ARA1979-007RESOLUTION NO. ARA79- 7
A RESOLUTION OF THE ANAHEIM REDEVELOPMENT
AGENCY DIRECTING THE FILING AND POSTING OF
PREVAILING RATES OF PER DIEM WAGES PERTAIN -
TO PUBLIC WORKS.
WHEREAS, the Anaheim Redevelopment Agency may award
contracts for the construction of "public works" as defined in
Section 1720 of the Labor Code; and
WHEREAS, Section 1774 of the Labor Code requires con-
tractors and subcontractors on public works projects to pay work-
men not less than the prevailing rates of wages; and
WHEREAS, Section 1770 requires the Director of the
Department of Industrial Relations to determine the prevailing
rate of per diem wages; and
WHEREAS, the Director has determined the prevailing rate
of per diem wages; and
WHEREAS, all public bodies are required to either:
(a) specify the prevailing rates of per diem wages in
the call for bids, the bid specifications, and the
public works contract itself; or
(b) refer to copies of the prevailing rate of per diem
wages on file in the office of the awarding body if
a copy of said rates is posted at each jobsite.
NOW, THEREFORE, BE IT RESOLVED that the Anaheim Redevel-
opment Agency does hereby direct the Secretary of the Agency to
cause to be filed in the office of the Secretary the schedule of
prevailing rates of per diem wages as determined by the Director of
Industrial Relations marked as Exhibit "A," attached hereto and in-
corporated by reference herein.
BE IT FURTHER RESOLVED that the Executive Director be,
and he is hereby, directed to post, or cause to be posted, a copy
of this resolution at each jobsite.
THE FOREGOING RESOLUTION is approved and adopted by the
Anaheim Redevelopment Agency this 16th day of r January , 1979.
ATTEST:
SECRETA. Y
ANAHEIM REDEVELOPDENT AGENCY
ROF: fm
STATE OF CALIFORNIA )
COUNTY OF ORANGE )
CITY OF ANAHEIM )
I, LINDA.D. ROBERTS, Secretary.of the Anaheim. Redevelopment Agency, ''do
hereby certify that the for Resolution No.`ARA79 -7 was passed and
adopted at a regular meeting,of the Anaheim..Redevelopment Agency held on
the 16th day of January, 1979, by the.following.vote of the members thereof:
AYES: AGENCY MEMBERS: Overholt, Kaywood, Kott, Roth and Seymour
NOES: AGENCY MEMBERS: None
ABSENT: AGENCY MEMBERS: None
AND I FURTHER CERTIFY that the Chairman of the Anaheim Redevelopment
Agency signed said Resolution on the 16th day of January, 1979.
IN WITNESS WHEREOF, I have .hereunto . set my hand and seal this 16th day of
January, 1979.
SECRETARY OF THE ANAHE REDEVELOPMENT AGENCY
(SEAL)
saaaui2ud 43010.zd
aoa09aT" oax,j
' . rYWTRTT A
CLASSIFICATION
A -Frame or Swedish Crane or similar type equipment driver
A -Frame or Winch Truck Operator
Asphalt Paving Machine Operator (Barber Green or
similar type - 1 screedman required)
Asphalt Plant Engineer
12/78
HOURLY RATE
10.90
11.67
12.14
12.03
Asphalt Raker, Luteman and Ironer 8: Asphalt Spreader Boxes
(All 8.83
Asphalt Shoveler
Types) 8.63
Asphalt or Concrete Spreading Operator (tamping or finishing) 12.14
Asbestos:
General Foreman
13.95
Foreman
13.70
Worker
13.45
Auto Grader Operator ( Grade Checker and 1 additional
12.43
employee required).
