheim General Plan is based upon
community-wide objectives including maintaining and enhancing
Anaheim's position as a regional, cultural, employment, tourist,
convention and recreation center, while maintaining and enhancing
the residential environment of the City's living areas, and the
City's infrastructure.
The Specific Plan is consistent with each relevant
General Plan element as discussed below. These community wide
objectives are maintained and enhanced by the Specific Plan as
discussed in Section 6.0 of the Specific Plan document.
3.2 Land Use Element Consistency
3.2.1 commercial Areas
The Commercial Areas section of the General Plan Land
Use Element is designed to maintain and enhance Anaheim's
position as a nationally recognized tourist center, to increase
tax yields and enhance the economic base of the community, and to
provide the community with well-designed, safe, and convenient
7
commercial locations. The Specific Plan promotes all of these
goals.
The Disneyland theme park has been a tremendous asset
to the city of Anaheim. The theme park has made Anaheim one of
the best-known tourist locations in the United States.
Accordingly, it has boosted the economic base of the surrounding
community. The Specific Plan provides for the conversion of
Disneyland into a premier destination resort. Presently, most
visitors to the park come as one-day-only visitors. The Specific
Plan provides for the construction of a second theme park (the
"WESTCOT theme park") on the area presently occupied by the
Disneyland parking lot, the renovation of the present theme park,
the construction of 4,600 rooms in a new hotel district and
potentially within the theme park district, and new public
parking facilities in close proximity to Interstate 5.
This expansion is made in response to the competitive
nature of modern recreational opportunities, and is planned to
keep Disneyland at the forefront in the tourism and recreational
markets. The new Disneyland Resort will become a family-oriented
destination resort that rivals any in the world.
The construction of The Disneyland Resort furthers the
City's General Plan goal to enhance the City of Anaheim's
position as a nationally recognized tourist center. In addition,
the conversion of Disneyland from a one-day tourist site to a
premier destination resort will enhance the economic base of the
community in keeping with the General Plan. Sales tax receipts
will increase accordingly--not only inside the theme parks, but
in surrounding businesses.
3.2.2 Community Services and Facilities
The Community Services and Facilities section of the
General Plan Land Use Element is designed to provide levels of
service that meet the community's needs for public safety and law
enforcement. The Specific Plan and the Disneyland Resort
Environmental Impact Report ("Environmental Impact Report")
promote these goals.
Anahsim's Police and Fire Departments have been
involved in reviewing the Specific Plan, and will also review
final site plans and building plans. The Specific Plan and the
EIR provides for expanded Disneyland fire and security
departments that will be able to serve the increased needs of the
larger resort. The expanded services will provide the resort,
and resort patrons, with the same level of service they have
enjoyed in the present theme park.
3.2.3 Infrastructure
The Infrastructure section of the General Plan Land Use
Element is designed to provide adequate water, electrical,
8
sanitary sewer, and storm drain systems to serve the community's
needs. The Specific Plan and the project design features and
mitigation measures identified in the Environmental Impact Report
promote these goals.
The Specific Plan and Environmental Impact Report
provide for modifications to the water, electrical, sanitary
sewer, and storm drain systems where present facilities will not
be sufficient to handle the expanded resort. Modifications will
assure area residents of receiving at least their present levels
of service.
3.3 Circulation Element Consistena¥
The General Plan Circulation Element is designed to
provide an efficient, economic, and well balanced transportation
system that enhances the appearance and quality of residential
and commercial areas. The Specific Plan, the project design
features and mitigation measures identified in the Environmental
Impact Report promote these goals.
The Specific Plan provides for efficient access to the
new Disneyland Resort by constructing public parking facilities
in close proximity to I-5, and by improving roads which move
visitors conveniently between I-5 and the public parking
facilities. The Specific Plan and related City programs provide
for the visual enhancement of area roads through landscaped
medians, streets lined with trees and other foliage, and
landscaped setback areas between the project and City streets.
The Specific Plan provides for the construction of
transportation facilities and systems serving the resort.
Visitors will be transported between the public parking
facilities and the parks by pedestrian ways or electrical
conveyance systems such as people mover/moving sidewalk systems.
Visitors may move between the hotel district and the parks on an
improved monorail system. These systems will provide efficient
and environmentally sound transportation around the parks.
In addition, the general public will benefit by an
extensive pedestrian circulation system constructed as part of
the project, and external systems of mass transit designed to
serve the area around the theme parks.
3.4 Environmental Resource and Management Element
consistency
The General Plan Environmental Resource and Management
Element is designed to provide the community with a full range of
parks and recreational facilities and programs, while encouraging
the retention of agricultural lands especially those in
agricultural preserves, where economically feasible. The
Specific Plan and the project design features and mitigation
measures identified in the Environmental Impact Report promote
9
these goals in view of the existing status of the agricultural
land.
The Specific Plan area is designated for Commercial
Recreation use in the General Plan and is therefore consistent
with the General Plan's contemplated uses of the property. The
Specific Plan provides for construction of a world-class
destination resort in the Commercial Recreation Area. In
addition, the Specific Plan provides for the construction of
landscaped areas, retail businesses and entertainment facilities
for public use, convenience and enjoyment.
All the prime agricultural land (24 acres) within the
Specific Plan area has been designated for Commercial Recreation
use in the General Plan. There are no agricultural lands
currently under Williamson Act contracts within the Specific Plan
area.
Safety and Selsmio Safety Element Consistshey
The General Plan Safety and Seismic Safety Element is
designed to provide for the preservation of life and property by
ensuring the most effective and economical use of all resources.
The Specific Plan and the project design features and mitigation
measures identified in the Environmental Impact Report promote
this goal.
The Specific Plan incorporates safety and disaster
planning measures which provide for the preservation of life and
property. The Specific Plan and Environmental Impact Report
identify mitigation measures to ensure adequate levels of service
to The Disneyland Resort.
Housinq Element Cons~steno¥
The General Plan Housing Element is designed to provide
City residents with affordable and quality housing, and safe,
attractive neighborhoods. The Specific Plan and the project
design features and mitigation measures identified in the
Environmental Impact Report promote these goals.
Construction of the new Disneyland Resort in the
Specific Plan Area is consistent with the designated land-uses
for that area under the General Plan. In connection with General
Plan Amendment No 331, a 5.7 acre portion of the Specific Plan
area is proposed to be redesignated from the Medium Density
Residential designation (permitting up to 36 dwelling units per
acre) to Commercial Recreation.
The Specific Plan provides for the construction of an
aesthetically pleasing landscaped greenbelt between the new
Disneyland Resort and all residential areas. This greenbelt will
include landscaped medians, tree-lined streets, and landscaped,
substantial setback areas between the streets and the perimeter
10
of The Disneyland Resort. In addition, the Specific Plan limits
building heights adjacent to residentially zoned property in
order to provide adjacent residential areas with attractive views
and to minimize views into residential properties. These
measures will significantly increase the attractiveness of areas
near the theme parks, and will create a landscaped buffer zone
between the resort and surrounding neighborhoods.
Noise Element Consisteno¥
The General Plan Noise Element is designed to encourage
the reduction of noise from all sources, and to protect noise
sensitive areas of the City. The Specific Plan and the project
design features and mitigation measures identified in the
Environmental Impact Report promote these goals.
The Specific Plan and project design features
identified in the Environmental Impact Report demonstrate a
sensitivity to noise-related issues. They provide for the
mitigation of noise effects from the Plan area so that the
development furthers the goals and policies of the General Plan.
3.8 ~rowth Management Element Consistency
3.8.1 Land Use
The Land Use section of the General Plan Growth
Management Element is designed to provide the City with a full
range of land uses, while creating land use strategies/incentives
to reduce vehicle miles, and preserving or enhancing existing
residential neighborhoods. The Specific Plan and the project
design features and mitigation measures identified in the
Environmental Impact Report promote these goals.
The Specific Plan area is located in the Commercial
Recreation Area, which is designated by the City of Anaheim as a
priority growth area. The improvement of the Specific Plan area
is consistent with this designation. The plan provides for
infrastructure improvements necessary to maintain and enhance the
current and desired levels of service. Since the Specific Plan
development is consistent with the General Plan land use
designation for the area, the development furthers the balance of
commercial, industrial and residential land uses required under
the General Plan.
The development includes construction of a pedestrian-
oriented environment consistent with the policies of this General
Plan Element. Visitors to the theme parks will use public
parking facilities convenient to I-5, and will be transported
between public parking facilities and theme parks on pedestrian
ways/people mover/moving sidewalks.
11
3.8.2 Community Services and Facilities
The Community Services and Facilities section of the
General Plan Growth Management Element is designed to ensure that
development impact on police, fire and school services are
assessed and necessary mitigation measures are identified to
achieve stated levels of service. The Specific Plan and
Environmental Impact Report promote these goals.
The Specific Plan and Environmental Impact Report
discuss the new development's impacts on police, fire and school
services, and propose mitigation measures that ensure that the
City's service standards be maintained. Mitigation measures are
provided to achieve the stated goals, policies and standards for
police and fire service and school facilities.
3.8.3 Infrastructure
The Infrastructure section of the General Plan Growth
Management Element is designed to promote the adequate assessment
of new development impacts on infrastructure, and the adoption of
appropriate mitigation measures. The Specific Plan and
Environmental Impact Report promote, and comply with, these
goals.
The Specific Plan, in conjunction with the
Environmental Impact Report, discusses impacts on the water
system, electrical facilities, sanitary sewer system, storm drain
system and flood control facilities. The Specific Plan and the
EIR mitigation measures will ensure that adequate infrastructure
improvements are provided to serve the project while avoiding
significant impacts to facilities and services.
3.8.4 cir~ulatlon
The Circulation section of the General Plan Growth
Management Element is designed to promote the reduction of
traffic congestion on city streets, the adequate assessment of
new development impacts, and the adoption of appropriate
mitigation measures. The Specific Plan and Environmental Impact
Report promote, and comply with, these goals.
The Specific Plan, in conjunction with the
Environmental Impact Report, discusses the impacts on the
circulation system and proposes mitigation measures. The
Specific Plan ensures that the necessary improvements will be
completed in a coordinated manner, and that the development will
meet its fair share of transportation fees/improvements.
The Specific Plan area will utilize innovative
technology to minimize congestion of area surface streets. The
Disneyland Resort itself will use pedestrian ways/people
mover/moving sidewalks to convey people between the theme parks
and the public parking facilities. An improved monorail system
12
will convey people between the theme parks and the hotel
district. A transit drop-off area will be installed. In
addition, the attractive system of landscaped promenades, plazas
and gardens will provide a pedestrian-oriented environment.
3.8.5 Parks and Open space
The Parks and Open Space section of the General Plan
Growth Management Element is designed to promote the adequate
assessment of new development impacts, and the adoption of
appropriate mitigation measures. The Specific Plan and
Environmental Impact Report promote, and comply with, these
goals.
The Specific Plan, in conjunction with the
Environmental Impact Report, discusses project impacts and
mitigation measures, including fair share contributions for
improvements at two city ball fields, an outdoor eating area and
attractive landscaped buffer zones between The Disneyland Resort
and surrounding land uses.
Air Oualitv
The Air Quality section of the General Plan Growth
Management Element is designed to promote the adequate assessment
of new development impacts, and the adoption of appropriate
mitigation measures to assure that SCAQMD air quality standards
are achieved, vehicle miles are reduced, and land uses are
proportionately balanced. The Specific Plan and Environmental
Impact Report promote, and comply with, these goals.
Development design features under the Specific Plan,
and mitigation measures under the Environmental Impact Report,
ensure that the project will comply with the Air Quality
Management Plan. The resort design will minimize vehicular use
within the Disneyland Resort; parking that is convenient and
close to I-5 will reduce vehicular use of area roads. In
addition, the Specific Plan provides for the implementation of a
comprehensive Transportation Demand Management program for all
resort employees and guests.
Commercial Recreation Area development consistent with
the Commercial Recreation designation promotes balanced land uses
under the General Plan.
3.9 Parks, Recreation and community Services Element
Conslstenc¥
The General Plan Parks, Recreation and Community
Services Element is designed to provide the community with
landscaped medians, street trees and parkways, and improved
parks, recreation and community service facilities and
opportunities. The Specific Plan and Environmental Impact Report
promote these goals.
13
Construction of the new Disneyland Resort theme parks
under the Specific Plan will establish Anaheim as a world leader
in parks and recreation facilities. In addition, the Specific
Plan provides for the creation of an extensive system of
landscaped public parkways as described in the Circulation and
Housing sections above. These landscaped open areas around The
Disneyland Resort, an outdoor eating area, and improvements at
existing parks, will provide Anaheim residents and workers with
additional recreational activities in an attractive environment.
In addition, the applicant will pay for improvements at two
community ball fields.
4.0 THE SPECIFIC PLAN RESULTS IN DEVELOPMENT OF DEBIR~ELE
CHARACTER, COMPATIBLE WITH EXISTING AND PROPOSED AREA
DEVELOPMENT. Anaheim Municipal Code § 18.93.070(3)
4.1 The Specific Plan Is a Desirable Development
The Specific Plan is a desirable development for the
reasons discussed above. The Disneyland Resort will enhance the
value of the Commercial Recreation area and Anaheim as a whole.
It will enhance Anaheim's position as a one of the most highly-
regarded recreation areas in the country. It will make
operations at The Disneyland Resort run more efficiently and with
improvements and economic benefits to be realized by the
surrounding community.
4.2 The SDeciflo Plan is Compatible with Existing and
Proposed Area Development in the commercial Recreation
Area
The Specific Plan provides for the modification,
improvement and expansion of the present Disneyland Resort within
the Commercial Recreation Area. As such, the Specific Plan
development will be compatible with surrounding Commercial
Recreation Area uses. The development is consistent with the
designation of the area as a priority growth area. It will
enhance the value of other facilities within the Commercial
Recreation Area because of the very desirable nature of the
Disneyland expansion, and because the new destination resort will
bring longer-term visitors to the area.
4.3 The Specific Plan is Compatible with Existin~ and
ProPosed Area Development in Surrounding Areas
The Specific Plan and Mitigation Measures identified in
the EIR achieve compatibility with the surrounding residential
community through efforts to enhance and landscape setback areas,
restrict building heights, and reduce impacts to residential
areas.
14
5.0 THE SPECIFIC PL]~N CONTRIBUTES TO A BALANCE OF LAND
USES. Anaheim Municipal Code § 18.93.070(4).
The City of Anaheim General Plan is designed to create
a balance of land uses within the City. The Commercial
Recreation Area is just one of a number of land use designations
within the City under the General Plan. Development according to
each of these specific land-use designation in their respective
areas contributes to a balance of land uses. The City has
identified the Commercial Recreation area as a high priority
growth area, and the Specific Plan provides for development
within the Commercial Recreation Area that is consistent with the
purposes of that area. By furthering and enhancing the purposes
of the Commercial Recreation Area, the Specific Plan contributes
to a balance of land uses within the City of Anaheim.
6.0 THE SPECIFIC PLAN RESPECTS ENVIRONMENTAL AND AESTHETIC
RESOURCES CONSISTENT WITH ECONOMIC REALITIES. Anaheim
Municipal Code § 18.93.070(5).
The Specific Plan provides for expansion of the
existing Disneyland theme park by utilizing the project site and
Commercial Recreation Area property more efficiently, as
previously discussed.
The Specific Plan provides for the construction of a
premier destination resort. It will establish Anaheim as a
commercial recreation leader for years to come, and create an
environment where other Anaheim facilities could flourish. The
Disneyland Resort will utilize planning and transportation
technology that reduces reliance on automobiles.
The Specific Plan provides for the visual enhancement
of the area between The Disneyland Resort and residential
neighborhoods. The Specific Plan, in conjunction with the
Disneyland Resort Environmental Impact Report, addresses project
environmental impacts, and provides for the feasible mitigation
of those impacts.
WHEREAS, pursuant to the provisions of the California
Environmental Quality Act, the City Council, in Resolution No.
93R- 107 , did find that FEIR No. 311 with the Statement of
Findings and Facts and Statement of Overriding Considerations and
the corresponding Mitigation Monitoring Program No. 0067,
certified June 22., 1993, addressed the environmental impacts
and mitigation measures associated with The Disneyland Resort
Specific Plan No. 92-1, and that FEIR No. 311 is adequate to
serve as the environmental documentation for The Disneyland
Resort Specific Plan No. 92-1; and
NOW, THEREFORE, BE IT RESOLVED that the Anaheim City
Council having considered the project refinements and the
evidence presented during the public hearing process, does hereby
15
approve specific Plan No. 92-1 (including Zoning and Development
Standards, a Design Plan and Guidelines and a Public Facilities
Plan), subject to the following conditions of approval.
CONDITIONS OF APPROVAL
The conditions of a99roval include all mitigation measures and
9roject design features as part of the mitigation monitoring
9rogram (No. 0067) for this project (as required by Section
21081.6 of the Public Resources Code). For purposes of these
conditions of a99roval, the following terms are used:
a. Applicant: The Walt Disney Company, its successors
and assigns.
b. Property Owner/Developer: Any owner or developer of
real property within The Disneyland Resort Specific
Plan area, including the C-R Overlay Area.
c. WESTCOT Center: The Disneyland Resort without
development of uses in the Future Expansion District
other than the proposed WESTCOT Center parking
facilities. The development includes a second gated
theme park (WESTCOT theme park), modifications to the
Disneyland Hotel, a new Disneyland Administration
Building, new hotels, entertainment areas, internal
transportation systems, two public parking facilities
and cast parking facilities. Further, none of the
conditions of approval contained herein shall be
required to be implemented prior to issuance of any
permits for or construction of new structures,
improvements, or other modifications within the
existing Disneyland theme park.
d. WESTCOT Theme Park: A gated theme park planned south
of the existing Disneyland theme park.
ELECTRICAL
1. That prior to issuance of each building permit, unless
records indicate previous payment, a fee for street lighting
purposes shall be paid to the City of Anaheim based on the
length of street frontage in an amount as established by City
Council resolution with credit against the fee given for City
authorized improvements installed by the property
owner/developer.
2. That pedestrian walkway lighting plans in the public right-
of-way shall be reviewed and approved by the Public Utilities
Department, Electrical Services Division and the Police
Department prior to installation.
16
3. That prior to the approval of each tentative tract or parcel
map, or issuance of each building permit, whichever occurs
first, Public Utility Easements (PUE's) will be recorded
and/or abandonment of PUE's will be processed to the
satisfaction of the Public Utilities Department for the
following circumstances:
A. As a result of increases in right-of-way, where electrical
and communication facilities are located adjacent to the
existing right-of-way, the facilities shall be either
located within the new right-of-way or relocated to new
adjacent areas, requiring a PUE.
B. The undergrounding of power and communication lines along
the major streets will result in the need to obtain PUE's
for placement of pad mounted equipment, and related
facilities required as a result of the overhead to
underground conversion work.
C. Alterations to existing private buildings and/or
~ construction of new structures (buildings, signs,
landscaping elements, etc.) may require relocation of
existing electrical and/or communication facilities. This
will require abandonment of existing PUE's and recordation
of new PUE's to accommodate the relocation.
4. That the roadway lighting of all public streets shall be
designed in accordance with the Public Utilities Department
Construction Standards and the Illuminating Engineering
Society Design Guidelines and Recommendations. If a special
themed roadway lighting design element is requested, and it
is not consistent with the current city of Anaheim
Construction Standards for Street Lighting, the following
criteria shall be met unless otherwise approved by the Public
Utilities Department, Electrical Engineering Division:
A. C-R Area Roadway Standard Design (Construction Standards,
~' and Material Specifications), and specific luminaries,
poles, and mast arms shall be authorized and approved by
the Public Utilities Department, Electrical Engineering
Division.
B. The design shall be complimentary in style throughout the
C-R Area.
C. Luminaries shall be roadway class High Pressure Sodium,
with Medium, Type III, cutoff distribution or other
substitute as may be approved by the Public Utilities
Department, Electrical Engineering Division. The type of
luminaire construction, ballast type, and operating
voltage shall be subject to the approval of the Public
Utilities Department, Electrical Engineering Division.
17
D. All material used in the public roadway lighting systems
shall be standard material in common usage and available
on the open market or other substitute as may be approved
by the Public Utilities Department, Electrical Engineering
Division.
E. Private streets within the C-R Area, with the exception of
those within the Hotel and Theme Park Districts, shall
have street lights installed which are compatible with the
design standards used for the public streets.
F. That the property owner/developer shall pay or cause to be
paid all costs associated with replacing the existing City
street light system within the public right-of-way
adjacent to or within the Disneyland Resort Specific Plan
area with the new special themed lighting system, if said
themed system is requested by the property
owner/developer.
ENGINEERING
5. That the following street design elements shall be shown on
each tentative tract or parcel map:
A. Street cross-sections, including dimensions, labels,
circulation designation (i.e., Resort Secondary) and
whether public or private.
B. Street grades and vertical alignment.
C. Horizontal alignment, including centerline radii, and cul-
de-sac radii.
6. That prior to the approval of each final tract or parcel map,
vehicular access rights to all public streets adjacent to
subject tract or parcel, except at approved access points,
~ shall be released and relinquished to the City of Anaheim.
7. That prior to approval of each street improvement plan, the
following shall be provided for( a one (1) year maintenance
period) in a manner acceptable to the City Engineer:
A. Parkway and median island landscaping and irrigation
maintenance.
B. Provision for the replacement of any tree planted in
accordance with landscaping plans in a timely manner in
the event that it is removed, damaged, diseased and/or
dead.
8. That prior to issuance of a grading permit, a rough or
precise grading plan prepared by a registered civil Engineer
18
shall be submitted to the City Engineer for review and
approval.
9. That all storm drain, sewer and street improvement plans
shall be designed and constructed to the satisfaction of the
City Engineer.
FIRE
10. That prior to the approval of each Final Site Plan and
prior to the issuance of each building permit, plans shall
be reviewed and approved by the Fire Department as being
in conformance with the Uniform Fire Code.
11. That prior to the placement of building materials on a
building site, an all-weather road shall be provided for
fire hydrants at all times, as required by the Fire
Department.
