Loading...
RA1974/02/26Z�7 REDEVELOPMENT AGENCY Special Meeting February 26, 1974, (4 :15 P.M.) Council Chambers Anaheim City Hall PRESENT: Mr. Stephenson, Mr. and Mr. Dutton ABSENT: None PRESENT: EXECUTIVE DIRECTOR: CITY ATTORNEY: Alan SECRETARY: Alona M. Sneegas, Mr. Pebley, Mr. Thom Keith A. Murdoch R. Watts Farrens Special meeting of the Anaheim Redevelopment Agency was called by Chairman Dutton for the purpose of considering a recommenda- tion to be forwarded to the Orange County Transit District regarding modification of the T -2E Network, Transportation Corridor Study. Further notice of said meeting was waived by all Agency Members and representatives of The Anaheim Bulletin, The Register and The Los Angeles Times. The changes recommended by the City of Anaheim Planning Depart- ment, which were approved by the Anaheim City Council, were presented as follows: 1) That Network T2E be modified as follows: a) Realign the Pacific Electric Railroad right -of -way corri- dor, which is the primary corridor, at approximately Katella Avenue, utilizing the Southern Pacific Railroad right -of -way and the Southern California Edison easement by proceeding easterly to the Santa Ana Freeway. The corridor would then proceed southeasterly along the freeway to approximately Broadway where it would turn southerly and extend into the Santa Ana Civic Center Complex where it would intersect with the original corridor. b) Delete the Pacific Electric right -of -way corridor from the point where it intersects with the Southern Pacific Railroad right -of -way corridor (Anaheim modification) south to the Santa Ana Civic Center Complex. c) Provide service to the eastern central part of the County by extending the Southern Pacific Railroad right -of -way corridor along the Southern Pacific Railroad right -of -way in the City of Orange to a terminal to be located near the Newport Freeway in Orange. d) Provide service to the southwest part of the County by utilizing the Southern Pacific Railroad right -of -way as it extends southerly from the Pacific Electric Railroad right -of -way and terminates at the Pacific Ocean in Huntington Beach. 2) That a Multi -Modal Transportation Center be established in the Commercial- Recreation (Disneyland, Convention Center, Anaheim Stadium) Area of Anaheim as well as establishing 74 -7 transportation centers throughout the system at the intersec- tion of corridors and other major points of high trip genera- .-- tion, such as "The City" and the County Complex at Manchester and the Santa Ana Freeway, Santa Ana Civic Center Complex, regional shopping centers, etc. On motion by Mr. Sneegas, seconded by Mr. Dutton, the Anaheim Redevelopment Agency indicated support for the Orange County Transit District's Transportation Corridor Network T -2E with the modifications as outlined above. MOTION CARRIED. ADJOURNMENT Mr. Thom moved to adjourn. Mr. Pebley seconded the motion. MOTION CARRIED. ADJOURNED: 4 :17 P.M. Signed )97 Secretary, Redevelopment Agency REDEVELOPMENT AGENCY March 5, 1974, (4:55 P.M.) Council Chambers Anaheim City Hall PRESENT: Mr. Stephenson, Mr. Pebley, Mr. Thom and Mr. Dutton ABSENT: Mr. Sneegas PRESENT: ASSISTANT EXECUTIVE DIRECTOR: Robert M. Davis CITY ATTORNEY: Alan R. Watts SECRETARY: Alona M. Farrens The meeting was called to order by Mr. Dutton. MINUTES: On motion by Mr. Thom, seconded by Mr. Pebley, minutes of the meetings held February 5 and 19, 1974, were approved. MOTION CARRIED. ADJOURNMENT Mr. Pebley moved to adjourn. Mr. Stephenson seconded the motion. MOTION CARRIED. ADJOURNED: 5:00 P.M. Signed >,n.�cr��t Secretary, Redevelopment Agency