Backhoe Operator (up to and including 3/4 yard)
12.03
Bootman
10.38
Boring Machine Operator
11.81
Boxman or Mixerman (Asphalt or Concrete)
11.81
Bricklayer and Stone Mason
12.35
Bricktender
8
Buggymobile Man
8'83
Carpenter
10.77
Cast in Place Pipe Laying Machine Operator
12.14
Cement Dumper (on 1 yard or larger mixer and handling
8.63
bulk cement)
11.01
Cement Mason Journeyman
Cement Mason Floating and Troweling Machine Operator
11.26
Cement Mason (Magnesite, magnesite - Terrazzo and mastic
11.13
composition, Expoxy, Dex -O -Tex)
Chairman
11.83
Chucktender
8.63
Clary & Similar type of Screed Operator
11.01
Combination Mixer and Compressor Operator (Gunite Work)
12.14
Concrete Core Cutter, Grinder or Sander
8.83
Concrete Curer, impervious Membrane and Form Oiler
8.63
Concrete Mixer Operator, Skip Type
11.38
Concrete Mixer Operator - Paving (Oiler or Journeyman -
12,14
trainee required)
Concrete Pump Operator (truck mounted) Oiler required
12.14
Concrete Pump Operator (small portable)
11.81
Concrete Saw Man, Cutting, Scoring Old or New Concrete
8.83
Conveyor Operator
11.38
Crane Operator (up to and including 25 -ton capacity)
(See Crew Size Requirements) (Long Boom
12.14
._ pay applicable)
Cribber and Shorer, Lagging, sheeting and trench bracing,
8.98
hand - guided Lagging Hammer)
Crushing Plant Operator (Oiler or Journeyman - trainee
12.14
required)
Curb & Gutter Machine Operator (Cement Only)
11.01
Driller, Jackhammer (2 foot drill steel or longer)
8.83
Drywall Installer
11.93
E�if'F rend.........
"•..__.._....<
�`- ' --------- I.....
---------
12/78
CLASSIFICATION HOURLY RATE
Electrician, Cable Splicer
15.47
Electrician, Foreman.
16.46
Electrician, Journeyman Wireman and Lineman
14.79
Engineer Oiler
11.10
Equipment Greaser (Grease Truck)
11.81
r--.
Equipment Greaser (Rack)
11.67
Fine Grader, Highway and Street Paving, Airports, Runways
8.63
and similar type heavy construction
12.14
Fireman
11.38
Ford Ferguson (with dragtype attachments)
11.67
Forklift Operator (under 5 -ton capacity)
11.10
Forklift Operator (over 5 tons)
12.14
Glazier
11.63
Gradall Operator (Oiler or Journeyman - trainee required)
12.14
Grade Checker
12.14
Grinding Machine Operator (all types)
11.01
Guinea Chaser
8.63
Hardwood Floor worker
10.97
Head Rock Slinger (Laborer)
11.00
Heavy Duty Repairman
12.14
Heavy Duty Repairman Helper
11.10
Heavy Duty Repairman - Welder Combination
12.26
Instrumentman
12.03
Ironworker, Fence Erector
11.11
Ironworker, Reinforcing
12.00
Ironworker, Structural
12.00
Jackson Vibratory & Similar Type Screed Operator
11.01
Laborer, General or Construction
8.48
Lather
12.50
Loader Operator (Athey, Euclid, Sierra and Similar Types)
12.14
Millwright 11.27
Mortarman and Tarman 8.48
Motor Patrol - Blade Operator (single engine) 12.26
Motor Patrol Operator (multi- engine) 12.43
Operator of Pneumatic, Gas, Electric Tools, Vibrating
Machines and similar mechanical tools not separately 8.83
classified herein
Painter - Brush 11.58
Painter - Spray Gun 11.83
Painter - Sandblaster 12.33
Party Chief 12.71
Pavement Breaker Operator (truck mounted Oiler - 12.03
Journeyman - trainee required)
Pile Driver Man - Derrick Bargeman 10.90
Pipefitter, Industrial Journeyman 13.12
L-;..., .
�:.........
2
5
' 12/78
CLASSIFICATION Ho -RLY P yTF
Pipelayer performing all services in the laying and
installation of pipe from the point of receiving pipe
in the ditch until completion of operation, including 8.98
any and all forms of tubular material whether pipe,
metallic or nonmetallic, conduit, and any other
- stationary type of tubular device used for the conveying
of any substance or element whether water, sewage, solid,
gas, air, or other product whatsoever and without regard
to the nature of material from which the tubular is
fabricated ; No -Joint Dine and stripping of same
Pipelayer's Backup Man, coating, grouting, making of
joints, sealing, caulking, diapering and including 8,83
rubber gasket joints, pointing and any and all other
services
Plasterer Foreman 13.985
Plasterer 12.985
Plaster Tender 10.975
Plumber 13.12
Pneumatic Nailer or Power Stapler 11.02
Power Concrete Curing Machine Operator 11.67
Power Concrete Saw Operator 11.67
Power- Driven Jumbo Form Setter Operator 11.67