12. That all lockable pedestrian and/or vehicular access gates
shall be equipped with "knox box" devices as required and
approved by the Fire Department.
13. That prior to the approval of on-site water plans, unless
each commercial building is initially connected to
separate fire services, an unsubordinated covenant
satisfactory to the City Attorney's Office shall be
recorded prohibiting any individual sale of buildings
until separate fire services are installed in the
building(s) subject to the sale.
14. That prior to the placement of building materials on a
building site, an all weather driving surface must be
provided from the roadway system to and on the
construction site. Every building constructed must be
accessible to Fire Department apparatus. The width and
radius of the driving surface must meet the requirements
of Section 10.204 of the Uniform Fire Code as adopted by
the City of Anaheim.
15. That the property owner/developer shall maintain access
routes during construction for fire protection and
emergency vehicles; such routes shall be paved or, subject
to the approval of the Fire Department, shall otherwise
provide adequate emergency access.
LANDSCAPING
16. That excluding the Disneyland Administration Building,
within 120 days following the issuance of the first
parking structure building permit or commencement of
construction for the Disneyland Resort (Phase I),
whichever occurs first, the applicant shall commence
installation of roadway improvements, infrastructure
improvements and parkway landscaping and install parkway
19
trees within the Walnut Street Public Realm from Ball Road
to Katella Avenue in accordance with the requirements of
the Design Plan (Section 5.0) of the Specific Plan
document. Applicant shall diligently proceed with such
improvements and shall maintain said landscaping during
construction.
17. That root and sidewalk barriers shall be provided for
trees (with the exception of palm trees) within seven feet
of public sidewalks.
18. That all trees planted in the Public Realm shall be
planted in accordance with the standard City Tree Planting
Detail.
19. That prior to final building and zoning inspections, a
licensed landscape architect shall certify to the Planning
Department that all landscaping has been installed in
accordance with landscaping plans approved in connection
with the Final Site Plan.
20. That on-site non-Public Realm landscaping and irrigation
systems and Public Realm landscaping and irrigation
systems, within area in which dedication has not been
accepted by the City, shall be maintained by the property
owner/developer in compliance with city standards.
21. That any tree planted within the Setback Realm shall be
replaced in a timely manner in the event that it is
removed, damaged, diseased and/or dead.
22. That a licensed arborist shall be responsible for all tree
trimming.
NOISE
23. That the property owner/developer shall install and
maintain specially designed construction barriers at the
project perimeter areas. The construction sound barriers
shall be a minimum height of 8' with a minimum surface
weight of 1.25 lbs per square foot or a minimum Sound
Transmission Class Rating (STC) of 25. The structure
shall be a continuous barrier. Gates and other entry
doors shall be constructed with suitable mullions,
astragels, seals, or other design techniques to minimize
sound leakage when in the closed position. Access doors
should be self closing where feasible. Vision ports are
permissible providing they are filled with an acceptable
solid vision product.
24. That sweeping operations in the parking facilities and
private on-site roadways shall be performed utilizing
sweeping/scrubbing equipment which operate at a level
measured not greater than 60 dBA at the nearest adjacent
property line.
20
25. That pressure washing operations for purposes of building
repair and maintenance due to graffiti or other
aesthetical considerations shall be limited to daytime
hours of operation between 7:00 a.m. and 8:00 p.m..
26. That the property owner/developer shall pay all reasonable
costs associated with noise monitoring which shall include
monitoring conducted by a certified acoustical engineer
under the direction of the Planning Department to ensure
that the WESTCOT Center, including the South Parking Area,
ongoing operations do not exceed 60 dBA at any point on
the exterior project boundary property line between the
hours of 7:00 p.m. and 7:00 a.m. of the following day.
During the first five (5) years of operation of WESTCOT
theme park, said noise monitoring shall be conducted four
times a year on a random basis for a three-day period;
and, if the monitoring finds that the 60 dBA threshold is
being exceeded, modifications to the ongoing operations
shall be commenced immediately to bring the sound level
below the 60 dBA requirement, with additional follow-up
monitoring conducted to confirm compliance. If a
complaint is received by the City, additional noise
monitoring shall be conducted at the discretion of the
City; and if the monitoring finds that the 60 dBA
threshold is being exceeded, modifications to ongoing
operations shall be commenced immediately to bring the
sound level below the 60 dBA requirement, with additional
follow-up monitoring conducted to confirm compliance. If
the Disneyland Resort is in compliance during the first
five years, then the frequency of monitoring shall be
semi-annually thereafter.
PI~ANNING-RELATED
27. That no development shall occur unless such development is
substantially in accordance with the Disneyland Resort
Specific Plan No. 92-1 document on file with the Planning
Department and marked Exhibit A.
28. That the aesthetic concepts related to The Disneyland
Resort Specific Plan for improvements along the I-5 shall
be coordinated with plans for the C-R Area and the
Anaheim Center Master Plan.
29. That all Final Site Plans shall be prepared in conformance
with the Pre-File submittal requirements on file with the
Zoning Division of the Planning Department. Prior to
issuance of building permits, construction plans shall be
in substantial conformance with said Final Site Plans.
30. That prior to issuance of building permits, unless records
indicate previous payment, a fee for street tree purposes
shall be paid or caused to be paid to the City of Anaheim
based on the length of street frontage in an amount as
established by City Council resolution with credit against
21
the fee given for city authorized improvements installed
by the property owner/developer.
31. That prior to final building and zoning inspections, all
air conditioning facilities and other roof and ground
mounted equipment shall be shielded from public view as
required by the Specific Plan and the sound buffered to
comply with City of Anaheim noise ordinances from any
adjacent residential or transient-occupied properties.
Such information shall be specifically shown on the plans
submitted for building permits.
32. That except within the Theme Park District, prior to final
building and zoning inspections, all plumbing or other
similar pipes and fixtures located on the exterior of the
building shall be fully screened from view of adjacent
public rights-of-way and from adjacent properties by
architectural devices and/or appropriate building
materials; and, further, such information shall be
specifically shown on the plans submitted for building
permits.
33. That property owner/developer shall be responsible for the
removal of any on-site graffiti within 24 hours of its
application.
34. That the location and configuration of all lighting
fixtures including ground-mounted lighting fixtures
utilized to accent buildings, landscape elements, or to
illuminate pedestrian areas in the Hotel District, Parking
District and development in the CR Overlay Area, shall be
shown on all Final Site Plans. All proposed surface
parking area lighting fixtures shall be down-lighted with
a maximum height of twelve (12) feet adjacent to any
residential properties. All lighting fixtures shall be
shielded to direct lighting toward the area to be
illuminated and away from adjacent residential property
lines. All lighting fixtures, types and locations shall
be identified on the plans submitted for building permits.
35. That in connection with the submittal of Final Site Plans,
building elevations shall show that the rear elevations of
buildings visible from off-site areas shall be
architecturally accented to portray a finished look.
36. That, in the event a parcel is subdivided and there is a
need for common on-site circulation and/or parking, prior
to the recordation of a subdivision map, an unsubordinated
covenant providing for reciprocal access and/or parking,
as appropriate, approved by the City Traffic and
Transportation Manager and the Planning Department and in
a form satisfactory to the City Attorney, shall be
recorded with the Office of the Orange County Recorder. A
copy of the recorded covenant shall then be submitted to
the Planning Division of the Planning Department.
22
37. That no shuttle/bus/vehicular drop-off areas shall be
permitted in hotel/motel or vacation resort front setback
areas.
38. That with the exception of the Disneyland Administration
Building, prior to approval of the first Final site Plan,
issuance of the first building permit or approval of the
first tentative tract or parcel map to implement The
Disneyland Resort, whichever occurs first, The Walt Disney
Company shall submit proof to the city of Anaheim that The
Walt Disney Company has entered into an agreement with the
Southern California Edison Company with regard to the
relocation of the SCE Easement. Said agreement shall be
consistent with the provisions of the Disneyland Resort
Specific Plan, including the Setback Realm and Private
Realm landscape concepts identified in the Section 5,
Design Plan, of the Specific Plan document (Exhibit A).
Further, said agreement shall specify whether the SCE
transmission lanes will be undergrounded or enclosed in a
structure.
39. Intentionally deleted.
POLICE
40. That with the exception of the Theme Park and Parking
Districts, which are already addressed in the Specific
Plan, prior to approval of each Final Site Plan and prior
to issuance of each building permit, the Anaheim Police
Department shall review and approve plans for safety,
accessibility, crime prevention, and security provisions
during both the construction and operative phases.
STREET MAINTENANCE
41. That trash storage areas shall be provided and maintained
in a location acceptable to the Department of Maintenance
and in accordance with approved plans on file with said
Department. Such information shall be specifically shown
on the plans submitted for building permits.
TRAFFIC/CIRCULATION
42. That prior to issuance of building permits, or
commencement of construction, whichever occurs first, for
the West Public Parking Structure, plans shall show a
minimum of eleven (11) toll lanes and a minimum of 500
vehicle storage capacity prior to the toll booths; and,
prior to final building and zoning inspection for the West
Public Parking Structure, said toll lanes/storage capacity
shall be provided.
43. That prior to issuance of building permits, or
commencement of construction, whichever occurs first, for
the East Public Parking Structure, plans shall show a
23
minimum of fourteen (14) toll lanes and a minimum of 500
vehicle storage capacity prior to the toll booths; and,
prior to final building and zoning inspection for the East
Public Parking Structure, said toll lanes/storage capacity
shall be provided.
44. That gates shall not be installed across any driveway or
private street in a manner which may adversely affect
vehicular traffic in the adjacent public streets.
Installation of any gates shall conform to Engineering
Standard Plan No. 402 and shall be subject to the review
and approval of the City Traffic and Transportation
Manager prior to issuance of a building permit.
45. That plans for vehicular and pedestrian circulation shall
be submitted to the City Traffic and Transportation
Manager for review and approval showing conformance with
Section 5.0, "Design Plan" of the Specific Plan pertaining
to parking standards. Subject property shall be developed
and maintained in conformance with said plans.
46. That all driveways shall be constructed with minimum
fifteen (15) foot radius curb returns as required by the
City Engineer, unless otherwise approved by the City
Engineer.
47. That excluding the Disneyland Administration Building,
prior to approval of the first Final Site Plan, tentative
tract or parcel map, or issuance of a building permit,
whichever occurs first, for each District, vehicular
access points to the public streets shall be subject to
the review and approval of the City Traffic and
Transportation Manager. All access points shall be in
substantial conformance with the District Concept Plans in
Section 5.0, "Design Plan", of the Specific Plan document.
48. That prior to approval of each Final site Plan for the
Hotel District, parking plans shall be submitted to show
the location and configuration of hotel employee and guest
parking for that site plan. All parking plans shall be
subject to the review and approval of the city Traffic and
Transportation Manager.
49. That prior to approval of the Final Site Plan for the
Theme Park District Setback Realm, plans shall indicate
whether a bus and shuttle drop-off area will be located on
the west side of Harbor Boulevard at Freedman Way as shown
on Exhibit 4.4.2.a and Cross Section 7 (Exhibit 5.8.2m) of
the Specific Plan document. If shown, the design and
location of the bus and shuttle drop-off area shall be
subject to the review and approval of the City Traffic and
Transportation Manager prior to approval of the Final Site
Plan. If not shown, the design of the Public and Setback
Realms for the portion of the Theme Park District shown in
Cross Section 7 (Exhibit 5.8.2m) of the Specific Plan
24
document shall be the same as Cross Section 6 (Exhibit
5.8.2L) of the Specific Plan document.
50. That prior to Final Site Plan approval for parking
structures in the Hotel District, signage plans shall be
designed to enhance smooth traffic flows on each level of
the parking structure. These signage plans shall be
submitted to the City Traffic and Transportation Manager
for review and approval prior to Final Site Plan approval.
51. That any modifications to Walnut Street (e.g., turn
restrictions, narrowing of street, etc.) shall be subject
to the review and approval of the Planning Commission.
All modifications shall be designed and constructed to the
satisfaction of the City Engineer.
52. That all engineering requirements of the City of Anaheim,
including preparation of improvement plans and
installation of all improvements such as curbs and
gutters, sidewalks, water facilities, street grading and
pavement, sewer and drainage facilities, or other
appurtenant work shall be complied with as required by the
city Engineer and in accordance with specifications on
file in the office of the City Engineer, as may be
modified by the City Engineer; and, that security in the
form of a bond, certificate of deposit, letter of credit,
completion guarantee, or cash, in an amount and form
satisfactory to the city of Anaheim, shall be posted with
the City to guarantee the satisfactory completion of said
improvements. Said security shall be posted with the City
prior to the issuance of a building permit or final map
approval, whichever occurs first, to guarantee the
installation of the related improvements prior to final
building and zoning inspections in accordance with an
approved construction phasing plan. These requirements
may be modified by a Development Agreement between the
City of Anaheim and the applicant with respect to
improvements to be implemented by the applicant.
53. That prior to issuance of each building permit, the
appropriate Citywide Transportation Impact and Improvement
Fee shall be paid to the city of Anaheim in the amount(s)
determined by City Council Resolution. Consistent with
the Fee Ordinance, fees may be reduced in consideration of
right-of-way dedication and/or Master Plan of Arterial
Highway facility construction.
54. That when established by the city, the property
owner/developer shall participate in the Transportation
Network (TMA) to be created for the Commercial Recreation
Area and Anaheim Stadium Business Center and coordinated
with the I-5 Traffic Management Plan.
55. That during construction of the elevated pedestrian
way/people mover/moving sidewalk over Harbor Boulevard,
safe and convenient pedestrian access to/from the east
25
parkway side of Harbor Boulevard shall be provided by the
applicant, to the satisfaction of the City Engineer; and,
the same shall be provided during construction between the
Hotel District and the Theme Park District on the east
parkway side of West Street/Disneyland Drive.
56. That ongoing operations for the South Parking Area
structure shall provide that it be loaded and emptied to
minimize evening noise generation, or other measures
acceptable to the City implemented.
57. Intentionally deleted.
58. That prior to the issuance of the first building permit
for the East Parking Area, the applicant shall submit for
review and approval by the City Engineer, a plan showing
the location of the Theme Park guest bus and shuttle drop
off area, which is to be located on the west side of
Harbor Boulevard or internal or adjacent to the East
Parking Area. If said facility is internal or adjacent to
the East Parking Structure, this facility shall be
constructed as an intermodal facility to accommodate at
least 24 large bus stalls and 20 clean fuel shuttle bus
stalls, with safe and convenient pedestrian connections to
the elevated pedestrian way/people mover/moving sidewalk
system between the parking structure and Theme Park
District. Further, that prior to final building and
zoning inspections for Phase I, said facility shall be
provided by the applicant in accordance with the approved
plan.
59. That prior to any development associated with uses other
than parking within the Future Expansion District,
additional environmental review will be required.
WATER
60. That prior to final building and zoning inspections, the
water backflow equipment and any other large water system
equipment shall be installed to the satisfaction of the
Public Utilities Department, Water Utility Division, in
either underground vaults or behind the street setback
area in a manner fully screened from all public streets
and alleys. Such information shall be specifically shown
on the plans submitted for Final Site Plan approval and
for building permits.
MISCELLANEOUS
61. That the applicant will build or preserve, or cause to be
built or preserved, 500 affordable housing units in the
City of Anaheim in connection with the development of the
Project. The housing units shall be preserved,
constructed or under construction prior to the opening of
the WESTCOT Theme Park. The City shall cooperate with the
applicant in securing financing, identifying sites and
26
approving entitlements. The applicant shall consult with
the city prior to entering into binding agreements to
build or preserve, or cause to be built or preserved, such
housing units in the city. The applicant shall give
priority to the preservation of existing housing units in
deteriorating multi-family areas of the city. The
applicant shall give priority to family units of 2 and 3
bedrooms with a goal of 50% of the units to be 2 or more
bedrooms.
The applicant shall have discretion to select the
particular projects in which it will participate.
Affordable housing units required as part of other
projects' conditions of approval shall not be eligible for
credit. A minimum of 40% of the units shall serve "very
low income households" (as defined in Title 25 of the
California Administration Code, Section 6926). The
remainder of the units will serve "low income households".
62. Intentionally deleted.
63. That in conjunction with the construction of the East and
West Public Parking Facilities, the Hotel parking
structures and the South Parking Area Structure, no impact
driven piles shall be allowed.
64. The completion of these reclassification proceedings is
contingent upon approval and adoption of General Plan
Amendment No. 331 by the City Council.
65. That within thirty (30) days of the City Council's action,
the applicant shall provide the Planning Department with
three (3) copies of an amended Specific Plan document
reflective of the City Council's action. Upon review and
approval of the amended document by the Planning
Department, fifty (50) copies of the final document,
including one master copy suitable for reproduction, shall
be provided by the applicant to the Planning Department.
66. That within thirty (30) days of the City Council's action,
the property owner/developer shall provide the Planning
Department with three (3) copies of an amended Specific
Plan document reflective of the city Council's action.
Upon review and approval of the amended document by the
Planning Department, fifty (50) copies of the final
document, including one master copy suitable for
reproduction, shall be provided by the applicant to the
Planning Department.
67. That the applicant and/or property owner/developer, as
specified in the individual mitigation measures, shall be
held responsible for compliance with the mitigation
measures and that the applicant shall be responsible for
implementation of the project design features identified
in Final EIR No. 311 and for complying with the monitoring
and reporting program established by the City in
27
compliance with Section 21081.6 of the Public Resources
Code. Furthermore, the applicant and/or property
owner/developer, as specified in the individual mitigation
measures, and the applicant, for project design features,
shall be responsible for any direct costs associated with
the monitoring and reporting required to ensure
implementation of those mitigation measures and project
design features identified in Final EIR No. 311 that have
been incorporated into the Mitigation Monitoring Program.
The Mitigation Monitoring Program, which includes
mitigation measures and project design features, is
attached and made a part of these conditions of approval.
BE IT FURTHER RESOLVED that the City Council of the City
of Anaheim does hereby find and determine that the adoption of
this Resolution is expressly predicated upon applicant's
compliance with each and all of the conditions hereinabove set
forth. Should any condition or any part thereof, be declared
invalid or unenforceable by the final judgment of any court of
competent jurisdiction, then this Resolution, and any approvals
herein contained, shall be deemed null and void.
THE FOREGOING RESOLUTION is approved and adopted by the
City Council of the city of Anaheim this 29th day of June, 1993.
28
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) ss.
CItY OF ANAHEIM )
I, LEONORA N. SOHL, City Clerk of the City of Anaheim, do hereby certify that the foregoing Resolution
No. 93R-146 was introduced and adopted at a regular meeting provided by law, of the Anaheim City Council
held on the 29th day of June, 1993, by the following vote of the members thereof:
AYES: COUNCIL MEMBERS: Feldhaus, Hunter, Simpson, Daly
NOES: COUNCIL MEMBERS: None
ABSENT: COUNCIL MEMBERS: Pickler
AND I FURTHER CERTIFY that the Mayor of the City of Anaheim signed said Resolution No. 93R-146 on
the 30th day of June, 1993.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of Anaheim
this 30th day of June, 1993.
CITY CLERK Of THE CITY OF ANAHEIM
(SEAL)
I, LEONORA N. SOHL, City Clerk of the City of Anaheim, do hereby certify that the foregoing is the original
of Resolution No. 93R-146 was duly passed and adopted by the City Council of the City of Anaheim on
June 29, 1993.
CITY CLERK OF THE CITY OF ANAHEIM
Page 1 of 5
T F. GAL DESCRIPTION
THE DISNEYY~adND RESORT SPECIFIC PLAN
All that certain real property, in the C. ity of Anah
County of Orange, State of Caliibmia, more parttcularly described as
follows:
Beginning at the intersection of the northerly line of Katella Avenue,
"120 feet wide, with the westerly line of Harbor Boulevard, 120 feet
..wide; thence Nort.h. 89°11'53" West 2583.25 feet along said nort~.erly
line to the centerline of West Street, 90 feet wide; thence continuing
North 89°41'05" West 1255.79 feet along said northerly line to the
be '_gnminlg of that certain property line curve return concave northerly
and having a radius of 17.00 feet, as shown on Tract No, 2854, in said
City, as per map recorded. in Book 90 Pages 39 through 40 of
- M!.'scellaneous Maps of stud County; thence westerly 732 feet ~ong
said curve through a central angle of 24°40'57" to the easterly line
~ of Walnut Street, 90 feet wide; the. nce on a n.on-tangent line North
00°40'55"East 1265.11 feet along sa, d easterly line to the southerly
line of Lot 3, Block 14 of Fairview Colony Tract, in said City, as per
map recorded in Book 1 Page 33 of Miscella.neous Maps of said County;
thence. North 89°30'26"West 4.00 feet along said southerly line to the
beginrang of a non-tangent curve., concave westerly, having a radius of
698.77 feet and to which beginning a radial line bears South 89019'05"
East, said curve being the easterly line of that certmn document
recorded in Book 7700 Page 764 of Official Records of said County;
thence northerly 87.73 .fee.t along said curve through a central angle
of 07'11'36" to the beginrung of a reverse curve, concave easterly and
having a radius of 698.77 feet; thence northerly 87.73 feet along said
curve through a central angle of 07011'36" to a p.oint of tangency with
the easterly line of said Walnut Str.eet, 90 feet w~de; .thence North
00°40'55" East 1091.16 feet along stud line to the beginning of a
curve concave easterly and having a radius of 25.00 feet and tangent
~ at its easterly terminus with the southerly line of Cerritos Avenue,
· -,' 97 feet wide; thence North 08°58'30" West 149.11 feet to the
intersection of the northerly line of that certain document recorded
in Book 8735 Page 780 of Official Records of said County, with the
easterly line of Walnut Street, 60 feet wide, as shown on Tract No.
7948, m said City, as per.map recorded in Book 260 Pages 42 and 43 of
Miscellaneous. Maps of said County; thence N.orth 00040'23" East 1305.73
feet along stud easterly line to the northerly line of the north half
of the west half of the Southeast Quarter of the Northeast Quarter of
Section 21, Township 4 South, Range 10 West, in the Rancho San Juan
Cajon d.e. Santa Aria, in said Ci.tx., as per map recorded in Book 51 Page
10 of Miscellaneous Maps of said County;.thence South 89°45'45" East
37.00 feet along said line to the easterly lin.e of Walnut Street, 87
.feet wide, as shown on a Parcel Map, ,n stud City, as per map recorded
m Book 10 Page 44 of .['.arcel Maps; thence North 000.4.0'23" East 662.71
feet along said easterly hne to the southerly line of said Parcel .
Map; thence South 89~39'58" East 603.76 feet along said southerly 1,ne
to the southeast corner thereof; thence North 00°40 05" East 608.70
feet along the easterly lin. e of said Parcel Map to the southerly line
of Ball Road, 106 feet uade; thence South 89°34'11" East 405.70 feet
A%tachment 1
Legal Description
Page 2 of 5
al.ong ~ald southerly llne to the westerly line of a Parcel Map, in
stud City, as per map recorded in Book 29 Page 14 of Parcel Maps of
said County; thence South 00o39'47" West 210.03 feet along said
westerly line to the southwest corner thereof; ~ence South 89'B4'11~
East 195.00 feet along the southerly line of stud Parcel Map to the
westerly line of West Street, 100 feet wide, as shown on said Par~.cel
Map; thence South 00~39'47" West 66.87 feet along said westerly line
on the westerly prolongation of the northerly line of the south half
of the Northwest Quarter of the Northwest Quarter of the Northwest
Quarter of Section 22 of said Rancho San Juan Cajon de Santa Aria;
thence South 89°10'01" East 560.54 feet along said prolongation .and
northerly line to the easterly line of Parcel 1 of a Parcel Map, m
said City, as per map recorded in Book 78 Page 42 of Parcel Maps of
said Cou.nty; thence North 00~..38'42" E~t 277.25 feet along said
easterly line to the southerly line of stud Ball .R. oad; thence S.outh
89°09'30~ East 317.12 feet along said southerly line to the beginning
of a non-tangent curve, concave southwesterly, having a radius of
40.55 fe.et and to. which. beginning a radial line bears North 23°0.1'08"
East, stud beginrang being the most westerly comer of that certain
Irrevocable Offer of Dedication recorded December 22, 1988 as
Instrument no. 88-668535 of said County; thence southeasterly 4.37
feet along said curve through a central angle of 06°10'49." to the
beginning of a reverse curve, concave northerly and having a radius of
59.45 feet; thence easterly 29.42 feet along said curve through a
central angle .o.f 28°21'27"; thence South 89°09'.30" East 195.71 feet to
the southerly hne of Ball Road, variable in v~dth, as shown on a
Parcel Map, in said City, as per map recorded in Book 40 Page 9 of
Parcel Maps; thence Sou.th 75°59'03" East 21.91 feet along said
southerly line to the be10nning of a curve concave northerly and
having a radius of 330.00 feet; thence easterly 151.52 feet along said
curve through a central angle of .26°18'29"; thence. North' 77°42'28"
East 48.61 feet to the southerly hne of that certmn Document
recorded February 21, 1990 as Instrument No. 90-090852 of Official
Records of said County; thence South 89°09'30" East 500.26 feet along
said southerly line to the southwesterly line of the Southern Pacific
Railway Company Right .o.f Way; thence South 39°56'21" East 284.22 feet
along said southwesterly hne to the most ..w, esterly comer of the land
described in the Deed to the State of Cahfomia recorded April 6,
1960 in Book 5179 Page 272 of Official Records of ?.aid County; thence
South 36o41'26" East 391.36 feet along said westerly line to the
beginning of a curve concave westerly and h. aving a radius of 370.00
feet and tangent at its southerly .terminus wath that certain course,
recited as North 00°16'25" West, m the Deed to the State of
California filed December 1, 1954, as Instrument No. 30189 in the
office of the Registrar of Titles of said County; thence southerly
241.06 feet along stud curve through a central angle of 37 19 43',
thence South 00°38'17" West 265.88 feet along said tangent line to the
beginning of a curve con.cave northeasterly and having a radius of
350.00 feet, said curve being .the northwesterly c. ontinuati.on of that
certain curved southwesterly line, recited as .h. avmg a radius of
350.00 feet, in the Deed to the State of Cahform~ recorded August
11, 1954 in Book 2789 Page 450 of Official Re.cords of'said Cqunty;
thence southeasterly 3.49.79 feet along said continuation and recited
curved southwesterly hne, through a central angle of 57°15'25";
L:gal Description
Page 3 of 5
thence continuing South 56 37'08 East 39.04 feet along said
southwes. terly line. to the beginning of a curve concave southwesterly
a~ld having a tadres of 275.00 feet, s.al.'d b.eginning being the most
northerly corner of the land as described m Document recorded June
20, 1955 in Book 3109 Page 539 of Offidal Records of said County;
thence southeasterly 274.81 feet along said.curved wester. ly line,
.t)r. ough a central angle of 57015'25" to a line parallel vath and
distant westerly 60.00 feet, measured at fight angles, from the
ceaterline of Harbor Boulevard as shown on Record o.f Survey fried in
Beok 78. Pages 31 ..and 32 of Record of Surveys of stud County; thence
along said parallel line South .00°38'17" Wes.t 0_33 fe.e.t; thence South
89°11~1" F.~st 7.00 feet to a line parallel vath and d~stant westerly
53.00 feet from the centerline of said Harbor Boulevard; thence South
00~38'17" West. 1106.79 feet along said line to an angle point therein;
thence continuing South 00°39'57'~ West 1144.72 feet to the westerly
prolongation of the northerly line of the southerly 175.00 feet of the
Southwest Quarter of the Northwest Quarter of the Southeast Quarter of
Se.ction 22, Township 4 South, Range 10 West, in said Rancho San Ju. an
Cajon de Santa Aria; thence South 89°09'46" East 713.78 feet along stud
prolongation and northerly line to the westerly line of Lot 20, Tract
N.o.. 190, in said City, as per map recorded in Book 23 Page 50 of
Miscellaneous Maps of stud County; thence North 00040'07" East 505.52
feet along said westerly line to the northwesterly corner thereof;
thence South 89°09'33" East 1225.80 feet along the northerly line of
said lot to the northwesterly. prolongation of the northeasterly line
of Parcel 1 of Parcel Map, in said City, as per map recorded in Book
.122 Pages 11. and 12 of .Parcel Maps; thence South 39057'30" East 278.71
~eet along stud prolongation and northeasterly line to the beginning
of a curve concave southwesterly and having a radius of 455.00 feet;
thence southeasterly 25.80 feet alo.n.g said curve through a ce.ntrat
angle of 03°14'57" to the westerly hne of the land described ~n the
Deed to the State of ..Ca~.ifornia recorded in Book 13216 Page 132 of
Official Records of stud County; thence on a non-tangent line South
25°14'14" East 76.12 feet to the northwesterly coruer of the land
described in Deed to the State of California recorded January 11, 1982
as Instrument No. 82-009830 of said County; thence South 14o24'29"
Ea:s.t 123.00 feet; thence South 01o29'09" We. st 12.7.53 feet an angle
pmnt in the west. erly line of the land described m the Deed to the
State of Califorma recorded March 11, 1982 as Instrument No. 82-
085437, of Official Records of said County; thence South 20°45'10"
West 114.61 feet, thence South 25o2823 West 29.84 feet to the
southerly line .of Lot 20.; thence North 89°09'46" West 29.84 feet to
the southerly hne of stud Lot 20; thence North 89o09'46" West 528.16
feet along said line to the northerly prolongation of the most
westerly line of Clementinc Street as per d. ocument recorded in Book
13525 Page 1615 of Official Records of stud C.ounty; thence South
00~39'11" West 211.22 feet along said prolonganon and westerly line
to the beginning of a curve concave easterly and having a radius of
501.23 feet; thence continuing along said westerly line, southerly
50.08 feet along said curve through a central angle of 05043'30" to
the beginning of a reverse .curve, concave westerly and having a radius
of 501.23 feet; then. ce continuing along said westerly line southerly
50.08 feet along stud curve through a central angle of 05°43'30";
Legal Description
Page 4 of 5
thence continuing along said westerly line South 01Y39'11" West 335.40
feet to the northerly line of Tract No. 3330, in said City, as per map
recorde.~ in Book 113 Pages 21 and 22 of Miscellaneous Maps of said
County; thence South 89c11'46" East 2.00 feet along said northerly
line to the we. sterly line of Clementinc Street, 60 feet wide, as shown
on. map of stud Tract; thence South 01Y'41'15" West 735.30 feet along
..s,?d westerly line and its southerly prolongation to the southerly .
line o.f Xatella Ave.hue, 120 feet wide, thence easterly along said line
"to a. line parallel vath the east llne of the Northeast Quarter of .
Sectaon 27of said R. ancho San Juan Cajon de Santa Ana, and which
passes through a point on the north line of said Section, dis .mn.t
thereon westerly 620.00 feet from the Northeast Corner of saad
.N. ortheast Quarter; thence southe.r. ly 205.05 feet along said parallel
line to a line parallel with and d~stant southerly 205.00 fee. t,
measured at right angles, .from the N.orth line of said Se..ctaon; thence
easterly 575 feet along stud parallel hne to the westerly line of
Haster A.v. enue, 90 feet wide as show~..; thence southerly 387.16 feet
along sald westerly line to the south line of the north half of the
.n. orth half of stud Northeast Quarter; thence westerly along said south
line to a line parallel with and distant easterly 400.00 feet,
measured at right ang!es, from the easterly line of said Harbor
Boulevar.d., 120 feet wide; thence. northerly. 390.36 feet along said
parallel line to a line parallel vath and distant sou.therly 205..00
feet, measured at right angles, from the southerly line of stud.
Katella Avenue; thence easterly along said parallel line to a. line
parallel with and distant easterly. 890.00 feet, measured at right
angles, from the centerline of stud Harbor Boulevard; thence .northerly
325.00 feet along said parallel line to the northerly line of stud
Katella Avenue; thence westerly along said northerly line to the
easterly line of the land described in Deed .to Alwyn S. Jewell and
Lucille G. Jewell recorded October 5, 1959 ~n Book 4912 Page 102 of
Official Records of said County; thence North 00°37'57" East 615.00
feet along said easterly line to a line parallel with and distant .
675.0.0 feet northerly, measured at right angles, from the centerline
of stud Katella Avenue; thence North 89011'49" West 893.51 feet along
said parallel line to the westerly line of said Harbor Boulevard;
thence South 00°39'57" West 615.00 feet along said westerly line to
the Point of Beginning.
Legal Description
Page $ of $
EXCEPTING THEREFROM the following described land:
The easterly 5.00.00 fee.t of Lot I in Block l! of the Fairview
Colony Tract, m the City of Anaheim, Count~ of Orange, State of
C~llfornia, as shown on a map Recorded in Eook 1, Page 33 cf
Miscellaneous Maps, Records of Orange County, California.
EXCEPTING THEREFROM that portion of said land included within the
lines of Tract No. 2854, as shown on a map Recorded in Book 90,
~al~.e,s 3.9 and 40 of Miscellaneous Maps, Records of Orange C~unty,
t_.alllOrllla.
ALSO EXCEPTING THEREFROM the following described land:
The North 435.00 feet of the West 455.00 feet of the East 460.00
feet of Lot I in Tract 2854, in the City of Anaheim, County of
Orange, State of California, as per Map recorded in Book 90, Pages
39 and 40 of Miscellaneous Maps, in the Office of the County
Recorder of said County.
Prepared under the supervision of Joseph G. Truxaw, L.S.
J s t L.'S. 6871 .
J C. Truxaw and Associates, Inc.
~,~ TRUXAW ._-
NO. 6871
First revision: 6/14/93
file: juan\c:\pcw\data\dis93053. ~ rx-~
MITIGATION MONITORING PROGRAM NO. 0067
(INCLUDING PROJECT DESIGN FEATURES) FOR
THE DISNEYLAND RESORT SPEClFIC PLAN
CEQA Action Environmental Impact Report No. 311 (Resolution No.: 93R]0t
Project Description General Plan Amendment No. 331 and Specific Plan No. 92-1 (including Zoning and Development Standards,
Design Guidelines, and a Public Facilities Plan).
Applicant The Walt Disney Company, 500 South Buena Vista StreeL Burbank, California 91521.
Contact: Douglas M. Moreland, Disney Development Company.
Project Location The project site is located along the westerly side of Interstate 5 (I-5). Ball Road on the north and Katella
Avenue on the south are the major east-west thoroughfares crossing the Specific Plan area. Harbor Boulevard is
the main north-south thoroughfare running through the Specific Plan area. I-5 abuts the northeastern edge of
the proiect site.
Terms and lh~fiai6o~s
holela, enm~ainment areas, intumal tran~porlatlon sysmms, two.public. parking facilities an~ th~ Soath Parking. Area in th~ Future .E?ansion District. None of ~e mi. tigatio~ .measures.or, proj~t design
the aarn~ or aupe?,or- effect on th~ e.~vi~o. rimertL Th* Planning I~. partmerit: in .conjunction with .any approl~.fi~tu agencies or City dep?tngn.ta, s~aH detu.rmine the. ad.~.ua0y of any proposed 'envi.Rm~e. ntal
Revised 6/15/93-dismmp3a.wp
THE DISNEYLAND RESORT SPECIFIC PLAN 2
Timing Measure Responsible for Monitoring Completion
LAND USF,-RELATED PLANS AND POLICIES
Varies The applicant shall implement all project design features or The Planning Department, in
their environmental equivalent. The City of Anaheim conjunction with any
Planning Depa~iment will ensure compliance through the appropriate agencies or City
mitigation monitoring process. (3.1-1) Departments, shalldetermine
the adequacy of any
proposed environmental
equivalent.
Prior to Issuance of Each Building plans shall be submitted by the property Planning Department,
Building Permit owner/developer and will be reviewed for consistency with Planning and Building
the Specific Plan. (3.1-2) Divisions
Prior to Approval of Each The proposed project shall be implemented based on the Planning Depathnent,
Final Site Plan or IssuanCe of guidelines and standards in The Disneyland Resort Specific Planning Division
Each Building Permit, Plan, which includes zoning and development standards,
Whichever Occurs First design guidelines, and a Public Facilities Plan. All
development proposals within The Disneyland Resort Specific
Plan area must be consistent with The Disneyland Resort
Specific Plan and the City of Anaheim's General Plan, as
amended by the proposed project. (PDF 3.1-1)
LAND USE COMPATIBILITY
Varies The applicant shall implement all project design features or Refer to Note #7 on page 1.
their environmental equivalent. The City of Anaheim
Planning Department will ensure compliance through the
mitigation monitoring process. (3.2-1)
Prior to Issuance of Each For parking facilities associated with the Hotel and Parking Planning Department,
Building Permit Districts, the property owner/developer shall submit plans Planning Division
detailing the setbacks for the parking structures and
landscaping plans which minimize compatibility impacts of
the parking facilities on surrounding areas, consistent with
Section 5.8 of the Specific Plan. (3.2-2)
R~vised 6115193-dismmp3a.wp
Timing Measure Responsible for Monitoring Completion
Prior to Approval of Each Applicant shall submit documentation that project design Planning Department,
Final Site Plan or Issuance of features are in compliance with all building setbacks, height Planning Division
Each Building Permit, standards, landscaping requirements, and design guidelines as
Whichever Occurs First specified in Section 7.0 of Appendix B, The Disneyland
Resort Specific Plan. (PDF 3.2-1)
TRANSPORTATION AND CIRCULATION
Varies The applieant shall implement all project design features or Refer to Note #7 on page I.
their environmental equivalent. The City of Anaheim
Planning Department will ensure compliance through the
mitigation monitoring process. (3.3-1)
Prior to Issuance of Each Appropriate traffic signal assessment fees shall be paid by the Planning Department,
Building Permit property owner/developer to the City of Anaheim in mounts Building Division, Public
determined by the City Council Resolution in effect at the Works/Engineering
time of issuance of the building permit or credit given for Department, Traffic
City-authorized improvements. (3.3-2) Engineering Division
Prior to Approval of the First The property owner/developer shall irrevocably offer for Planning Department,
Final Subdivision Map or dedication (with subordination of easements), including Planning Division; Public
Issuance of the First Building necessary construction easements, the ultimate rights-of-way Works/Engineering
Permit for Each Phase (as indicated in the General Plan Circulation Element, as Department, Development
(Excluding the Disneyland amended per GPA No. 331) for the following arterial Division; City Attorney's
Administration Building), highway/intersection half-sections adjacent to parcels under Office
Whichever Occurs First. its ownership to the City of Anaheim:
a. Katella Avenue (to ultimate 8-lane facility)
b. Walnut Street
c. West Street/Disneyland Drive
d. Ball Road
e. Harbor Boulevard
f. Freedman Way
g. Clementinc Street
h. Manchester Avenue
i. Cerritos Avenue
J. Haster Street
Revised 6/15/93<lismmp3a.wp
¢
THE DISNEYLAND RESORT SPECIFIC PLAN 4
Timing Measure Responsible for Monitoring Completion
Within 120 Days of Acquiring If, after the initial dedications, any additional parcels are Planning Department,
Properties Adjacent to Above- acquired by the applicant adjacent to the above-mentioned Planning Division; Public
Mentioned Arterial Highways/ arterial highway/intersection half-sections, the applicant shallWorks/Engineering
Intersection Half Sections notify the City in writing of said acquisition and the ultimate Depm h,,ent, Development
rights-of-way for said properties shall be irrevocably offered Division; City Attorney's
for dedication to the City of Anaheim. 0.3-3) Office
Prior to Issuance of Building The applicant shall provide a cast guard entrance 150' south Public Works/Engineeffmg
Permit for the Disneyland of Ball Road at the entrance to the Disneyland Administration Depamuent, Traffic
Administration Building; to be Building with three inbotmd and a minimum of two Engineering Division
implemented prior to final outbound lanes to m'mimize queuing onto Ball Road. 0.34)
building and zoning inspections
for the Disneyland
Administration Building
Prior to approval of the First A phasing plan shall be submitted for review and approval to Public Works Engineering
Grading Plan for each phase of the appropriate City Engineer in Anaheim and/or Garden Department, Traffic
the Disneyland Resort Grove (for improvements within Garden Grove) Engineeffmg Division
demonstrating how the improvements shown in Table 3.3-16,
as approved by the City Engineer, will be constructed.
0.3-5)
Revised 6/15/93-dismmp3a.wp
TABLE 3.3-16
WESTCOT MITIGATION PLAN
Location Description of Improvementd'
I. Project Desien Featuresa'
A. Streets
West Street Ball Road Overcrossing
West Street (Katella Avenue to Ball Road) Realignment and reconstruction
Freedman Way (Harbor Boulevard to Clementinc Street: Widening
Clementinc Street to I-5)
Clemantine Street (Freedman Way to Katella Avenue) Widening
Walnut Street (Adjacent to strawberry field and median Widening
from Katella Avenue to Ball Road)
Cerritos Avenue (Walnut to West) Realignment and reconstruction
B. Intersections
Ball Road/West Street/Disneyland Drive Complete redesign
Harbor Boulevard/Freedman Way Complete redesign
Haster Street/Freedman Way Add 3rd through eastbound and westbound, 2nd left-turn
eastbound
Clementinc Street/Freedman Way 3rd through eastbound and westbound, left-turn eastbound
and westbound, remove right-turn northbound, and left
turn southbound, 2nd through northbound and
southbound
Walnut Street/Cerritos Avenue (N) Realign
Walnut Street/Cerritos Avenue (S) Reconfignre
II. Mitioation Measures
Baseline Project
Anaheim Boulevard/Ball Road Add 2rid left-turn Add right4urn westbound
northbound, southbound
Euclid Street/Ball Road Add 2nd left-turn Add 2nd left-turn
northbound, southbound eastbound, remove right-
turn eastbound
Harbor Boulevard/Chapman Avenue Add 2nd left-turn Add 2rid left-turn
eastbound and westbound, northbound and
remove right-turn southbound, remove right-
eastbound and westbound turn southbound
Walnut Street/Ball Road Add eastbound through
aa3005mm.wp
TABLE 3.3-16 (continued)
Location Description of Improvementd'
IlL Katella Avenue Smart Streetb'
Katella Avenue/West Street/Disneyland Drive Add right-turn westbound
Euclid Street/Katella Avenue Add 2nd left-turn eastbound, westbound
Harbor Boulevard/Katella Avenue Add right-turn southbound
Haster Street/Katella Avenue Add right-turn eastbound and westbound
1V. !-5 Imorovementsc'
I-5 Southbound at West Street Mixed-flow offramp
V. The Disneyland Administration Bulldim,
Mltiuation Plan
Anaheim Boulevard/Ball Road Add a westbound right-turn lane
West Street (N)/Ball Road Restripe/redesign the existing westbound right-turn lane
to a shared right-through lane.
Ball Road/DLAB Driveway Redesign the westbound left-turn lane to provide 150 feet
of dual lane storage or 250 feet of single lane storage and
the eastbound right-turn lane to provide 250 feet of
storage.
Redesign the DLAB entrance driveway to provide three
inbound lanes and a minimum of two outbound lanes,
with its own parking entrance gate at approximately 150
feet south of the intersection.
VI. South Parking Area
Clementine Street/Katella Avenue South half-width of six lane arterial adjacent to applicant-
owned property plus eastbound right-turn only; dual left-
turn lanes eastbound and westbound.
Haster Street, south of Katella Avenue West half-width of ultimate six lane arterial south of
KateHa Avenue to the southern property line of the South
Parking Area, plus 150 foot right-turn only lane to right-in
only driveway at South Parking Area access.
Further improvements, if necessary, to maintain
Clementinc Street/Katella Avenue intersection at not
worse than LOS D shall be constructed to the satisfaction
of the City Engineer.
a. Refer to Section 3.3.3, Project Design Features, for a more detailed description.
b. Eligible Katella Smart Street improvements are scheduled to be funded from Measure M.
Currently proposed as part of 1-5 widening project.
d. Ultimate right-of-way and improvement details will be coordinated with the applicant and will be set forth in the final
improvement plans to the satisfaction of the City Engineer.