Power Sweeper Operator 11.81
Riprap Stonepaver, placing stone or wet sacked concrete
8.63
Road Oil Mixing Machine Operator
12.03
Rock Slinger (Laborer)
8.83
Rock Bargeman or Scow
10.80
Rodman
11.81
Roller Operator (asphalt or finish)
12.03
Roller Operator (compacting)
11.81
Roofer Foreman
13.62
Roofer Journeyman
12.87
Roof Loader of Shingles
9.44
Ross Carrier Driver (jobsite)
11.67
Ross Carrier Driver (Highway)
10.90
Rubber -Tired Earth Moving Equipment Operator
12.03
(single engine, up to and including 25 yard struck)
Rubber -Tired Earth Moving Equipment Operator
12.26
(single engine over 50 yard struck)
Rubber -Tired Earth Moving Equipment Operator
(multiple engine, Euclid, Caterpillar and similar)
12.26
(over 25 yards and up to 50 cubic yard struck)
Rubber -Tired Earth Moving Equipment Operator
(multiple engine, Euclid, Caterpillar and similar
12.43
type over 50 cubic yard struck)
- Saw Filer
10.85
Scoring Machine Operator
11.01
Screed Operator (Asphalt or Concrete)
11.81
Sheet Metal Worker
13.16
Shingler
10.90
Shovel, Backhoe, Dragline, Clamshell Operator, over
3/4 yard and up to 5 cubic yard M.R.C. (Oiler or
12.14
Journeyman - trainee required) (Long Boom pay applicable)
�`' .--- - - - - --
-� 12/78
CLASSIFICATION
Skiploader Operator - Wheel Type up to 3/4 yard without
11.38
attachment
Skiploader Operator (Crawler and Wheel Type, over 3/4 yard
12.03
and up to and including 1? yards)
Skiploader Operator (Crawler and kneel Type, over lz yards
12.14
up to and including 6 %2 yards)
"-' Stationary Pipe Wrapping & Cleaning Machine Operator
11.67
Table Power Saw Operator
10.87
Tile Setter
12.62
Tile Finisher
9.96
Tractor Loader Operator (Crawler and Wheel type over 6z yards)
12.26
Tractor - Operator (any type larger than D -5 - 100 flywheel h.p.
and over, or similar) (Bull Dozer, Tamper, Scraper and
12.14
Push Tractor, single engine)
Tractor Operator - Bull Dozer, Tamper, Scraper (single
12.03
engine, up to 100 h.p., flywheel and,similar types, up
to and including D -5 and similar types)
Tractor Operator (Boom Attachments)
12.14
Tractor Operator with Scrapers or Belly Dumps in
Tandem - $1.00 per hour above regular rate
Tree Climber, Faller, Chain Saw Operator
Pittsburgh Chipper or similar type
8.63
Brush Shredders
Trenching Machine Oiler
11.38
Trenching �•Iachine Operator (up to 6 ft.)
11.81
Trenching .Machine Operator (over 6 ft. depth capacity,
manufacturer's rating) (Oiler or Journeyman -
12.14
trainee required)
Truck Crane Oiler
11.38
Truck Drivers:
Dumperete Truck, less than 62 yards water level
10.44
Du: Truck, 6 yards water level and over
10.58
Fork Lift
10.90
Road Oil Spreader Truck
10.38
Transit -Mix Truck- -under 3 yards
10.44
Transit -Mix Truck - -3 yards or more
10.58
Trucks, 2 axles
10.20
Trucks, 3 axles
10.35
Trucks, 4 or more axles
10.60
Water Trucks - 2 axles
10.38
Water Trucks - 3 or more axles
10.50
Truck Mounted Power Broom
10.26
Truck Greaser and Tireman (50 cents per hour additional
10.53
for tireman)
Truck Repairman
11.15
Truck Repairman Helper
10.45
Truck Repairman ;-elder
11.25
tr;arehouseman and Teamster
10.12
t-arehouseman Clerk
10.51
,�7elder - General
12.03
winch Truck Driver - Additional when operating power
0.125
winch, or similar special attachments
In addition to the herein
provisions, including but
foreman premium, vacation,
training allowances, shall
Southern California Master
as negotiated by the Local
Crafts.
stated hourly wages, fringe benefit
not limited to health and welfare,
pension, and apprentice and
be paid as set forth in the
Labor Agreement of July 1978, or
Building and Construction Trades
Apprentices may be employed in conformity with Section 1777.5
of the California Labor Code.
Per diem wages, holidays, and overtime pay for the various
classifications of work shall be in accordance with the
Southern California Master Labor Agreement of July 1978, or
as negotiated by the Local Building and Construction Trades
Crafts.
It shall be mandatory upon the Contractor to whom the contract
is awarded and upon any Subcontractor under him to pay not
less than the said specified rates of wages to all laborers,
workmen, and mechanics employed by him in the execution of
the contract.
EKE",-, .............