THE DISNEYLAND RESORT SPECIFIC PL 7
Timing Measure Responsible for Monitoring Completion
In accordance with the timing Excluding the Disney Administration Building, relocation of Public Works/Engineering
set forth in the phasing plan the SCE transmission lines and demolition, but including the Department, Traffic
South Parking Area, the applicant shall mitigate (through Engineering Department
constructing or paying the actual total costs for
consultant/contractor services for preliminary and final
engineering, soils analysis, right-of-way acquisition,
demolition, relocation, construction and inspection, and other
related expenses) the traffic impacts of the WESTCOT Center
by implementing the improvements identified in Table 3.3-
.16, as approved by the City Engineer, in accordance with the
phasing plan approved by the City Engineer.
If the City of Anaheim adopts a traffic impact fee, as
discussed in Section 3.3.1.3 of the ELR, funds collected
under this program with nexus to these improvements may be
used to reimburse the applicant for the portion of the baseline
improvements (as identified in Table 3.3-16) which exceed
the project share of the improvements. Improvements
otherwise funded by public sources prior to approval of the
Final Site Plan for each phase will be deleted from project
participation. (3.3-6)
In accordance with the The following improvements are required: Public Works/Engineering
Approved Phasing Plan Department, Traffic
· Add eastbound and westbound dual left-turn lanes and an Engineering Division
eastbound right-turn lane to the Clementinc Street/Katalla
Avenue intersection, with a storage length of 200 feet
accommodating six lanes on Katella Avenue with a 24-foot
wide median.
· Add a southbound right-turn pocket to the right-turn-in-
only entrance to the South Parking Area on Haster Street,
with a storage length of 150 feet; and, provide west half-
width of ultimate six lane arterial south of Katella Avenue
to the southern property line of the South Parking Area.
0.3-8)
Revised 6/15/93<lismmp3a.wp
THE DISNEYLAND RESORT SPECIFIC PLA(N {'
8
Timing Measure Responsible for Monitoring Completion
In accordance with the The following improvements shall be required: Public Works/Engineering
Approved Phasing Plan for Department, Traffic
the Disneyland Administration · Add a westbound right-turn lane at Anaheim Engineering Division
Building Boulevard/Ball Road.
· Restripe existing left-turn lane westbound to provide a
minimum of 150 feet of dual lane storage or a minimum
of 250 fee{ of single-lane storage at Ball Road/Disneyland
Administration Building driveway.
· Provide an eastbound right-turn pocket with 250 feet of
storage at Ball Road/Disneyland Administration building
driveway.
· Redesign the Disneyland Administration Building entrance
driveway to provide three inbound and a minimum of two
outbound lanes, with its own entrance gate located a
minimum of 150 feet south of the intersection at Ball
Road/Disneyland Administration Building driveway.
(3.3-9)
Access Improvements and Public Parking Facilities
lndudnd in Project Design (Exhibits 3.2-2 and 3.2-3)
Prior to Issuance of the First Public Parking Facilities. Two new public parking facilities Public Works/Engineering
Building Permit for Phase II, will be constructed at opposite sides of The Disneyland Department, Design Division
the East Parking Area will be Resort Specific Plan area to receive traffic from the 1-5. A
Constructed; Prior to Final minimum of 24,500 guest and east parking spaces will be
Building and Zoning provided. The West Parking Area will be oriented to receive
Inspections for the Westcot southbound I-5 traffic, and the East Parking Area will be
Theme Park, the West Parking oriented to receive northbound 1-5 traffic. (PDF 3.3-1)
Area will be Constructed
P~vised 6115193q~ismmp3a. wp
THE DISNEYLAND RESORT SPECIFIC PLAIN 4'
9
Timing Measure Responsible for Monitoring Completion
To be Shown on Street Improved Access. Access roads leading up to the parking Public Works/Engineering
Improvement Plans; to be facilities shall be sized to accommodate traffic at peak hours, Department, Design Division
Implemented Prior to Final thereby substantially reducing the likelihood of backups onto
Building and Zoning City streets and freeway ramps.
Inspections for each the East
and West Parking Structures All guest vehicles will enter and exit the West Parking Area
via the proposed extension of West Street/Disneyland Drive.
Cast access will enter and exit either at West
Street/Disneyland Drive or via a single access on Cerritos
Avenue with right-torn in and left-turn out only. No east or
guest access or egress will occur from Walnut Street.
(PDF 3.3-2)
To be Shown on Street Speed Parking. Direct ramps to each level of the East and Public Works/Engineering
Improvement Plans; to be West Parking Area facilities will minimize internal circulation Department, Design Division
Implemented Prior to Final within the garages and accommodate the project's "speed
Building and Zoning parking' operation. (PDF 3.3-3*)
Inspections for each the East
and West Parking Structures;
and, on-going during project
operation
To be Shown on Street Conveyance Systems. In addition to an extensive network of Public Works/Engineering
Improvement Plans; to be landscaped pedestrian thoroughfares, conveyance systems will Department, Design Division
Implemented Prior to Final transport Disneyland Resort guests around the project.
Building and Zoning Inspection Elevated pedestrian way/people mover/moving sidewalk
for Each Parking Structure systems will transport guests from the East and West public
parking facilities to the Theme Park District. An expanded
monorail system shall move guests from the Hotel District to
the Theme Park District. Future connections may also be
provided to the Future Expansion District. (PDF 3.3-4)
Revised 6/15/93-dismmp3a.wp
THE DISNEYLAND RESORT SPECIFIC PLAN 10
Timing Measure Responsible for Monitoring Completion
To be Shown on Street Theme Park Drop-Off Area. To provide access to the Public Works/Engineering
Improvement Plans; to be aaxactions in the Specific Plan area to people staying outside Department, Design Division
Implemented Prior to Final of The Disneyland Resort area, a bus and shuttle drop-off
Build'rag and Zoning area will be located on Harbor Boulevard at Freedman Way,
Inspections for the WESTCOT or adjacent or internal to the East Public Parking Structure,
Theme Park or other accessible location in the Theme Park District, as
shown on Exhibit 4.4.2a of the Specific Plan. The types of
vehicles served at this facility may include public and private
passenger shuttles and buses. (PDF 3.3-5)
Roadway Improvements Included in Project Design
I-5 - West StreetfDisneylend Drive Southbound Mixed Flow
To be Shown on Street A mixed-flow offramp currently proposed as part of the I-5 Public Works/Engineering
Improvement Plans; to be widening project is planned from southbound I-5 to West Department, Design Division
Implemented Prior to the First Street/Disneyland Drive to replace the existing Ball Road
Final Building and Zoning offramp. Currently, this improvement is planned as part of
Inspections for the WESTCOT the I-5 widening project. However, it will be constructed
Theme Park prior to the Westcot Center Opening. (PDF 3.3-6)
l~vise~ 6/15/93-dismmp3~.wp
THE DISNEYLAND RESORT SPECIFIC PLAN 11
Timing Measure Responsible for Monitoring Completion
West Street/Disneyland Drive/Ball Road Overcrossine
(Exhibits 3.2-3 and 3.2-4)
To be Shown on Street To reduce congestion for vehicles entering the West Parking Public Works/Engineering
Improvement Plans; to be Area from I-5, an overcrossing is planned at West Department, Design Division
Implemented Prior to Final Street/Disneyland Drive and Ball Road. The intersection of
Building and Zoning West Street and Ball Road shall be corotrutted with a two-
Inspections for the WESTCOT lane flyover over Ball Road as a project design feature. The
Theme Park overcrossing would take southbound I-5 traffic exiting at
West Street/Disneyland Drive over Ball Road, and then allow
convenient access to the entrance of the parking facility. The
design of the Ball Road overcrossing shall allow for the
potential future installation of an elevated 'slip rampH
connecting the southbound West Street flyover over Ball
Road to the southbound elevated lanes of West
Street/Disneyland Drive as the lanes pass over the at-grade
parking structure entrance. The project design feature
includes the right-of-way for the potential slip-ramp. When
the Disneyland Resort exceeds 3,500 new project hotel
rooms, the elevated slip ramp may be constructed by the
City.
This overcrossing may be one-way inbound in the morning,
two-way during the afternoon, then one-way outbound during
the outbound peak. Access and egress points will be
provided both north and south of Ball Road. Both the HOV
ramp and the mixed-use off ramp at I-5 and West
Street/Disneyland Drive would have access to the
overcrossing. A full intersection at West Street/Disneyland
Drive will still be provided at grade. When the overcrossing
is one-way, counter-flow movements can be made along West
Street/Disneyland Drive. (PDF 3.3-7)
Revised 6/15/934ismmp3a. wp
THE DISNEYLAND RESORT SPECIFIC PLAN 12
Timing Measure Responsible for Monitoring Completion
West Street/Disneyland Drive Intersections and Turn Pockets
To be Shown on Street To facilitate traffic flow along West Street/Disneyland Drive
Improvement Plans; to be between Katella Avenue and Ball Road, signalized Public Works/Engineering
Implemented Prior to Final intersections will be provided at major hotel entrances. Department, Design Division
Building and Zoning Inspection Appropriate turn pockets including double left-turn lanes and
for the WESTCOT Theme right-turn only lanes will also be provided as needed to
Park ma'mtain acceptable service levels. West Street/Disneyland
Drive itself will have two travel lanes in each direction.
~(PDF 3.3-8)
Freedman Way Widening
To be Shown on Street The addition of the northbound HOV offramp at Freedman Public Works/Engineering
Improvement Plans; to be Way and the realignment of the southbound onramp will Department, Design Division
Implemented in accordance require the widening of Freedman Way between Harbor
with the approved Phasing Boulevard and Clemenfine Street; Clementine Street to I-5.
Plan Three concrete through lanes, where possible, and necessary
turn lanes in each direction will be provided. (PDF 3.3-9)
Speed/Capacity Restrictions on Walnut Street
To be Shown on Street Between Cerritos Avenue and Ball Road, Walnut Street will Public Works/Engineering
Improvement Plans; to be be improved adjacent to the strawberry field in accordance Department, Design Division
Implemented Prior to Final with the City of Anaheim General Plan Circulation Element.
Buffding and Zoning Inspection To discourage any increase in traffic on Walnut Street, the
for the WESTCOT Theme capacity of the road will be restrained, from Katella Avenue
Park to Ball Road. Possible methods include narrowing the street
entrances at Katella Avenue and Ball Road and replacing the
existing signal with a stop sign at the existing intersection of
Walnut Street and Cerritos Avenue. This and other options
will be evaluated, and a plan to maintain the current
character of Walnut Street will be developed. (PDF 3.3-10)
Revised 6/15/93-dismmp3a.wp
THE DISNEYLAND RESORT SPECIFIC PLA~ 13
Timing Measure Responsible for Monitoring Completion
Cerritos Avenue Realignment
To be Shown on Street With the development of the Hotel District, Cerritos Avenue Public Works/Engineering
Improvement Plans; to be between Walnut Street and West Sweet/Disneyland Drive will Department, Design Division
Implemented Prior to Final be moved approximately 1,000 to 1,100 feet to the north and
Building and Zoning Inspection will be renamed. The new roadway will be two lanes wide
for the WESTCOT Theme and will be designed to discourage access from or onto
Park Walnut Street. Southbound left tums will not be allowed at
the Walnut Street/Cerritos Avenue intersection. Westbound
Cerritos Avenue left turns at Walnut Street will not be
allowed. (PDF 3.3-11)
I-5-West Street/Disneyland Drive Southbound HOV Offramp
To be Shown on Street Caltrans' I-5 Widening Project includes a new HOV offramp Caltrans; Public Works/
Improvement Plans; to be from southbound I-5 to West Street/Disneyland Drive. This Engineering Department,
Implemented by Caltrans in ramp would be built at the same time as the I-5 Widening Design Division
conjunction with the I-5 Project. The ramp will bring high occupancy vehicles
Widening Project. (The I-5 (HOVs) conveniently from the HOV lane in the median of
High Occupancy Vehicle I-5 to the West Parking Area. (PDF 3.3-12)
(HOV) Offramps are part of
Caltrans' I-5 Widening Project
and will be completed
independent of The Disneyland
Resort Project. The HOV
ramps were not assumed in the
analysis of traffic impacts of
the Westcot Center and are not
required as a condition of the
opening or operation of the
Westcot Center.)
Revised 6/15/93~lismrnp3a.wp
THE DISNEYLAND RESORT SPECIFIC PLAN 14
Timing Measure Responsible for Monitoring Completion
I-5/Freedman Way Northbound HOV Offramp
To be Shown on Street Caltrans' I-5 Widening Project includes a proposed HOV Caltrans; Public Works/
Improvement Plans; to be offramp connecting the northbound HOV lanes on 1-5 to Engineering Department,
Implemented by Caltrans in Freedman Way and an undercrossing of Anaheim Boulevard Design Division
conjunction with the 1-5 to Freedman Way. This ramp will carry a substantial
Widening Project. (The I-5 number of vehicles to the East Parking Area and remove
High Occupancy Vehicle them from Harbor Boulevard and Katella Avenue.
(HOV) Offramps are part of
Caltrans' I-5 Widening Project This ramp (shown in Exhibit 3.2-2 of Volume I of the EIR)
and will be completed will allow northbound I-5 traffic to access the parking facility
independent of The Disneyland conveniently from the fleeway and also provide access for
ResoR Project. The HOV other vehicles to Harbor Boulevard. It will improve the level
ramps were not assumed in the of service of the section of Katella Avenue crossing I-5, as
analysis of traffic impacts of well as the intersections of Katella Avenue with Anaheim
the Westcot Center and are not Boulevard, Haster Street, Clementinc Street, and Harbor
required as a condition of the Boulevard. The ramp is discussed in detail in Appendix C-l,
opening or operation of the Volume IlI. (PDF 3.3-13)
Westcot Center.)
Intersection Improvements Included in Project Design
To be Shown on Street The following intersection improvements, which are assumed Public Works/Engineering
Improvement Plans; to be in the analysis of project traffic, will be implemented unless Department, Design Division
Implemented Prior to Final otherwise indicated by the year 2000 (Opening of WESTCOT
Building and Zoning Inspection Center) as part of the project design that will enhance the
for the WESTCOT Theme overall performance of the surrounding circulation system:
Park
· Redesign and reconstruct the intersection of Ball
Road/West Street/Disneyland Drive to include an
overcrossing.
· Redesign the Harbor Boulevard/Freedman Way
intersection by removing the entrance to the surface
parking lot and adding double left-turn lanes southbound.
Revised 6/15/93-dismmp3a. wp
THE DISNEYLAND RESORT SPECIFIC PLAN 15
Timing Measure Responsible for Monitoring Completion
· At the intersection of Haster Street and Freedman Way,
add a third through lane eastbound and westbound and a
second left-turn lane eastbound, or equivalent
improvements as defined by Caltrans during the final
geometric design of the I-5 interchange.
· At the intersection of Clementine Street and Freedman
Way, add the following improvements or equivalent
improvements as defined by Caltrans during the final
geometric design of the I-5 interchange:
third through lanes eastbound and westbound
left-turn lanes eastbound and westbound
second through lanes northbound and southbound
left-turn lane southbound
remove right-turn lane northbound
· Reconfigure the Walnut Street/Cerritos Avenue
intersection.
· Reconfigure the West Street/Disneyland Drive/Cerritos
Avenue intersection to satisfaction of the City Engineer.
(PDF 3.3-14)
Rcvisext 6/15/93~li~mmp3a. wp
Timing Measure Responsible for Monitoring Completion
Transportation Demand Management Program
Prior to Final Building and The need to minimize cast vehicle trips to reduce congestion Southern California
Zoning Inspection for the and improve air quality, consistent with the goals of both the Association of Governments;
WESTCOT Theme Park; and, Air Quality Management Plan (AQMP) of the South Coast South Coast Air Quality
on-going dur'mg project Air Quality Management District (SCAQMD) and with the Management District; Public
operation Regional Mobility Plan of the Southern California Works/Engineering
Association of Governments (SCAG), is recognized. The Department, Traffic
Disneyland Resort will implement and administer a Engineering Division
comprehensive Transportation Demand Management CIDM)
program for all cast, which will strive to achieve an average
vehicle ridership (AVR) goal of 1.5 persons per vehicle and,
an average length of out-of-area guest stay of 1.72 days, by
2000.
At this point in project development, it is not possible to
predict precisely which programs and activities would be
most successfid for The Disneyland Resort in meeting these
goals. In addition, applicant will review annually with the
City any changes to the TDM Program and the Program's
effectiveness toward achieving a 1.5 AVR. In consultation
with the SCAQMD, the City of Anaheim and other agencies,
and after analyzing the effectiveness of these items, The Walt
Disney Company will select specific programs for
implementation.
Revised 6/15/93~liammp3a.wp
THE DISNEYLAND RESORT SPECIFIC PLAN 17
Timing Measure Responsible for Monitoring Completion
Objectives of the TDM program are:
·Increase ridesharing and use of alternative transportation
modes by guests.
· Meet the east 1.5 AVR target.
· Provide a menu of commute alternatives for The
Disneyland Resort east, to reduce project-generated trips.
· Provide transportation N!inkagesN tO existing and future
transportation modes (other than single-occupant vehicle
travel) for both The Disneyland Resort east and guests.
Implementation strategies and elements of the TDM program
for east and guest trips are described below.
Cast
Making a commitment to commute management and trip
reduction will become an integral part of the new-hire
training. A menu of TDM program strategies and elements
for both existing and future east commute options would be
examined, including, but not limited to, the following:
·Ohsitc Service. Onsite services, such as the food, retail,
and other services may be provided to the east.
· Ridesharing. A computer listing of all cast members may
be developed for the purpose of providing a Nmatching" of
members with other cast members who live in the same
geographic areas and who could rideshare to The
Disneyland Resort.
Revised 6/15/93-dismmp3a.wp
Timing Measure Responsible for Monitoring Completion
· Vanm>oline. A computer listing of all cast members may
be developed for the purpose of matching numbers of cast
who live in geographic proximity to one another and could
comprise a vanpool to The Disneyland Resort.
· Transit Pass. Southern California Rapid Transit District
and Orange County Transportation Authority (including
commuter rail) passes may be promoted through financial
assistance and onsite sales to encourage cast to use the
various transit and bus services to The Disneyland Resort
from throughout the region.
· Commuter Bus. As commuter rexpress' bus service
expands throughout the region, passes for use on these
lines may be provided for east members who choose to
use this service. Financial incentives will be provided.
· Shuttle Service. A computer listing of all east members
living in proximity to The Disneyland Resort may be
generated, and a local shutfie program will be offered to
encourage cast members to travel to work by means other
than the automobile.
· Bicvclin£. A Disneyland Resort Bicycling Program may
be developed to offer a bicycling alternative to cast
members. Secure bicycle racks, lockers, and showers will
be provided as part of this program. Maps of bicycle
routes throughout the area would be provided to inform
potential bicyclists of these options.
· Rental Car Fleet. A "fleet vehicle~ program may be
developed to provide east members who travel to work by
means other than an automobile with access to automobiles
in case of emergency, medical appointments, etc. This
service would help east members use alternative modes of
transportation by ensuring that they would be able to have
personal transportation in the event of special
circumstances.
Revised 6/15/934ismmp3a. wp
THE DISNEYLAND RESORT SPECIFIC PLAN 19
Timing Measure Responsible for Monitoring Completion
· Guaranteed Ride Home Program. The program may
provide cast members who rideshare, or use transit or
other means of commuting to work, with a prearranged
ride home in a taxi, rental car, shuttle, or other vehicle, in
the event of emergencies during the work shift. In
essence, this program addresses the concerns of the cast
member who rideshares and might be stranded without a
vehicle in the event of an emergency.
· Housing Coordinator and Referral Program and Local
Hiring Efforts. Continue to provide referral service to
facilitate employees in finding housing and actively recruit
prospective employees residing within 30-minute commute
· Target Reduction of Longest Commute Trip. Design an
incentives program for ridesharing and other alternative
transportation modes to put highest priority on reduction
of longest employee commute trips.
Revised 6/15/93-dismmp3a.wp
THE DISNEYLAND RESORT SPECIFIC PLAin ( 20
Timing Measure Responsible for Monitoring Completion
·Work Schedule
Staggered Shifts. The Disneyland Resort cast may
work different hours throughout the daily hours of
park operation. A thorough review of east shifts
would be undertaken to provide the potential for cast
shifts during nonpeak travel times, thus lessening peak
hour congestion.
Compressed Work Week. The Disneyland Resort may
review the possibility of developing a "compressed
work week" program, which provides for fewer work
days but longer daily shifts, as an option for east
members. This program would help eliminate certain
trips on certain days that would otherwise be generated
daily by The Disneyland Resort Cast.
Telecommuting. The Disneyland Resort employs a
variety of east in different positions, cast members
include clerical, office support, and administrative
members. The Disneyland Resort may explore the
possibility of a "telecommuting" program that would
link some of these cast members to The Disneyland
Resort via electronic means (e.g., computer with
modem). This would help to eliminate certain trips
that would otherwise be generated by a east member
who would otherwise physically need to be at The
Disneyland Resort.
· Work Environment/Facility Management
Parking Management. The Disneyland Resort may
develop a parking management program that provides
incentives to those who rideshare or use transit means
other than single-occupant auto to travel to work.
R~vis~d 6/15/93-diammp3a.wp
¢
THE DISNEYLAND RESORT SPECIFIC PLAN 21
Timing Measure Responsible for Monitoring Completion
Management Staff. The existing Disneyland theme
park transportation management staff may be expanded
onsite to accommodate new employees and to explore
relationships with adjacent employers to determine
whether joint efforts can lead to greater reductions in
VMT by project employees.
Amenities. Transit systems, transit shelters, bicycle
storage areas, and other amenities may be provided
with efficient parking management for cast and guests.
Access. Preferential access to high occupancy
vehicles and shuttles may be provided.
Delivery Manaeement. Schedule deliveries in nonpeak
traffic congestion hours to the extent reasonably
practicable.
· Financial Incentives
In addition to the above items, certain financial incentives
will be integrated into The Disneyland Resort TDM program,
such as:
Financial Incentive for Rideshar'mg and/or Public
Transit. Currently, federal law provides tax-free
status for up to $60 per month per employee
contributions to employees who vanpool or use public
transit (including commuter rail and/or express bus
pools).
Revised 6/15/93~llsmmp3a.,,~
THE DISNEYLAND RESORT SPECIFIC PL 'A~I~ ~
22
Timing Measure Responsible for Monitoring Completion
Financial Incentive for Bicycling. Cast members may
be offered financial incentives for bicycling to work;
they would be provided with secure bicycle racks,
lockers, and showers.
Special "Premium" for the Participation and
Promotion of Trip Reduction. Tickets/passes to
project theme parks and/or vacations could be offered
to employees who recruit other cast members for
vanpool, carpeel, or other Disney trip reduction
program~.
Delivery Management. Schedule deliveries in non-
peak traffic congestion hours to the extent reasonably
practicable.
· Guests
Even though visitors are estimated to average nearly four
persons per vehicle, additional program~ and incentives could
and will be provided to encourage even more guest use of
ridesharing, transit, and other modes of travel to and from
The Disneyland Resort. The applicant is currently
developing a list of potential programs and is working with
the City of Anaheim and OCTA on the provision of
convenient linkages to other modes of transportation.
Marketing materials for The Disneyland Resort will describe
it as an "auto-free" zone with a range of transportation
amenities where cars are not needed. (PDF 3.3-15')
Revised 6/15/93-dismmp3a.wp
THE DISNEYLAND RESORT SPECIFIC PLAN 23
Timing Measure Responsible for Monitoring Completion
Transportation Management Association
Prior to Final Building and Other measures to achieve trip reductions and other TDM Public Works/Engineering
Zoning Insp~cion for the program objectives will be explored, including the formation Department, Traffic
WESTCOT Theme Park of a Disneyland Resort Transportation Management Engineering Division
Association (TMA), or a Commercial-Recreation Area TMA.
To increase the likelihood of success of the TDM program,
cooperation among other groups and bnsihesses who either
have existing TDM programs or have a need for TDM
programming could be networked with cast participants. By
expanding the number of participants in the various
program% more benefit in trip reduction is likely to be
achieved. The TMA would be responsible for matching cast
and guest commute services; marketing/promoting
ridesharing alternatives (i.e., vanpooling, bicycling, etc.);
and providing a 'fair share' payment of local TDM programn
provided through the TMA. (PDF 3.3-17)
MR QUALITY
Varies The applicant shall implement all project design features or Refer to Note #7 on page 1.
their environmental equivalent. The City of Anaheim
Planning Department will ensure compliance through the
mitigation monitoring process. (3.4-1)
Prior to Issuance of Each The property owner/developer shall comply with all South Coast Air Quality
Building Permit SCAQMD offset regulations and implementation of Best Management District;
Available Control Technology (BACT) for all permitted new Planning Department,
and modified stationary sources. Copies of permits shall be Planning Division
given to the Planning Department. 0.4-2)
RevL~xl 6/15/93~ti~mmp3a.wp
THE DISNEYLAND RESORT SPECIFIC PLAI~ {'
24
Timing Measure Responsible for Monitoring Completion
Ongoing During Operation of The applicant shall implement the following measures to Public Works/Engineering
the WESTCOT Center reduce emissions: Depas hnent, Traffic
Engineering Division
1. To the extent practicable, schedule goods movements for
off-peak traffic hours.
2.Use clean fuel for attraction rides and other uses, as
practicable. (3.4-3*)
Prior to Issuance of the First The applicant shall submit a site and operations plan for this Planning Department,
Building Permit for the facility showing the location and configuration of the child Planning Division
WESTCOT Theme Park care facility and conformance with the Specific Plan.
Prior to Final Building and The applicant shall provide a child care facility within the
goBinE Inspections for the Theme Park District or Hotel District to accommodate up to
WESTCOT Theme Park 150 children of cast members. Said facility may be
constructed in the Theme Park District by right and will be
subject to the approval of a CUP if provided in the Hotel
District. (3.4-4)
Prior to Issuance of Each The property owner/developer shall submit evidence that low South Coast Air Quality
Building Permit emission paints and coatings are utilized in the design and Management District;
construction of buildings in compliance with AQMD Planning Department,
regulations. This information shall be denoted on the project Building Division
plans and specifications. (3.4-5)
Prior to Issuance of the First The following will be achieved: (1) the 1.5 AVR target for South Coast Air Quality
Building Permit for the Future all east and (2) the average length of the out-of-area guest Management District;
Expansion District, Excluding stay of 1.72 days, or a demonstration that the SCAG VMT Southern California
the South Parking Area; and, reduction targets have been met through other means. 0.4-6) Association of Governments;
Ongoing During Project Public Works/Engineering
Operation Department, Traffic
Engineering Division
Re~eis~t 6/15/93-di~mmp3a.wp
THE DISNEYLAND RESORT SPECIFIC PLAN 25
Timing Measure Responsible for Monitoring Completion
Prior to Final Building and The project has been designed to reduce dependence on the Public Works/Engineering
Zoning Inspection for the private automobile, which will reduce and avoid many of the Department, Traffic
WESTCOT Theme Park; and traffic-related emissions associated with the existing Engineering Division
Ongoing During Project Disneyland theme park, as well as those normally associated
Operation with hotels and day-use only special event activities. Guests
will be encouraged to park their cars and leave them for the
duration of their visits, thus eliminating the trips to
restaurants and sightseeing, or enter*alnment attractions
normally associated with vacation stays. Marketing efforts in
Southern California will promote The Disneyland Resort as a
mini-vacation site for Southland residents. (PDF 3.4-2*)
Prior to Final Building and A wide range of entertainment, lodging, retail and restaurant Planning Department,
Zoning Inspection for the attractions will be located within the project area and will be Planning Division
WESTCOT Theme Park linked by an extended electrically powered monorail system,
pedestrian ways/people movers/moving sidewalks to transport
visitors from parking facilities to The Disneyland Resort,
and/or pedestrian bridges, walkways and promenades.
Convenient walkway access within the Hotel District and
adjacem uses, such as the City of ~,naheim Convention
Center, will also facilitate pedestrian trips by non-project
guests who will remain within the project area rather than use
automobiles to travel to restaurants and entertainment outside
of the area. (PDF 3.4-3)
In Accordance with The Disneyland Resort traffic will be accommodated, and Public Works/Engineering
Transportation and Circulation existing traffic conditions and circulation patterns will be Department, Traffic
Mitigation Measures improved through implementation of a transportation and Engineering Division
parking plan (for the parking structures, monorail and
pedestrian way/people mover/moving sidewalks) which
includes convenient access to parking facilities from the
freeway. (PDF 3.44)
Revi~d 6/15/93-dismmp3a.wp
THE DISNEYLAND RESORT SPECIFIC PLA~ {'
26
Timing Measure Responsible for Monitoring Completion
Prior to Issuance of Building The East and West public parking facilities will incorporat~ Public Works/Engineering
Permits for Each of the East the following design features, in addition to providing a crew Department, Traffic
and West Public Parking of cast members, based on parking predictions, on each lot or Engineering Division
Facilities; Ongoing During facility level, to assist speed parking procedures:
Project Operation
1. Signage designed to enhance smooth traffic flows and
reduce traffic flows on each facility level.
2. Sp~d ramps which will take cars directly to the level that
has available spaces, thus eliminating circulation
movemere and time involved with hunting for a space.
The speed parking striping and procedures currently used
at the Disneyland theme park parking lot will be adapted
to use within the parking structures and will be designed
to safely park 60 cars per minute. (Refer to Section 7.0,
Zoning and Development Standards, in the Disneyland
Resort Specific Plan.)
3. Ceiling clearances and lateral clearances, an open well
design, and enhanced lighting levels will eliminate the
enclosed feeling of a standard garage, which tends to slow
drivers. (PDF 3.4-5*)
Prior to Issuance of Each Project design will incorporate the following energy-saving Utilities Department, Water
Building Permit features. This energy savings will also contribute to reduced and Electric Services
emissions:
1. Improved thermal integrity of structures and reduced
thermal load through use of automated time clocks or
occupant sensors.
2. Efficient heating and other appliances.
3. Incorporation of appropriate passive solar design.
Revised 6/15/93<limm~p3a.wp
¢
THE DISNEYLAND RESORT SPECIFIC PLAN
27
Timing Measure Responsible for Monitoring Completion
4. Proper sealing of buildings.
5. Use of drought-resistant landscaping wherever feasible to
reduce energy used in pumping and transporting water.
(PDF 3.4-6)
Prior to Final Building and There will be a special drop-off area on Harbor Boulevard at Public Works/Engineering
Zoning Inspection for the Freedman Way, or internal or adjacent to the East Public Department, Traffic
WESTCOT Theme Park Parking Structure, or other accessible location, for shuttle Engineering Division
buses to help encourage use of buses by area visitors. (PDF
· 3.4-7)
Prior to Final Building and The applicant will implement a comprehensive and aggressive Public Works/Engineering
Zoning Inspections for the Transportation Demand Management (TDM) program for all Department, Traffic
WESTCOT Theme Park; project employees, including those not presently covered by Engineering Division
Ongoing during Project SCAQMD Regulation XV (because they do not arrive at
Operation work between 6 and 10 a.m.). (PDF 3.4-8*)
NOISE
Varies The applicant shall implement all project design features or Refer to Note g'/on page 1.
their environmental equivalent. The City of Anaheim
Planning Department will ensure compliance through the
mitigation monitoring process. (3.5-1)
Ongoing During Project The applicant shall obtain (on an annual basis) a permit for Fire Department
Operation of the WESTCOT use of fireworks. (3.5-2*) Planning Department, Code
Theme Park Enforcement Division
Prior to Issuance of Building Plans submitted for the location of the amphitheater will Planning Department,
Permit for Amphitheater document that the facility is no closer than 2,000 feet from Building Division
the nearest existing residence. The design and orientation of
the amphitheater will be reviewed by a certified acoustical
engineer; the applicant shall submit a report, for review and
approval by the City, to ensure that noise from the
amphitheater does not exceed the noise levds established by
the City of Anaheim Sound Pressure Level Ordinance.
(3.5-3)
~ 6/15/93~lismmp3a.wp
THE DISNEYLAND RESORT SPECIFIC PL 28
Timing Measure Responsible for Monitoring Completion
Prior to Final Building and A Noise Monitoring Program prepared by a certified Planning Department,
Zoning Inspection for the acoustical engineer shall be submitted for review and Planning and Building
Amphitheater. approval. Divisions
Within 9 Months of The applicant shall submit the results of the Noise
Commencement of Monitoring Program conducted by a certified acoustical
Amphitheater Operations engineer to ensure that there are no violations of the Sound
Pressure Level Ordinance from amphitheater operations
outside The Disneyland Resort. If noise in excess of the
Sound Pressure Level Ordinance is detected, the applicant
shall modify operations within three days to bring the
Amphitheater into conformance with the Sound Pressure
Level Ordinance. 0.54)
Prior to Approval of Each For hotels within the 70 CNEL contour from West Planning Department,
Final Site Plan; to be Street/Disneyland Drive, the property owner/developer shall Building Division
Implemented Prior to Final submit a noise study prepared by a certified acoustical
Building and Zoning engineer identifying whether noise attenuation is required,
Inspections and defining any attenuation measures and specific
performance criteria, if any such measures are required to
comply with the Uniform Building Code. Ultimate noise
attenuation requirements, if any, shall depend on the final
locations of such buildings and noise-sensitive room/nses
inside the buildings. (3.5-5)
Prior to Issuance of Each For construction of the public parking facilities, South Planning Department,
Building Permit Parking Area facility, and any hotel parking facilities Building Division
adjacent to residential areas, plans shall document that the
driving surfaces shall be a textured surface to minimize tire
squeal noise. 0.5-6)
Ongoing During Project Engine noise from sweeping equipment used in the public Planning Department,
Operations of the WESTCOT parking facilities, South Parking Area facilities and any hotel Building Division
Theme Park parking facilities adjacent to residential areas shall be
muffled. 0.5-7*)
Revised 6/15/93-di~nmp3a. wp
THE DISNEYLAND RESORT SPECIFIC PLAIN {' 29
Timing Measure Responsible for Monitoring Completion
Prior to Issuance of Each For structures that are adjacent to residential areas, the Planning Department,
Building Permit; to be applicant shall ensure that all mechanical ventilation units are Building Division
Implemented Prior to Final shown on plans and installed in compliance with the Sound
Building and Zoning Pressure Level Ordinance. (3.5-8)
Inspections
Ongoing During Project Lower noise-producing fireworks displays will be used at planning Department, Code
Operations WESTCOT Center to minimize noise from 11:00 p.m. Enforcement Division
fireworks shows to meet the noise levels in the City of
Anaheim Sound Pressure Level Ord'mance. (PDF 3.5-1')
Prior to Issuance of Building Noise from the west public parking facility adjacent to Planning Department,
Permit for the West Public Walnut SWeet will be reduced by the provision of convenient Building Division
Parl:ing FaCility to be access to the parking facility, sound attenuation devices
Imple~aanted Prior to Final (1ouvers and walls), the use of textured deck surfaces to
Building and Zoning Inspection reduce tire squealing, and tiering the parking facility in the
for the WESTCOT Theme West Parking Area above the third floor to provide greater
Park distance to the receptors. Noise from the West Public
Parking Facility adjacem to the Conestoga Hotel will be
reduced by the provision of sound attenuation louvers in the
openings on the north side of the stxucture adjacent to the
Conestoga Resort. (PDF 3.5-2)
SEISMICITY
Prior to Approval of Each The property owner/developer shall submit a thorough soils Public Works/Engineer'mg
Grading Plan and geological report for the area to be graded, based on Department, Development
proposed grading and prepared by an engineering geologist Division
and geotechnical engineer. The report shall comply with
Title 17 of the Anaheim Municipal Code. (3.6-1)
Prior to Issuance of Each The property owner/developer shall submit for review and Planning Department,
Building Permit approval detailed foundation design information for the Building Division
subject buildings, prepared by a civil engineer, based on
recommendations by a gcotechnical engineer. (3.6-2)
Revlaed 6115193-dismn~3a. wp
THE DISNEYLAND RESORT SPECIFIC PLAN 30
Timing Measure Responsible for Monitoring Completion
Prior to Issuance of Each The property owner/developer shall submit a report prepared Planning Department,
Foundation Permit by a geoteehnical engineer for review and approval which Building Division
shall investigate the subject foundation excavations to
determine if soft layers are present immediately beneath the
footing site and to ensure that compressibility does not
underlie the footing. 0.6-3)
Prior to Issuance of Each The property owner/developer shall submit plans showing Planning Dep~uhuent,
Building Permit that the proposed structure has been analyzed for earthquake Building Division
loading and designed according to the most recent seismic
standards in the Uniform Building Code adopted by the City
of Anaheim. (3.64)
Ongoing During Project The property owner/developer shall coordinate earthquake Fire DeparUnent
Operations training with the Fire DeparUneat for hotel staff and cast
members. (3.6-5*)
Prior to Issuance of Each For hotels, the property owner/developer shall submit an Fire Department
Building Permit earthquake emergency response plan for review and
approval. That plan shall require posted notices in all hotel
rooms on earthquake safety procedures. 0.6-6)
GROUNDWATER AND SURFACE HYDROLOGY
Varies The applicant shall implement all project design features or Refer to Note gI on page 1.
their environmental equivalent. The City of Anaheim
Planning Depamnent will ensure compliance through the
mitigation monitoring process. (3.7-1)
THE DISNEYLAND RESORT SPECIFIC PLAN 31
Timing Measure Responsible for Monitoring Completion
Prior to Approval of Phase I Excluding the Disneyland Administration Building, the Orange County
Grading Plan; to be property owner/developer shall submit a Master Drainage and Environmental Management
Implemented in Accordance Runoff Management Plan (MDRMP) for review and Agency; Regional Water
with the Phasing Plan approval. The Master Plan shall include, but not be limited Quality Control Board;
to, the following items: Caltrans; Public Works/
Engineering Department,
a. Backbone storm drain layout and pipe size, including Development Division
supporting hydrology and hydraulic calculations for storms
up to and including the 100-year storm.
b. A delineation of the improvements to be implemented for
control of project-generated drainage and runoff.
c. Detailed assessment of existing water quality, potential
water quality impacts, and a description of proposed
measures to maintain water quality to the extent required
by the National Pollutant Discharge Elimination System
(NPDES) and its regulations, including the following:
1. Incorporation of stmctoral and nonstructural City-
controlled Best Management Practices (BMPs). BMPs
shall, to the extent permiRed by law, include, but are not
limited to, containment of masonry and paint wastes on
the construction site; proper disposal of vehicle fuel and
maintenance wastes; disposal of trash and debris;
prohibiting water wash down of paved areas (both during
and after construction unless allowed by the N'PDES
permit); and education/trlaining for construction workers
on these practices. Engineering details, maintenance
procedures, and funding responsibilities of these BMPs
shall also be described.
2. Incorporation of measures to comply with applicable
actions to be identified by the RWQCB in conformance
with the State Water Resources Control Board (SWRCB)
statewide water quality control plan for inland surface
waters, adopted April 11, 1991.
R~vi~d 6/15/93<lismmp3a.wp
¢ 1
THE DISNEYLAND RESORT SPECIFIC PLAN 32
Timing Measure Responsible for Monitoring Completion
3. Description of a water quality monitoring program to
monitor water quality during and subsequent to
construction and to evaluate the effectiveness of BMPs.
The water quality monitoring program shall identify: (1)
the person/agency responsible for implementing the
program, (2) sources of pollutants in runoff (e.g.,
nuisance flows from development areas, h'rigafion flows),
(3) specific types of pollutants expected in runoff that will
be monitored (e.g., total suspended solids, phosphorous,
lead), (4) water quality sampling stations that are
representative of runoff from the sources identified above,
(5) sampling program methodology, including devices to
be used and frequency and duration of sampling, (6)
method for evaluating data collected from a sampling
program, including threshold standards for determining
effectiveness of BMPs, and (7) add'm'onal measures, if
necessary, to increase the effectiveness of the BMPs to the
threshold standards identified in C(1) above. (3.7-2)
Prior to Issuance of Each The property owner/developer shall submit landscaping and Public Utilities, Water
Building Permit irrigation plans and an Irrigation Management Program to Services
integrate and phase the installation of streetscape landscaping
with the proposed construction schedule. This landscape plan
shall include a maintenance program to control the use of
fertilizers and pesticides, and an irrigation system designed to
minimize surface runoff and overwatering. Additionally:
a. The landscape plans shall be prepared and certified by a Parks, Recreation, and
licensed landscape architect. The landscape architect shall Community Services
submit plans in accordance with Anaheim's Landscape Department, Parks Division
Water Efficiency Ordinance and Guidelines.
R ~vised 6115/93.dismmp3a. wp
THE DISNEYLAND RESORT SPECIFIC PLAN 33
Timing Measure Responsible for Monitoring Completion
b. The Irrigation Management Program shall specify methods Utilities Department, Water
for monitoring the irrigation system and shall be designed Services; Planning
by an irrigation engineer (plans to be submitted in Deparm~ent, Planning
accordance with the Specific Plan). The system shall Division
ensure that irrigation rates do not exceed the infiltration of
local soils and that the application of fertilizers and
pesticides do not exceed appropriate levels of frequencies.
c. The landscape and irrigation plans shall be developed to Utilities Department, Water
be consistent with the provisions of the Specific Plan, Services
which require that the maximum annual water allowance
for the project (excluding theme parks) not exceed 80
percent of the mean annual evapotranspirafion, or that the
landscape irrigation system include water-conserving
features such as low-flow irrigation heads, automatic
irrigation scheduling equipment, flow sensing controls,
rain sensors, soil moisture sensors, and other water-
conserving equipment. in addition, all irrigation systems
shall be designed so that they will function properly with
reclaimed water, if it should become available. 0.7-3)
Ongoing During Operation of The applicant shall provide for the following: cleaning of all Maintenance Department
the WESTCOT Center paved areas not maintained by the City of ~Anaheinl
including, but not limited to, private streets and parking lots
on not less than a monthly basis. Using water to clean
streets, parking lots, and other areas shall be allowed on a
periodic basis if allowed in the applicant's NPDES permit.
Nightly washdown shall be allowed in the theme parks and,
where advisable to maintain safe and sanitary working
conditions, the back-of-house area, if allowed in the
applicant's and City's NPDES permit. Flushing debris,
residue, and s~iment down the storm drams shall conform to
the applicant's NPDES requirements. Applicant agrees that
material deposited in City storm drains shall not be in
violation of the City's NPDES permit. (3.7-4*)
R~vi~d 6/15/93~li,~m~p3a. wp
THE DISNEYLAND RESORT SPECIFIC PLAN 34
Timing Measure Responsible for Monitoring Completion
Prior to Each Final Building The property owner/developer shall submit a Certificate of Planning Department,
and Zoning lnsl~-~tion Substantial Completion, as described in the Specific Plan, Planning Division
which establishes that the landscape irrigation systems have
been installed as specified in the approved landscaping and
irrigation plans. (3.%5)
To be Installed With Project To reduce the project's demand on potable water, the Utilities Department, Water
Water Mains to be Connected property owner/developer shall install water lines onsite so Services
if Reclaimed Water Becomes that reclaimed water may be used for landscape irrigation and
Available other purposes, if and when it becomes available. (PDF
3.7.1)
CON~I~UCTION IMPACTS
Varies The applicant shall implement all project design features or Refer to Note gel on page 1.
their environmental equivalent. The City of Anaheim
Planning Department will ensure compliance through the
mitigation monitoring process. (3.8-1)
Ongoing During Grading The property owner/developer shall implement standard Public Works/Engineering
Operations practices from all applicable codes and ordinances to prevent Department, Development
erosion. (3.8-2*) Division
Prior to Approval of Each The property owner/developer shall obtain required NPDES State Water Resources
Grading Plan construction storm permits from the State Water Resources Control Board; Public
Control Board, if applicable. Copies of the Notice of Intent Works/Engineering
or permits, as applicable, shall be submitted to the City Department, Developm~t
Engineer. (3.8-3) Division
Ongoing During Construction The following measures will be follow~l by the propeaXy Planning Department,
owner/developer to reduce air quality impacts: Building Division; Public
Works/Engineering
a. Normal wetting procedures or other dust palliative Department, Development
measures shall be followed during earth-moving operations Division
to minimize fugitive dost emissions, in compliance with
the City of Anaheim Municipal Code.
Revised 6/15/93~lismmp3a.wp
THE DISNEYLAND RESORT SPECIFIC PLAN 35
Timing Measure Responsible for Monitoring Completion
b. Roadways adjacent to the project shall be swept and
cleared of any spilled export material at least twice a day
to assist in mi~imiT/mg fugitive dust; haul routes shall be
cleared as needed if spills of material exported from the
project site occur.
c. Where practicable, heavy duty construction equipment
shall be kept onsite when not in operation to minimiTe
exhaust emissions associated with vehicles repetitionsly
entering and exiting the project site.
d. Tracks importing or exporting soil material and/or debris
shall be coverad prior to entering public sweets.
e. Manually irrigate or activate irrigation systems necessary
to water and maintain the vegetation as soon as planting is
completed.
f. Reduce traffic speeds on all unpaved road surfaces to 15
miles per hour or less.
g. Suspend all grad'rag operations when wind speeds (as
instantaneous gust) exceed 25 miles per hour and during
second stage smog alerts.
h. The project will comply with the SCAQMD Rule 402,
which states that no dust impacts offsite are sufficient to
be called a nuisance, and SCAQMD Rule 403, which
restricts visible emissions from construction.
i. Use low emission mobile consauction equipment (e.g.,
tractors, scrapers, dozers, etc.) where practicable.
j. Util'~.e existing power sources (e.g., power poles) or
dean-fuel generators rather than temporary power
generators, where practicable.
l~vis, ed 6/15/9 3 ~istmnp3a,~,vp
THE DISNEYLAND RESORT SPECIFIC PL 36
Timing Measure Responsible for Monitoring Completion
k.Maintain construction equipment engines by keeping them
properly tuned.
1.Use low sulfur fuel for equipment, to the extent
practicable. (3.8-4*)
Prior to Approval of Each Other than for the Disneyland Administration Building or the Public Works/Engineering
Grading Plan (for Import/ reiocation of the SCE transmission lines, the property Department, Traffic
Export Plan) and Prior to owner/developer shall submit Demolition and Import/Export Engineering Division
Issuance of Demolition Permit Plans. The plans shall include identification of offsite
(for Demolition Plan) locations for material export from the project and options for
disposal of excess material. These options may include
recycling of materials onsite, sale to a soil broker or
contractor, sale to a project in the vicinity or transport to an
environmentally cleared landfill, wi~ attempts made to move
it within Grange County. The applicant shall offer recyclable
building materials, such as asphalt or concrete for sale or
removal by private firms or public agencies for use in
construction of other projects, if not all can be reused on the
project site. (3.8-5)
Ongoing During Construction The property owner/developer shall implement the following Air Quality Management
to limit emissions from architectural coatings and asphalt District; Planning
usage: Department, Building
Division
a. Use nonsolvent-based coatings on buildings, wherever
appropriate.
b.Use solvent-based coatings, where they are necessary, in
ways that minimize solvent emissions.
c.Encourage use of high-solid or water-based coatings.
(3.8-6*)
Revised 6/15/93-dismmp3a. wp
Timing Measure Responsible for Monitoring CompleXion
Ongoing During Demolition Construction noise shall be limited by the property Planning Department,
and Construction owner/developer to 60 dBA along the property boundaries of Building Division
The Disneyland Resort Specific Plan area before 7:00 a.m.
and after 7:00 p.m. as governed by Chapter 6.7, Sound
Pressure Levels, of the Anaheim Mum'cipal Code. (3.8-7*)
Prior to Issuance of Building For the parking facility in the West Parking Area or any Planning Department,
Permit parking structure in the Hotel District and the South parking Building Division
Area, an 8-foot perimeter or portable construction barrier
along streels adjacent to construction areas, to be in place
' during construetrion, shall be provided to minimize noise
impaq. 0.8-8)
Ongoing During Construction The property owner/developer shall ensure that all internal Planning Departmere,
combustion engines on construction equipment are fitted with Building Division
properly maintained mufflers. (3.8-9*)
Ongoing During Demolition In the event that hazardous waste, including asbestos, is Air Quality Management
and Construction discovered during site preparation or construction, the District for asbestos
property owner/developer shall ensure that the identified disposal; Orange County
hazardous waste and/or hazardous material are handled and Health Department for
disposed of in the manner specified by the State of California hazardous waste and material
Hazardous Substances Control Law (Health and Safety Code, disposal; Fire Department,
Division 20, Chapter 6.5), and according to the requirements Environmental Protection
of the California Administrative Code, Title 30, Chapter 22. Section for hazardous
(3.8-10') materials/wastes from
underground storage tanks
ongoing During Construction If Anaheim Police Department or Anaheim TMC personnel Police Department; Public
are required to provide temporary traffic control services, the Works/Engineering
property owner/developer shall reimburse the City, on a Department, Traffic
fairshare basis, if applicable, for reasonable costs associated Engineering Division; City
with such services. 0.8-11') Attorney's Office
R~vi~l 6/15/93-dismmp3a. wp
THE DISNEYLAND RESORT SPECIFIC PLAIN ( 38
Timing Measure Responsible for Monitoring Completion
Prior to Issuance of the First Excluding permits for relocation of the SCE transmission Public Works/Engineering
Demolition, Grading or lines, for the Disneyland Administration Building, or for Department, Traffic
Building Permit for Phase I, demolition related to relocation of the SCE transmission lines Engineering Division
Whichever Occurs First as specified in the Phasing Plan and/or construction of the
Disneyland Administration Building, the applicant will
establish an onsite public information office (which is
conveniently and accessibly located) where conatmction
scheduling and phasing information will be available to the
public. The public information office shall be open during
construction hours. A telephone "hotline" will be provided
to the community to allow members of the public to call the
office with questions or comments during business hours. At
least one liaison officer will be staffed at the office. The
liaison officer shall be available to answer questions from the
public and shall coordinate with the City of Anaheim, other
public agencies, and major developers in the area regarding
the coordination of construction activities and infrastructure
improvements. The City shall be provided with a monthly
summary of the calls received and follow-up actions.
(3.8-12')
Revised 6/15/93-diammp3a.wp
THE DISNEYLAND RESORT SPECIFIC PLAN 39
Timing Measure Responsible for Monitoring Completion
Prior to Issuance of the First Excluding the relocation of SCE Transmission lines or the Public Works/Engineering
Building Permit for the Disneyland Administration Building, the applicant shall Department, Traffic
Disneyland Resort or, any submit a Traffic Mitigation and Construction Phasing and Engineering Division;
Other Timing Specifically Control Plan. To the extent that the following project design Planning Department,
Provided in this Measure features (PDF 3.8-1 - 3.8-8) require the applicant to submit planning Division
plans for construction of both Phase 1 and Phase 2 of the
developmere to be submitted simultaneously, it is understood
that such Phase 2 plans may be considered preliminary and
may be subject to change. Such preliminar,j plans for Phase
2 will not be required to provide the level of detail required
for the Phase 1 plans provided that more detailed Phase 2
plans will be submitted separately at a later time.
Nevertheless, such preliminary plans for Phase 2 shall
provide sufficient schematic or descriptive detail to ensure
that plans submitted for Phase 2 at a future time shall comply
with the provisions of this Mitigation Monitoring Program
and shall be compatible with the provisions of the Phase 1
plans. The Traffic Mitigation and Construction Phasing and
Control Plan shall identif-j the following:
a. A Construction Staging Area Plan showing the location
and size of the construction staging area. The Plan shall
also show how the staging area will be screened from
view in compliance with the City of Anaheim Muuieipal
Code. (PDF 3.8-1)
Prior to Approval of Grading b. A Construction Barrier Plan showing the location and
Plan or Issuance of Demolition types of barriers to be in place during grading and
or Building Permits, construction. Said plan shall provide for all construction
Whichever Occurs First areas to be screened from view in compliance with the
City of Anaheim Municipal Code and shall include
provision for the type and height of the barriers to be
placed along all construction perimeters prior to the
commencement of demolition, site preparation or grading,
whichever occurs first. (PDF 3.8-2)
RevJaed 6/15/93-di~mnp3a. wp
THE DISNEYLAND RESORT SPECIFIC PL~ 40
Timing Measure Responsible for Monitoring Completion
Prior to Approval of Grading e. A Truck Route Plan identifying truck routes along
Plan or Issuance of Demolition arterials, avoiding residential areas to the extent feasible
or Building Permit, Whichever and in compliance with the Sound Pressure Level
Occurs First; Implemented Ordinance. The Plan shall show conformance with the
During Site Preparation and external noise limits for construction between 7 p,m. and
Cometion 7 a.m. The Plan shall also prohibit construction traffic
on residential streets where improvements are not planned
and shall provide measures to ensure that truck drivers are
directed away from residential streets and travel on
approved routes only. Measures to assist in guiding truck
movement on the arterial roadway system include, but are
not limited to, provision of truck route maps to truck
drivers and placement of flagpersons and construction
signage at appropriate locations. The Truck Route Plan
shall provide for monitoring of street conditions and
potential repairing and/or repaving by property
owner/developer after completion of construction as
required by the City Engineer. (PDF 3.8-3)
Prior to Approval of Grading d. A Construction Traffic Management Plan which includes
Plan or Issuance of Demolition mechanisms to reduce construction-related traffic
or Building Permit, Whichever congestion which shall be implemented during grading and
Occurs First; Implemented construction, including, but not limited to, the following:
During Grading and
Construction 1. Configure construction parking to minimize onsite and
offsite traffic interference.
2. Minimize obstruction of through-traffic lanes.
3.Provide flagpersons to guide traffic, as determined in
the plan. (PDF 3.8-4)
Revised 6/15/93<lismmp3a.wp
¢
THE DISNEYLAND RESORT SPECIFIC PLAN 41
Timing Measure Responsible for Monitoring Completion
Prior to Approval of the First e. A Trip Reduxion Plan (excluding the Disneyland
Grading Plan for Each Phase Administration Building and demolition for or reloeafion
of the SCE transmission lines) for construction crew
vehicles shall be prepared to reduce potential vehicle trips
on the road and identify parking locations for construction
employees and equipment. (PDF 3.8-5)
Prior to Issuance of the First f. A Traffic Management Plan for phasing of roadway
Building Permit for Each improvements, specifying the sequencing of construction
Phase to do the following:
1.Coordinate scheduling with other planned construction
in the area, including the I-5 widening project.
2. Coordinate scheduling with other infrastructure
improvements to allow them to be facilitated
efficiently during roadway improvements, such as
sewer, storm drain, and water line improvements.
3. Outline procedures for any required traffic detours
during construction, including provision of tour bus
stops.
4. Phase each roadway improvement to allow access to
all existing businesses/residential areas. In some
instances this will require lane-by-lane renovation,
temporary bypass roads, or traffic reroutes.
5. Employ vertical shoring as often as possible. This
will minimize the amount of road surface that will be
disturbed at a given location.
6. Sequence the construction of each roadway
improvement to minimize disruption to residents and
businesses.
Revised 6/15/93-dismmp3a.wp
THE DISNEYLAND RESORT SPECIFIC PLAIN 42
Timing Measure Responsible for Monitoring Completion
7. Establish offsite parking and staging areas, where
practical and possible, to minimize the impact to
existing level of service on adjacent roadways. These
offsite parking and staging areas will allow a
dispersion of traffic flow to noncritical areas and will
encourage bussing of construction workers from the
offsite areas to the construction sites. (PDF 3.8-6)
Prior to Issuance of the First g. Infrastructure Coordination Plan showing how the project
Building Permit improvement construction schedules and haul routes will
be coordinated with other areawide improvements. The
applicant shall coordinate with the Convention Center and
area hotels to ensure continued operations of these
facilities, as well as the continued operation of the existing
Disneyland theme park and Disneyland Hotel.
(PDF 3.8-7)
Prior to Approval of the First h. An Infrastructure Improvement Master Phasing Plan
Grading Plan for the containing (a) infrastructure layout, (b) sizing, including
Disneyland Resort supporting calculations, and (c) infrastructure construction
phasing. (PDF 3.8-8)
Ongoing During Project The applicant shall submit a quarterly update report showing Public Works/Engineering
Construction construction activities for the upcoming quarter which shall Department; Planning
include traffic mitigation and control planning and Department, Planning
construction scheduling. (PDF 3.8-9) Division
Revised6115/93-di~mmp3a.wp
THE DISNEYLAND RESORT SPECIFIC PLAN 43
Timing Measure Responsible for Monitoring Completion
Ongoing During Construction To decrease solid waste resulting from the construction Public Works/Engineering
phases, asphalt and concrete which is demolished as a part of Department, Development
project demolition and construction may be crushed and Division
reused on the project site. (PDF 3.8-10')
Prior to Approval of Each The applicant shall show how the project will be in Public Works/Engineering
Grading Plan compliance with Traffic Mitigation and Construction Phasing Department, Traffic
and Control Plan. (PDF 3.8-11) Engineering Division;
Planning Department,
Planning Division
EMPLOYMENT, POPULATION, AND HOUSING
Varies The applicant shall implement the project design feature Refer to Note #7 on page 1.
included herein or its environmental equivalent. The City of
Anaheim Planning Department will ensure compliance
through the mitigation monitoring process. (3.9-1')
Ongoing During Project The existing Disneyland theme park and Disneyland Hotel Planning Department,
Operations special employment programs such as summer employment Planning Division
for teachers and educational programs offering local high
schools students jobs will continue. The Walt Disney
Company will also aggressively recruit workers who are
already a part of the resident work force in the region.
Implementation of The Disneyland Resort Specific Plan will
further efforts in offering employment opportunities at
various socioeconomic levels. (PDF 3.9-1')
PUBLIC SERVICE AND UTILITIES - FIRE
Varies The applicant shall implement all project design features or Refer to Note g7 on page 1.
their environmental equivalent. The City of Anaheim
Planning Department will ensure compliance through the
mitigation monitoring process. (3.10.1-i)
R~vised 61151934iammp3b.wp
THE DISNEYLAND RESORT SPECIFIC PLAN 44
Timing Measure Responsible for Monitoring Completion
Prior to Commencement of Ohsitc fire hydrants shall be installed and charged, as Fire Department
Structural Framing on Each required, by the property owner/developer. (3.10.1-2)
Parcel or Lot
Prior to Approval of Each The property owner/developer shall submit an emergency fire Fire Department
Grading Plan access plan to ensure that service to the site is in accordance
with Fire Department service requirements. (3.10.1-3)
Prior to Issuance of Each The property owner/developer shall submit a Construction Fire Department
Building Permit Fire Protection Plan which shall include detailed design plans
for accessibility of emergency fire equipment, fire hydrant
location, and any other construction features required by the
Fire Marshal. The property owner/developer shall be
responsible for securing facilities acceptable to the Fire
Department and hydrants shall be operational with required
fire flow. (3.10.14)
Prior to Issuance of Each Plans shall indicate that all buildings, exclusive of parking Fire Department
Building Permit; to be structures, shall have sprinklers installed by property
Implemented Prior to Each owner/developer in accordance with the Anaheim Municipal
Final Building and Zoning Code. (3.10.1-5)
Inspection
Revi~.d 6115/934ismmp3b.wp
¢
THE DISNEYLAND RESORT SPECIFIC PLAN 45
Timing Measure Responsible for Monitoring Completion
Prior to Issuance of Each Plans shall be submitted to ensure that development is in Fire Department
Building Permit accordance with the City of Anaheim Fire Department
Standards, including:
a.Overhead clearance shall not be less than 14 feet for the
full width of access roads.
b. Bridges and underground structures to be used for Fire
Department access shall be designed to support Fire
Department vehicles weighing 75,000 pounds.
c. All underground tunnels shall have sprinklers. Water
supplies are required at the entrances. Standpipes shall
also be provided when determined to be necessary by the
Fire Department.
d. Adequate off-site public fire hydrants contiguous to the
Specific Plan area and onsite private fire hydrants shall be
provided by the property owner/developer. The precise
number, types, and locations of the hydrants shall be
determined during building permit review. Hydrants are
to be a maximum of 400 feet apart.
e. A minimum residual water pressure of 20 psi shall remain
in the water system. Flow rates for public parking
facilities shall be set at 1,000 to 1,500 gpm. 0.10.1-6)
Prior to Issuance of the First The property owner/developer shall enter into an agreement Fire Department; City
Building Permit in Phase II with the City of Anaheim to pay or cause to be paid its fair Attorney's Office
share of the funding for one additional fire inspector to
ma'mta'm adequate levels of service of ongoing fire inspection
of the Project and in the Commercial Recreation Area.
O.]0.1-7)
R~vimd 6/15193<limmnp3b.wp
¢
THE DISNEYLAND RESORT SPECIFIC PLAN 46
Timing Measure Responsible for Monitoring Completion
Prior to Issuance of the First The EIR identifies the following equipment in connection Fire Depa,~ent; City
Building Permit for. the with the Project, other development within the C-R Overlay Attorney's Office
WESTCOT Center, Excluding of The Disneyland Resort Specific Plan Area, and cumulative
Permits for Demolition, the development in the Commercial Recreation Area:
Relocation of the Existing SCE
Transmission Lines or the · A vehicle equipped with specialty tools and equipment to
Construction of the Disneyland enable the Fire Deparmient to provide heavy search and
Administration Building rescue response capability.
· A medical triage vehicle/trailer, equipped with sufficient
trauma dressings, medical supplies, stretchers, etc., to
handle 1,000 injured persons, and an appropriate storage
facility.
· One additional fire truck company.
· One additional paramedic company.
·Modifications to existing fire stations to accommodate the
additional fire units.
¢ (
THE DISNEYLAND RESORT SPECIFIC PLAN 47
Timing Measure Responsible for Monitoring Completion
To implement this requirement as it applies to the applicant,
the applicant shall provide or cause to be provided funding
for the following equipment:
® One fire track company;
· One paramedic company; and
· Modifications to existing fire stations to accommodate the
fire truck company and the paramedic company.
The applicant shall not be required to contribute to the
purchase of the other equipment identified in the DEIR
because the applicant has or will provide its own emergency
response equipment and personnel.
The City recognizes that these improvements will serve not
only the applicant but also other property owners/developers
in the Specific Plan area, the Commercial Recreation Area,
and the service area, each of which should contribute its
allocable share of the cost of the improvements. To
implement this requirement as it applies to other property
owners/developers in the Specific Plan area, the Commercial
Recreation Area, and the'service area, the City shall, and
shall make appropriate arrangements with other public
agencies, if any, to reimburse the applicant to the extent that
its contributions for these improvements exceed the
applicant's allocable share of the cost. Such arrangements
shall include one or more of the following: (1) creation of
integrated financing districts; (2) entry into a reimbursement
agreement with the applicant; (3) creation of appropriate
community facilities districts, assessment districts, and/or the
use of similar public financing districts and/or mechanisms;
and (4) creation of such other mechanisms or districts as may
Revised 6115193-dismmp3b.wp
THE DISNEYLAND RESORT SPECIFIC PLAN 48
Timing Measure Responsible for Monitoring Completion
be appropriate to provide for the reimbursement of these
costs. The determination of the allotable share of
improvement costs attributable to the applicant and other
property owners/developers, and reimbursement amounts,
shall be based on an apportionment of the costs of such
equipment and personnel among property owners/developers,
including the applicant, in the Specific Plan area, the
Commercial Recreation Area, or the otherwise defined
service area, as applicable, depending on the area served.
Prior to Approval of Sweet The water supply system shall be designed by the property Fire Department; Public
Improvement Plans owner/developer to provide sufficient fire flow pressure and Utilities Department, Water
storage for the proposed land use and fire protection in Services
accordance with Fire Department requirements. 0.10.1-9)
Prior to Each Final Building The property owner/developer shall place emergency Fire Department
and Zoning Inspection telephone service numbers in prominent locations as approved
by the Fire Department. (3.10.1-10)
Prior to Final Building and The existing services and capabilities of the Disneyland Fire Fire Department
Zoning Inspections for the Department shall be extended within The Disneyland Resort.
WESTCOT Theme Park; Existing services include preconstruction checks,
Ongoing During Project preinvesfigation of fires and alarms, preplanning for fires and
Operation evacuations, fire prevention program activities, and
monitoring of pyrotechnics and spec'ml effects.
(PDF 3.10.1-1')
PUBLIC SERVICE AND UTILITIES - POLICE
Varies The applicant shall implement all project design features or Refer to Note g7 on page 1.
their environmental equivalent. The City of Anaheim
Planning Department will ensure compliance through the
mitigation monitoring process. (3.10.2-1)
Ongoing During Operation of The operator of the public parking facilities shall provide an Police Department
the WESTCOT Center adequate staff of private security officers for patrol and
surveillance of the facilities. (3.10.2-2')
¢
THE DISNEYLAND RESORT SPECIFIC PLAN 49
Timing Measure Responsible for Monitoring Completion
Prior to the Issuance of the The property owner/developer shall enter into an agreement Police Department, City
First Building Permit for the with the City of Anaheim to pay or cause to be paid its fair Attorney
WESTCOT Center (excluding share of the funding for police personnel and equipment
the Disneyland Administration necessary to meet the service needs of the Commercial
Building and the Relocation of Recreation Area. (3.10.2-3)
the SCE Transmission Lines)
Prior to Final Building and The applicant shall provide space within The Disneyland Police Department
Zoning Inspections for the Security Office, to support the Anaheim Police Department to
WESTCOT Theme Park the satisfaction of the Police Department, based on the
following criteria:
· During the design phase of the security area, a police
representative shall be kept informed of the plans for the
security area.
·All facilities shall be within The Disneyland Resort
Security Office on a shared basis.
· Separate holding rooms for adult and juvenile offenders
shall be provided for the use of the Disneyland Security
Department.
· Additional private interview rooms shall be made available
for the shared use of the Anaheim Police Department and
the Disneyland Security DeparUnent, including adequate
areas for onsite storage needs and a common area for
computers. 0.10.2-4)
R~vised 6/15193-dismmp3b.wp
(
THE DISNEYLAND RESORT SPECIFIC PLAN 50
Timing Measure Responsible for Monitoring Completion
Prior to Issuance of Each The Police Department shall review the safety measures Police Depas'tment
Building Permit for Parking incorporated into the building plans for the parking structures
Structures within the Specific Plan area to be submitted by the property
owner/developer. The security measures shall include the
following or other substitute security measures as may be
approved by the Police Department:
· For the West and East Public Parking Structure, closed
circuit television surveillance and recording equipment
shall be provided.
·For the hotel parking structures, closed circuit television
surveillance and recording equipment shall be provided.
· For the Disneyland Administration Building and the South
Parking Area (south of Katella Avenue and west of Haster
Street), guarded entrance and exit gates shall be provided.
(3.10.2-5)
Ongoing During Operation of The applicant shall continue to provide anti-gang and Police Department
the WESTCOT Center substance abuse educational programs which are currently
provided for park security east members. (3.10.2-6')
Ongoing During Operations The Disneyland Security Department shall be expanded to Police Department
provide equivalent levels of service to the entire Disneyland
Resort, These services will include initial response,
investigation, and report writing. Entry points to the theme
parks will be patrolled by the Disneyland Security
Department. (PDF 3.10.2-1')
Prior to Issuance of Each In the West and East Public Parking Structures and in the Police Depa~h~sent
Building Permit for Each hotel parking structures, closed circuit television monitoring
Parking Facility; to be and recording or other adequate security measures will be
Implemented Prior to Final used extensively. (PDF 3.10.2-2)
Building and Zoning
Inspections
THE DISNEYLAND RESORT SPECIFIC PLAN 51
Timing Measure Responsible for Monitoring Completion
Ongoing During Project The applicant shall continue to provide and expand its Court Police Department
Operation Liaison program to meet the needs of The Disneyland Resort.
(PDF 3.10.2-3')
PUBLIC SERVICE AND UTILITIES - SOLID WASTE
Varies The applicant shall implement all project design features or Refer to Note #7 on page 1.
their environmental equivalent. The City of Anaheim
Planning Department will ensure compliance through the
mitigation monitoring process. 0.10.3-1)
Prior to Final Zoning and Excluding the relocafion of SCE transmission lines, the Maintenance Depamnent
Building Inspections Disneyland Administration Building and demolition, the
property owner/developer shall submit project plans to the
Director of Maintenance for review and approval to ensure
that the plans comply with All 939, the Solid Waste
Reduction Act of 1989, as implemented by the City of
Anaheim, the County of Orange Integrated Waste
Management Plan, and the City of Anaheim Integrated Waste
Management Plan, administered by the Department of
Maintenance. (3.10.3-2)
Prior to Final Zoning and A solid waste management plan shall be submitted for review Maintenance Department;
Building Inspection; to be and approval by the applicant for The Disneyland Resort Fire Department,
Implemented During Operation theme parks to ensure that the project plans comply with AB Environmental Protection
of the Theme Parks 939, as administered by the City of Anaheim, and the Section (for hazardous
County's and City's Integrated Waste Management Plans. material disposal)
Waste management mitigation measures that shall be taken to
reduce solid waste generation shall include:
a.Detailing the locations and design of back-of-house
recycling facilities.
b.Complying with all Federal, State, and City regulations
for hazardous material disposal.
Revised 6/15/93-diarmnp3b.wp
THE DISNEYLAND RESORT SPECIFIC PLAN 52
Timing Measure Responsible for Monitoring Completion
c. Continuing participation in the City of Anaheim's
voluntary 'Recycle Anaheim' program or other substitute
program as may be developed by the City.
In order to meet the requirements of the Solid Waste
Reduction Act of 1989 (AB 939), the applicant shall
implement numerous solid waste reduction programs at The
Disneyland Resort, including:
.® Facilitating paper recycling by providing chutes or
convenient locations for sorting and recycling bins.
· Facilitating cardboard recycling (especially from retail
areas) by providing adequate space and centralized
locations for collection and baling.
® Facilitating glass recycling (especially from restaurants) by
providing adequate space for sorting and storing.
· Providing trash compactors for nonrecyclable materials
whenever feasible to reduce the total volume of solid
waste and the number of trips required for collection.
· Prohibition of curbside. pick-up within The Disneyland
Resort. (3.10.3-3)
Revised 6/15/934ismmp3b.wp
THE DISNEYLAND RESORT SPECIFIC PLAN 53
Timing Measure Responsible for Monitoring Completion
Prior to Final Building and The existing solid waste recycling and waste minimization Maintenance Department
Zoning Inspections for the practices at the Disneyland theme park shall be expanded as
WESTCOT Theme Park; and feasible to serve The Disneyland Resort. Existing practices
continuing on an Ongoing include:
Basis During Project Operation
· Usage of recycled paper products for stationery,
letterhead, and packaging.
· Recovery of materials such as aluminum and cardboard.
· Collection of office paper for recycling.
· Collection of polystyrene (foam) cups for recycling.
® Collection of glass, plastics, kitchen grease, laser printer
toner cartridges, oil, batteries, and scrap metal for
recycling or recovery. (PDF 3.10.3-1)
PUBLIC SERVICE AND UTILITIES - PARKS
Varies The applicant shall implement all project design features or Refer to Note #7 on page 1.
their environmental equivalent. The City of Anaheim
Planning Department will ensure compliance through the
Mitigation Monitoring Program process. (3.10.4-1)
Prior to Issuance of the First The applicant shall enter into an agreement to pay the cost of Parks, Recreation, and
Building Permit for Phase I providing night lighting to two existing ballfields at one or Community Services
more existing City community parks complete with support DeparUnent, Parks Division;
amenities, including parking, security lighting, restrooms, City Attorney's Office
spectator seating, and drinking fountains. The applicant shall
enter into an agreement with the Parks, Recreation and
Community Services Department that delineates the
conditions under which payment for improvements will be
provided. (3.10.4-2)
Revised 6I 15/93<lismmp3b .wp
THE DISNEYLAND RESORT SPECIFIC PLAN 54
Timing Measure Responsible for Monitoring Completion
Prior to Final Building and Substantial area within The Disneyland Resort has been Planning Department,
Zoning Inspections for the designed to encourage utilization by pedestrians in a park-like Planning Division; Public
WESTCOT Theme Park setting linking key areas of the project. The pedestrian Works/Engineering
amenities will include landscaped pedestrian walkways Department, Design Division
linking West Street/Disneyland Drive to Harbor Boulevard;
and a new entry plaza for the Disneyland and WESTCOT
theme parks where the Monorail and pedestrian ways/people
movers/moving sidewalks will drop off guests from the
parking facilities and hotels. (PDF 3.10.4-1)
Prior to Final Building and The applicant will provide an eating area, outside the paid Parks, Recreation, and
Zoning Inspections for the gates, easily accessible to park guests, within the Theme Park Community Services
WESTCOT Theme Park District for those who bring their own food. Design featores Department, Parks Division
will include a 50-table layout with comparable spacing to
other theme park eating areas. Drinking fountains, security,
landscaping, lighting, vending machines, and nearby
restrooms/locker facilities will be provided. (PDF 3.10.4-2)
PUBLIC SERVICE AND UTILITIES - SCHOOLS
Varies The applicant shall implement all project design features or Refer to Note #7 on page 1.
their environmental equivalent. The City of Anaheim
Planning Department will ensure compliance through the
mitigation monitoring process. (3.10.5-1)
Prior to Issuance of Each The property owner/developer shall provide proof that school Planning Department,
Building Permit impact fees have been paid consistent with State statute. Building Division
(3.10.5-2)
Revised 6/151934ismmp3b.wp
THE DISNEYLAND RESORT SPECIFIC PLAN 55
Timing Measure Responsible for Monitoring Completion
Ongoing During Project The existing Disneyland theme park has developed and/or has Planning Department,
Operations engaged in a series of educational programs in cooperation Planning Division
with the local community and regional agencies and
organizations, designed to enhance and complement the
educational opportunities and experiences for the youth. The
10 educational programs that currently exist are indicated
below (see Section 3.10.5, Schools, for detailed information
regarding these programs):
1. The Disneyland Creativity Challenge Awards Program
2. Orange County Young Listeners Concerts
3. Junior Achievement (JA)
4. Work Exposure Day at Disneyland
5. Disney Magic Music Days
6. Job Search Strategy Class
7. HFree From Drugs' Program
8. Job Training Opportunities
9. School Support Programa
10. CIF Champion Celebration
The applicant will continue these programs and/or substitute
similar programs of equal importance. (PDF3.10.5-1)
PUBLIC SERVICE AND UTILIT1F. q - WATER
Varies The applicant shall implement all project design features or Refer to Note #7 on page 1.
their environmental equivalent. The City of Anaheim
Planning Department will ensure compliance through the
mitigation monitoring process. (3.10.6-1)
Revised 6/15/93 <lismmp3b.wp
THE DISNEYLAND RESORT SPECIFIC PLAN 56
Timing Measure Responsible for Monitoring Completion
Prior to Issuance of Each Among the water conservation measures to be shown on Utilities Department, Water
Building Permit or Approval of plans and implemented by the property owner/developer (to Services; Parks, Recreation
Each Landscape Plan, the extent feasible within the Theme Park District) within the and Community Service,
Whichever Occurs First; to be Specific Plan area include the following: Parks Division; Planning
Implemented Prior to Final Department, Building
Zoning and Building · Use of low-flow sprinkler heads in irrigation system. Division
Inspections; and, Continuing
on an Ongoing Basis During · Use of waterway re-circulation systems.
Project Operation
· Low-flow fittings, fixtures, and equipment, including low
flush toilets and urinals.
· Use of self-closing valves on drinking fountains.
·Use of reclaimed water for irrigation and washdown when
it becomes available.
·Continuation of the existing cooling tower recirculation
system.
·Use of efficient irrigation systems such as drip irrigation
and automatic systems which use moisture sensors.
· Low-flow shower heads in hotels.
·Water-efficient ice machines, dishwashers, clothes
washers, and other water-using appliances.
·Use of irrigation systems primarily at night when
evaporation rates are lowest.
Reviaed6115193~liammp3b.wp
THE DISNEYLAND RESORT SPECIFIC PLAN 57
Timing Measure Responsible for Monitoring Completion
®Provide information to the public in conspicuous places
regarding water conservation.
·Use of water-conserving landscape plant materials
wherever feasible.
·Use of vacuum and other equipment to reduce the use of
water for washdown of exterior areas. (3.10.6-2)
Prior to Each Final Zoning and The property owner/developer shall submit a certified water Utilities Department, Water
Building Inspection 'audit for landscape irrigation systems. (3.10.6-3) Services
Prior to Issuanco of the First The existing 12-inch water main between Ball Road and the Utilities Department, Water
Building Permit for the southeast corner of the Disneyland Administration Building Services
Disneyland Administration site will be replaced hy the applicant with a new 16-inch
Building; to be Implemented diameter main to the satisfaction of the Public Utilities
Prior to Final Building and Department. 0.10.64)
Zoning Inspections for the
Disneyland Administration
Building
Prior to Issuance of the First For construction in the back-of-house area, excluding the Utilities Department, Water
Building Permit for Phase II, Disneyland Administration Building, the existing 12-inch Services; City Attorney's
Excluding Permits for the water main will be relocated by the applicant between the Office
Demolition or Relocation of southeast corner of the Disneyland Administration Building
the Existing SCE Transmission site and Harbor Boulevard north of Manchester Avenue with
Lines a new 16-inch diameter main to the satisfaction of the Public
Utilities Department. 0.10.6-5)
¢
THE DISNEYLAND RESORT SPECIFIC PLAN 58
Timing Measure Responsible for Monitoring Completion
Prior to Issuance of the First The applicant shall submit for review and approval an Utilities Department, Water
Building Permit for Phase II, engineering report and phasing plan demonstrating the Services; City Attorney's
Excluding Permits for incorporation of the following water system improvements Office
Demolition or the Relocation into The Disneyland Resort. The applicant shall construct or
of the Existing SCE cause to be constructed the following improvements:
Transmission Lines; to be (3.10.6-6)
Implemented in Accordance
with the Approved Phasing a. The existing 8-inch-diameter pipe in Clementinc Street
Plan from Katella Avenue to Freedman Way shall be replaced
by a 20-inch-diameter pipe.
b. The existing 10-inch-diameter pipe in Freedman Way from
Clementinc Street to Harbor Boulevard shall be replaced
by a 20-inch-diameter pipe.
e. The existing 10-inch-diameter pipe in Harbor Boulevard
from Katella Avenue to Freedman Way shall be replaced
by a 20-inch-diameter pipe.
d. The 12-inch pipe in Katella Avenue from Harbor
Boulevard to Clementinc Street shall be replaced by a 20-
inch-diameter pipe.
e. The existing 10-inch-diameter pipe in Harbor Boulevard
from Freedman Way to Harbor Boulevard north of
Manchester Avenue shall be replaced by a 16-inch-
diameter pipe.
Revised 6/15193-disramp3b.wp
THE DISNEYLAND RESORT SPECIFIC PLAN 59
Timing Measure Responsible for Monitoring Completion
The City recognizes that these improvements will serve not
only the applicant but also other property owners/developers
in the Specific Plan area, the Commercial Recreation Area,
and the service area, each of which should contribute its
allocable share of the cost of these improvements. To
implement this requirement as it applies to other property
owners/developers in the Specific Plan area, the Commercial
Recreation Area, and the service area, the City shall, and
shall make appropriate arrangements with other public
agencies, if any, to reimburse the applicant to the extent that
its contributions for these improvements exceed the
applicant's allocable share of the cost. Such arrangements
shall include one or more of the following: (1) creation of
integrated financing districts; (2) entry into a reimbursement
agreement with the applicant; (3) creation of appropriate
community facilities districts, assessment districts, and/or use
of similar public financing districts and/or mechanisms; and
(4) creation of other such mechanisms or districts as may be
appropriate to provide for the reimbursement of these costs.
The determination of the allocable share of improvement
costs attributable to the applicant and other property
owners/developers, and reimbursement amounts, shall be
based on an apportionment of the costs of such improvements
among property owners/developers, including the applicant,
in the Specific Plan area, the Commercial Recreation Area,
or otherwise deftned service area, as applicable, depending
on the area served.
Revised 6/15/93~isrmnp3b.wp
THE DISNEYLAND RESORT SPECIFIC PLAN 60
Timing Measure Responsible for Monitoring Completion
Prior to Issuance of the First The applicant shall submit for review and approval an Utilities Depathnent, Water
Building Permit for Phase I, Engineering Report and Phasing Plan demonstrating the Services; City Attorney's
Excluding Permits for incorporation of a new water supply well at Clementine Office
Demolition or the Relocation Street and Freedman Way. (3.10.6-7)
of the Existing SCE
Transmission Lines
Prior to Final Building and The applicant shall complete the drilling of the new water
Zoning Inspextions for Phase 1 supply well at Clementine Street and Freedman Way.
(3.10.6-8)
Revised 6/15/93-dismmo3b.wp
THE DISNEYLAND RESORT SPECIFIC PLAN 61
Timing Measure Responsible for Monitoring Completion
Prior to Final Building and The applicant shall construct or cause to be constructed the Utilities Department, Water
Zoning Inspections for the site improvements for the well at Clementinc Street and Services; City Attorney's
WESTCOT Theme Park Freedman Way. Office
The City recognizes that these improvements will serve not
only the applicant but also other property owners/developers
in the Specific Plan area, the Commercial Recreation Area,
and the service area, each of which should contribute its
allocable share of the cost of these improvements. To
implement this requirement as it applies to other property
owners/developers in the Specific Plan area, the Commercial
Recreation Area, and the service area, the City shall, and
shall make appropriate arrangements with other public
agencies, if any, to reimburse the applicant to the extent that
its contributions for these improvements exceed the
applicant's allocable share of the cost. Such arrangements
shall include one or more of the following: (1) creation of
integrated financing districts; (2) entry into a reimbursement
agreement with the applicant; (3) creation of appropriate
community facilities districts, assessment districts, and/or use
of similar public financing districts and/or mechanisms; and
(4) creation of other such mechanisms or districts as may be
appropriate to provide for the reimbursement of these costs.
The determination of the allocable share of improvement
costs attributable to the applicant and other property
owners/developers, and reimbursement amounts, shall be
based on an apportionment of the costs of such improvements
among property owners/developers, including the applicant,
in the Specific Plan Area, the Commercial Recreation Area,
or otherwise defined service area, as applicable, depending
on the area served. (3.10.6-9)
Rcviaed6/15/93<lismmp3b.wp
¢
THE DISNEYLAND RESORT SPECIFIC PLAN 62
Timing Measure Responsible for Monitoring Completion
Prior to Each Final Building The Disneyland Resort will be developed with piping onsite Utilities Department, Water
and Zoning Inspex~ion for the to use reclaimed water when it is available from the County Services
Disneyland Resort Sanitation District of Orange County (CSDOC), for use in
The Disneyland Resort waterways and for irrigation.
(PDF 3.10.6-1)
To be Shown on Street With development of The Disneyland ResoR, some street Utilities Departmere, Water
Improvement Plans; to be rights-of-way will be relocated, therefore requiring relocation Setvices
Implemented Prior to Street of the utilities. The following improvements are included in
Relocafion or Final Building the development of The Disneyland Resort:
and Zoning Inspections for the
WESTCOT Theme Park, · The existing 10-inch-diameter pipe in Cerritos Avenue
Whichever Occurs First between Walnut Street and West Street/Disneyland Drive
will be abandoned with the proposed realignment of this
portion of Cerritos Avenue, and a new 12-inch-diameter
pipe will be installed in the new Cerritos Avenue right-of-
way.
· The existing 12-inch and 14-inch diameter pipes in West
Street/Disneyland Drive will be replaced with a 20-inch
diameter pipe and relocated with the realignment of the
West Street/Disneyland Drive right-of-way.
· An onsite 12-inch dualrfeed water line through the
proposed WESTCOT Center from the proposed water line
in West Street/Disneyland Drive to the proposed water
line in Harbor Boulevard will be constructed. The dual-
feed system will create two means of water supply to any
point fed from this line and will ensure good fire flow
protection. (PDF 3.10.6-2)
Revised 6/15/93<lismmp3b.wp
( (
THE DISNEYLAND RESORT SPECIFIC PLAN 63
Timing Measure Responsible for Monitoring Completion
PUBLIC SERVICE AND UTILITIES -
WASTEWATER/SEWER
Variea The applicant shall implement all project design features or Refer to Note//7 on page 1.
their environmental equivalent. The City of Anaheim
Planning Department will ensure compliance through the
mitigation monitoring process. (3.10.7-1)
Prior to Issuance of the First The applicant shall submit a report indicating that the Public Works/Engineering
Building Permit for the Administration Building will not increase the sewage flows to Department, Development
Disneyland Administration Ball Road beyond historic levels. The applicant will upgrade Division and Design
Building; to be Implemented or parallel the existing 10-inch diameter pipe in Winston Division
Prior to Final Building and Road from the Disneyland property line to West
Zoning Inspection for the Streetf Disneyland Drive with an approximate 12-inch
Disneyland Administration diameter pipe. Additionally, an upgrade or parallel pipe to
Building the existing 10-inch diameter pipe in West Street between
Winston Road and Cerritos Avenue will be provided.
(3.10.7-2)
Prior to the First Final The applicant shall construct or cause to be constructed the Public Works/Engineering
Building and Zoning Inspection following improvements: Department, Design
for Phase II, Excluding Division; City Attorney's
Permits for Demolition or the · A City sewer main upgrade line or parallel sewer line to Office
Reloeation of the Existing SCE the existing 24-inch sewer main in Katella Avenue, from
Transmission Lines the existing 27-inch District sewer line at Walnut Street or
Ninth Street to a point west of the I-5.
THE DISNEYLAND RESORT SPECIFIC PLAN 64
Timing Measure Responsible for Monitoring Completion
· A sewer main replacement or parallel line in Harbor
Boulevard from Freedman Way to Katella Avenue.
The City recognizes that these improvements will serve not
only the applicant but also other property owners/developers
in the Specific Plan area, the Commercial Recreation Area,
and the service area, each of which should contribute its
allocable share of the cost of these improvements. To
implement this requirement as it applies to other property
owners/developers in the Specific Plan area, the Commercial
Recreation Area, and the service area, the City shall, and
shall make appropriate arrangements with other public
agencies, if any, to reimburse the applicant to the extent that
its contributions for these improvements exceed the
applicant's allocable share of the cost. Such arrangements
shall include one or more of the following: (1) creation of
integrated financing districts; (2) entry into a reimbursement
agreement with the applicant; 0) creation of appropriate
community facilities districts, assessment districts, and/or use
of similar public financing districts and/or mechanisms; and
(4) creation of other such mechanisms or districts as may be
appropriate to provide for the reimbursement of these costs.
The determination of the allotable share of improvement
costs attributable to the applicant and other property
owners/developers, and reimbursement amounts, shall be
based on an apportionment of the costs of such improvements
among property owners/developers, including the applicant,
in the Specific Plan area, the Commercial Recreation Area,
or otherwise defined service area, as applicable, depending
on the area served. (3.10.7-3)
Revised 6115193-dismmp3b. wp
¢
THE DISNEYLAND RESORT SPECIFIC PLAN 65
Tim'mg Measure Responsible for Monitoring Completion
To be Shown on Street With development of The Disneyland Resort, some street Public Works/Engineering
Improvements Plans; to be rights-of-way will be realigned, therefore requiring Department, Design Division
Implemented Prior to Final concurrent rdocation of the sewer line to the proposed rights~
Building and Zoning Inspection of-way as follows:
for the WESTCOT Theme
Park · Reconstruction of the existing pipeline in West
street/Disneyland Drive when the street alignment is
implemented.
· Construction of a 15-inch to 21-inch pipeline in Cerritos
Avenue between West Street/Disneyland Drive and
Walnut Street when the existing streeX is abandoned and
relocated.
· Construction of a 12-inch pipeline in West Street/
Disneyland Drive from Winston Road to Cerritos Avenue.
(PDF 3.10.7-1)
PUBLIC SERVICE AND UTILITIES - STORM DRAINS
Varies The applicant shall implement all project design features or Refer to Note #7 on page 1.
their environmental equivalent. The City of Anaheim
Planning Department will ensure compliance through the
mitigation monitoring process. (3.10.8-1)
Prior to Approval of Grading Excluding the relocation of the SCE transmission lines, the Public Works/Engineering
Plans; to be Constructed Prior construction of the Disneyland Administration Building or Department, Development
to Final Building and Zoning demolition, a detailed drainage study and plan that identifies Division
Inspections for the WESTCOT either no increase in area historic drainage flows and no
Theme Park changes in area historic drainage patterns, except as already
addressed through Project Design Features; or, that identifies
additional drainage improvements to meet multi-year storm
design frequency discharges for Phase I and Phase II
improvements and to protect property in the event of a 100~
year storm design frequency shall be submitted for review
and approval. (3.10.8-2)
Revised 61151934ismmp3b.wp
THE DISNEYLAND RESORT SPECIFIC PLAN 66
Timing Measure Responsible for Monitoring Completion
To be Shown on Street The applicant shall construct or cause to be constructed Public Works/Engineering
Improvement Plans; to be detention/retention facilities in the South Parking Area to Department, Development
Implemented Prior to the First ensure that the storm water runoff from the Future Epansion Division
Final Building and Zoning District does not increase area historic drainage flows and
Inspection for the South does not alter historic drainage patterns. (3.10.8-3)
Parking Area
To be Shown on Street If the proposed runoff will be discharging at or below area Public Works/Engineering
Improvement Plans; to be historic levels, and consistent with area historic patterns, The Department, Design Division
Implemented Prior to Final Disneyland Resort tributary to the Katella Avenue drainage
Building and Zoning basin will not be required to implement drainage main line
Inspections for the WESTCOT infrastructure improvements. Detention/retention facilities of
Theme Park storm runoff may be considered in the final design phase of
the overall public system; however, such proposed
detention/retention facilities must have maintenance
guarantees and would be required to meet strict design
criteria so that they may function properly in multi-year
storm design frequencies. (PDF 3.10.8-1)
To be Shown on Street Due to the proposed relocation of the portion of Cerritos Public Works/Engineering
Improvement Plans; to be Avenue between Walnut Street and West Street/Disneyland Department, Design Division
Implemented Prior to Final Drive, the existing storm drain lines in this part of Cerritos
Building and Zoning Avenue will be abandoned. As part of the reconstruction of
Inspections for the WESTCOT Cerritos Avenue, a new storm drain line will be installed
Theme Park from West Street/Disneyland Drive within the new right-of-
way to Walnut Street, and then in existing right-of-way along
Walnut Street and Cerritos Avenue to the ABC Channel.
(PDF 3.10.8-2)
To be Shown on Street Due to the lowering of a portion of West Street/Disneyland Public Works/Engineering
Improvement Plans; to be Drive, a new storm drain line with a pump system shall be Department, Design Division
Implemented Prior to Final constructed to pump water from the sump area to the
Building and Zoning Inspection proposed Cerritos Avenue storm drain line. (PDF 3.10.8-3)
for the WESTCOT Theme
Park
Revised 6/15/93qtismmp3b .wp
( ¢
THE DISNEYLAND RESORT SPECIFIC PLAN 67
Timing Measure Responsible for Monitoring Completion
To be Shown on Street Storm dram laterals are required as part of normal street Public Works/Engineering
Improvement Plans; to be construction and are listed as follows: New storm drain Department, Design Division
Implemented Prior to Final laterals will be constructed in West Street/Disneyland Drive
Building and Zoning Inspection north of Katalla Avenue to drain runoff to gatella Avenue; in
for the WESTCOT Theme West Streetf Disneyland Drive north of Cerritos Avenue to
Park drain runoff to Cerritos Avenue; and, in Walnut Street south
of Cerritos Avenue to drain runoff to Katella Avenue. All
will be designed so that no additional runoff is directed to
Katella Avenue or Ball Road. (PDF 3.10.8-4)
'PUBLIC SERVICE AND UTILITIF..._~ - ELECTRICITY
Varies The applicant shall implement all project design features or Refer to Note #7 on page 1.
their environmental equivalent. The City of Anaheim
Planning Department will ensure compliance through the
mitigation monitoring process. (3.10.9-1)
Prior to Issuance of Each The property owner/developer sha/l submit plans showing Utilities Department, Energy
Building Permit that each of the project's buildings will comply with the State Services
Energy Conservation Standards for New Residential and
Nonresidential Buildings (Title 24, Part 6, Article 2,
California Code of Regalations). (3.10.9-2)
Prior to Approval of the First Excluding the Disneyland Administration Building, the Utilities Department, Energy
Grading Plan for Phase II; to applicant shall enter into an agreement with the City of Services, City Attorney's
be Implemented Prior to Final Anaheim to determine if the power system for The Office
Building and Zoning Inspection Disneyland Resort will be public or private. A maximum
for the WESTCOT Theme 100 MVA substation will be constructed on The Disneyland
Park Resort property adjacent to the west side of Harbor
Boulevard or in the back-of-house area. This will be
sufficient to accommodate the 21 MVA existing demand plus
a maximum 76 MVA Disneyland Resort demand load. The
substation site shall comply with all City requirements for the
necessary installation and maintenance within or crossing
rights-of-way. (3.10.9-3)
Revised 6/15193-dismmp3b.wp
THE DISNEYLAND RESORT SPECIFIC PLAN 68
Timing Measure Responsible for Monitoring Completion
Prior to Issuance of Building A leak response/safety plan shall be submitted for review and Fire Department
Permit for the Relocation of approval and will include at a minimum the following
the SCE Transmission Lines information:
a. Leak and spill procedure
b. Location of absorbent materials and containers
c. Storage and handling procedures
d. First aid measures
The plan shall oufiine the procedures for responding to a leak
or other events identified by the Fire Department. (3.10.9-4)
Prior to Final Building and The Southern California Edison transmission lines that cross Southern California Edison;
Zoning Inspection for the the existing Disneyland South Parking Lot will be relocated The Applicant
WESTCOT Theme Park underground and/or enclosed. (PDF 3.10.9-1)
Prior to Final Building and Coordinate with the Southern California Edison Company for Southern California Edison;
Zoning Inspection for the the relocation or undergrounding of transmission lines The Applicant
WESTCOT Theme Park presently crossing the existing Disneyland theme park
parking lot. (3.10.9-1a)
Reviewed 6/15/93-dismmp3b.wp
¢
THE DISNEYLAND RESORT SPECIFIC PLAN 69
Timing Measure Responsible for Monitoring Completion
Prior to Issuance of Each In order to conserve energy, The Disneyland Resort shall Utilities Department,
Building Permit; to be implement numerous energy saving practices in compliance Electrical Services
Implemented Prior to Each with Title 10, which may include the following:
Final Building and Zoning
Inspection · Consultation with the city energy-conservation experts for
assistance with energy-conservation design features.
· Use of high-efficiency air conditioning systems controlled
by a computerized management system including features
such as a variable air volume system, a 100-percent
outdoor air economizer cycle, sequential operation of air
conditioning equipment in accordance with building
demands, isolation of air conditioning to any selected floor
or floors.
· Use of electric motors designed to conserve energy.
· Use of special lighting fixtures such as motion sensing
lightswitch devices and compact fluorescent fixtures in
place of incandescent lights.
· Use of T8 lamps and electronic ballasts. Metal hallide or
high-pressure sodium for outdoor lighting and parking
lots. (PDF 3.10.9-2)
Reviaexi 6/15/93~lianunp3b .wp
THE DISNEYLAND RESORT SPECIFIC PLAN 70
Timing Measure Responsible for Monitoring Completion
PUBLIC SERVICE AND UTILITIES - NATURAL GAS
Prior to Issuance of Each The property owner/developer shall submit plans which shall Utilities Department, Energy
Building Permit ensure that buildings are in conformance with the State Services
Energy Conservation Standards for nonresidential building
(Title 24, Part 6, Article 2, California Administrative Code).
(3.10.10-1)
Prior to Approval of Each The Southern California Gas Company has developed several Southern California Gas
Final Building and Zoning programg which are intended to assist in the selection of most Company; Utilities
Inspection energy-efficient water heaters and furnaces. The property DeparUnent, Energy Services
owner/developer shall implement a program, as required, to
reduce the demand on natural gas supplies. (3.10.10-2)
PUBLIC SERVICE AND UTIL/TII*:R - TELEVISION
Prior to Issuance of First Excluding the Disneyland Administration Building, a pre- Planning Department,
Building Permit; and, 6 project study of area television reception shall be undertaken p]annlng Division
Months After Topping Out for by the applicant to determine baseline conditions. After
the WESTCOT Center topping out for the WESTCOT Center, a second study of
area television reception shall be undertaken immediately by
the applicant. If the City of Anaheim determines that the
proposed project creates a significant impact on broadcast
television reception at local residences, a signal booster or
relay system shall be installed on the roof of the tallest
project building to restore broadcast television reception to its
original condition as soon as practicable. (3.10. t2-1)
HAZARDOUS MATERIALS
Varies The applicant shall implement the project design features or Refer to Note #7 on page 1.
their environmental equivalent. The City of Anaheim
Planning Department will ensure compliance through the
mitigation monitoring process. (3.11-1)
Revised 6/15/93-.dismmp3b.wp
¢
THE DISNEYLAND RESORT SPECIFIC PLAN
Timing Measure Responsible for Monitoring Completion
Prior to Approval of the First Investigation for the presence of cryptic tanks using Orange County Health
Grading Plan or Issuance of geophysical methods shall be conducted in the subject area Department; Fire
the First Demolition Permit, for the property owner/developer by a qualified Department, Environmental
Whichever Occurs First, for environmental professional in the areas of former service Protection Section
Each Phase stations and those areas known or thought to have been
formerly occupied by USTs and where tank removal has not
been verified prior to excavation or grading in these areas.
Soil sampling or a soil organic vapor survey may be required
if soil sampling results are not available or indicate
contamination is present above regulatory guidelines. If
warranted, subsurface investigation and sampling shall be
undertaken in these areas, and appropriate remediation
measures developed, ff necessary, before demolition,
excavation, or grading takes place in these areas. (3.11-2)
Prior to Removal of A permit shall be obtained for removal of underground tanks Orange County Health
Underground TanEs; and, by the property owner/developer. During removal of the Department; Fire
During Removal of underground storage tank, a representative from the Department, Environmental
Underground Tanks Environmental Protection Section shall be onsite to direct soil Protection Section
sampling. (3.11-3)
Ongoing During Remediation Remediation activities conducted on behalf of the property Orange County Health
owner/developer of surface or subsurface contamination not Department; Fire
related to USTs shall be overseen by the Orange County Department, Environmental
Health Department. Information on subsurface contamination Protection Section
from an underground storage tank shall be provided to the
Fire Department. (3.114)
Prior to Approval of the First The property owner/developer will submit a plan which orange County Health
Grading Plan or Issuance of details procedures that will be taken if a previously unknown Department; Fire
the First Phase I Demolition UST or other unknown hazardous materials or waste is Department, Environmental
Permit, whichever Occurs discovered onsite. 0.11-5) Protection Section
First
THE DISNEYLAND RESORT SPECIFIC PLAN 72
Timing Measure Responsible for Monitoring Completion
Prior to Approval of Grading A site reconnaissance survey of the Miller Tools/Mobile Orange County Health
Plan for the Miller Tools/ Brake building shall be conducted by a qualified environmen- Department; Fire
Mobile Brake Site tal professional for the property owner/developer to assess Depa~h~ent, Environmental
any potential presence of hazardous materials at this facility. Protection Section
Where possible, interviews with property owners and/or
company representatives shall be conducted to obta'm
information on the hazardous material usage histories and
handling practices of the sites and, if available, copies of
contaminant investigation reports shall be reviewed to
· evaluate the presence and level of hazardous substances in the
soil at each property. The results of this investigation shall
be submitted to the Orange County Health Depadment for
review and approval. If warranted, subsurface investigation
and sampling shall be undertaken by a qualified
environmental professional in coordination with the Orange
County Health Department. Appropriate remediation
measures will be developed, if necessary, before demolition,
excavation, or grading take place in these areas. (3.11-6)
Prior to Approval of Grading A qualified environmental consultant shall attempt to contact Fire Department,
Plan or Issuance of Demolition the current and/or known former owners of the following on Environmental Protection
Permit, Whichever Occurs behalf of a property owner/developer within the C-R Overlay Section
First Area: Katella Car Wash, 350 W. Katella Avenue; the Shell
Service Station, 2100 S. Harbor Boulevard; National Car
Rental; the 7-11 convenience store; and the vacant parcels at
1340 S. West Street/Disneyland Drive and 321 West Katella
Avenue to obtain information regarding the status of
underground tanks and/or tank closures at these sites. If
necessary, subsurface investigation and sampling shall be
undertaken by a qualified environmental professional.
Results of those analyses shall be submitted to the Fire
Dep~,'tment for review and approval. (3.11-7)
Revised 6/15/93-dismmp3b.wp
EI
THE DISNEYLAND RESORT SPECIFIC PLAN 73
Timing Measure Responsible for Monitoring Completion
Prior to Reincation of The transformers shall be tested by the property Utilities Department,
Transformers Within Non- owner/developer for PCBs. (3.11-8) Electric Services
Disney-Controlled Properties
or City-Owned Transformers
Within the Specific Plan Area
That May Contain PCBs
Which Are Being Moved or
Relocated as Part of Project
Development
Prior to Approval of Grading For the northern portion of the West Street/Disneyland Drive Orange County Health
Plan or Issuance of Excavation strawberry farm (pumphouse area), the small remaining Depamnent; Fire
Permit mount of shallow soil affected by lubricating oil shall be Department, Environmental
handled and disposed of according to all applicable local, Protection Section
state, and federal laws and regulations. 0.11-9)
Prior to Approval of Grading Several representative samples of shallow soils shall be Orange County Health
Plan or Issuance of collected and analyzed by the property owner/developer for Department; Fire
Excavation Permit pesticide and herbicide residue in the West Street/Disneyland Depamaent, Enviromental
Drive agricultural area and the S&S Nurseries area. If soils Protection Section; Orange
containing pesticides or herbicides above regulated limits are County Agriculture
found, remedial actions shall be carried out before Deptutment
disturbance of the soils. Remedial actions should consist of
removal and disposal or treatment of affected soils according
to all applicable local, state, and federal regulations.
0.1I-I0)
Ongoing During Project The current compliance efforts for hazardous materials Fire Department
Operation utilized at the existing Disneyland theme park and Disneyland
Hotel described under Section 3.11.1.1, shall be expanded to
encompass The Disneyland Resort to ensure compliance with
applicable laws and regulations. (PDF 3.11 - 1')
R~vised 6/15/93qlismmp3b.wp
(
THE DISNEYLAND RESORT SPECIFIC PLAN 74
Timing Measure Responsible for Monitoring Completion
VISUAL RESOURCES AND AES*I~I'iCS
Varies The applicant shall implement all project design features or Refer to Note #7 on page 1.
their environmental equivalent. The City of Anaheim
Planning Department will ensure compliance through the
mitigation monitoring process. (3.12-1)
Prior to Issuance of Each The property owner/developer shall submit plans which Planning Department,
Building Permit; to be illustrate that all mechanical equipment and trash areas for Planning Division
Implemented Prior to Final the subject buildings will be screened from adjacent public
Building and Zoning streets and adjacent residential areas. (3.12-2)
Inspections
Prior to Issuance of Each The property owner/developer shall submit a landscape and Planning Department,
Building Permit irrigation plan. This plan shall be prepared by a licensed Building Division
landscape architect. The landscape plan shall include a
phasing plan for the installation and maintenance of
landscaping associated with that building permit. (3.12-3)
Prior to Issuance of Each The property owner/developer shall submit plans which detail Planning Department,
Building Permit for Each the lighting system for the parking facilities along Walnut Planning Division
parking Facility Along Walnut Street. The systems shall be designed and maintained in such
Street; to be Implemented a manner as to conceal light sources to the extent feasible to
Prior to Each Final Building minimize light spillage and glare to the adjacent uses. The
and Zoning Inspection plans shall be prepared and signed by a licensed electrical
engineer, with a letter from the engineer stating that, in the
opinion of the engineer, this requirement has been met.
(3.12-4)
Prior to Final Building and The applicant shall participate in a landscape assessment and City Attorney's Office
Zoning Inspection for the maintenance district, if one is established for the City of
WESTCOT Center Anaheim's Commercial Recreation Area. (3.12-5)
R~viaed 6/15/93-dismmp3b.wp
THE DISNEYLAND RESORT SPECIFIC PLAN 75
Timing Measure Responsible for Monitoring Completion
Prior to Approval of Final Site The proposed Specific Plan incorporates design guidelines as Planning Department,
Plan or Issuance of Each well as zoning and development standards, many of which Planning Division; Utilities
Building Permit, Whichever have been designed to reduce the potential visual impacts of Department, Electrical and
Comes First the project and to present a visually integrated resort area, Water Services; Parks,
including: Recreation and Community
Services, Parks Division
· The Disneyland Resort Specific Plan provides for heavily
landscaped streetscapes and gives the guidelines for trees
and shrubs, light fixtures, benches, monuments, and signs
located within the landscaped area.
· The East and West Parking Areas and the hotel parking
facilities will have landscaped setbacks from the public
right-of-way and are restricted in height.
· Rights-of-way will be landscaped to add to the aesthetics
of the area.
· The landscape tream~ents will vary to create distinct places
visually.
· The West Parking Area and hotel parking facilities will be
terraced back from Walnut Street with landscaping
treatments above 40 feet. In addition, canopy trees will
be planted in a center median on Walnut Street, and the
parkway along the street will be landscaped.
· A coordinated color theme for major street features will
be incorporated into the design.
· The service areas and back-of-house areas will be
screened from public view.
· All rooftop equipment on buildings will be screened as per
the Specific Plan. (PDF 3.12-1)
Revi~t 6115J93~lismmp3b.wp
(
THE DISNEYLAND RESORT SPECIFIC PLAN 76
Timing Measure Responsible for Monitoring Completion
CULTURAL ~URCES
Prior to Approval of Each The property owner/developer shall submit a letter Public Works/Engineering
Grading Plan identifying the certified archaeologist that has been hired to Department, Development
ensure that the following actions are implemented: Division; Planning
Department, Planning
a. The archaeologist must be present at the pregrading Division
conference in order to establish procedures for temporarily
halting or redirecting work to permit the sampling,
identification, and evaluation of artifacts if potentially
significant artifacts are uncovered. If artifacts are
uncovered and determined to be significant, the
archaeological observer shall determine appropriate actions
in cooperation with the property owner/developer for
exploration and/or salvage.
b. Specimens that are collected prior to or during the grading
process will be donated to an appropriate educational or
research institution.
c. Any archaeological work at the site shall be conducted
under the direction of the certified archaeologist. If any
artifacts are discovered during grading operations when
the archaeological monitor is not present, grading shall be
diverted around the area until the monitor can survey the
d. A final report detailing the findings and disposition of the
specimens shall be submitted to the City Engineer. Upon
completion of the grading, the archaeologist shall notify
the City as to when the final report will be submitted.
(3.13-1)
R~vised 6115193qlimmxp3b.wp
¢
THE DISNEYLAND RESORT SPECIFIC PLAN 77
Timing Measure Responsible for Monitoring Completion
Prior to Approval of Each The property owner/developer shall submit a letter Public Works/Engineering
Grading Plan identifying the certified paleontologist that has been hired to Department, Development
ensure that the following actions are implemented: Division; Planning
Department, Planning
a. The paleontologist must be present at the pregrading Division
conference in order to establish procedures to temporarily
halt or redirect work to permit the sampling,
identification, and evaluation of fossils if potentially
significant paleontological resources are uncovered. If
artifacts arc uncovered and found to be significant, the
paleontological observer shall determine appropriate
actions in cooperation with the property owner/developer
for exploration and/or salvage.
b. Specimens that are collected prior to or during the grading
process will be donated to an appropriate educational
research institution.
c. Any paleontological work at the site shall be conducted
under the direction of the certified paleontologist. If any
fossils are discovered during grading operations when the
paleontological monitor is not present, grading shall be
diverted around the area until the monitor can survey the
d. A final report detailing the findings and disposition of the
specimens shall be submitted. Upon completion of the
grading, the paleontologist shall notify the City as to when
the final report will be submitted. (3.13-2)
Revised 6115/93Mismmp3b.wp
THE DISNEYLAND RESORT SPECIFIC PLAN 78
Timing Measure Responsible for Monitoring Completion
ENERGY
Varies The applicant shall implement all project design features or Refer to Note #7 on page 1.
their environmental equivalent. The City of Anaheim
Planning Department will ensure compliance through the
mitigation monitoring process. (3.14.1)
Prior to Issuance of Each The property owner/developer shall demonstrate on plans that Planning Depa,'tn~ent,
Building Permit fuelefficient models of gas-powered building equipment have Building Division
been incorporated into the proposed project to the extent
feasible. (3.14-2)
Prior to Final Building and The projeat shall be developed in conformance with The Planning D~partment,
Zoning Inspection for the Disneyland Resort Specific Plan and shall offer a broad Planning Division
WESTCOT Theme Park; and, diversity of theme park, retail, dining and entertainment
Ongoing During Project experiences which will enhance the destination resort
Operation character of The Disneyland ResoR. As a result, many
visitors will extend their length of stay; thus, incremental
vehicular trips to and from the site are expexted to be
reduced. (PDF 3.14-1')
Prior to Issuance of Each The east and west public parking facilities shall be designed Public Works/Engineering
Building Permit for the East in accordance with the speed parking procedures set forth in Department, Traffic
and West Public Parking Section 7.0, Zoning and Development Standards, of the Engineering Division
Facilities Specific Plan which will assist in reducing vehicular fuel
from idling engines. (PDF 3.14-2)
Revised 6115193~iammp3b.w~