RES-2010-166 RESOLUTION NO. 2010- 166
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
ANAHEIM ADOPTING THE "MASTER PLAN OF STORM
DRAINAGE FOR FULLERTON CREEK CHANNEL
TRIBUTARY AREA SEPTEMBER 2010"
WHEREAS, the City Council did, in January 1974, adopt the Master Plan for Drainage for
the City of Anaheim; and
WHEREAS, revised storm drainage design parameters and other studies have shown the need
to update the "Master Plan of Storm Drainage for Fullerton Creek Channel Tributary Area September
2010" A copy of the "Master Plan of Storm Drainage for Fullerton Creek Channel Tributary Area
September 2010" is on file and can be viewed in the City of Anaheim Public Works Department; and
WHEREAS, it is necessary and desirable to replace all applicable sections and provisions
related to the "Master Plan of Storm Drainage for Fullerton Creek Channel Tributary Area
September 2010" for the Master Plan for Drainage for the City of Anaheim.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Anaheim,
California, as follows:
1. The City Council does hereby adopt the "Master Plan of Storm Drainage for Fullerton
Creek Channel Tributary Area September 2010."
2. All other sections and provisions of prior Master Plans and/or Studies of storm drainage
not related to the "Master Plan of Storm Drainage for Fullerton Creek Channel Tributary Area
September 2010" shall remain in full force and effect.
THE FOREGOING RESOLUTION is approved and adopted by the City Council of the City
of Anaheim this 1 2thday of October 2010 by the following roll -call vote:
AYES: Mayor Pringle, Council Members Sidhu, Hernandez, Galloway, Kring
NOES: NONE
ABSTAIN: NONE
ABSENT: NONE
CIT ANAHEIM
■
MAYOR OF TH ` TY F ANAHEIM
ATTEST: a /
,',/ 4 • A
CITY CLERK OF THE CITY OF ANAHEIM
79369.v 1 /MGordon
1
Legend
Anaheim City Limits
Street Right of Way
r Basin 5
Basin 10
i Basin 11
1
Basin 13
' "\ Basin 15
'"-...........\\._
E
ORANGET ORPE AVE - ORANL.ETHORPE E
L
. i
¢ ...... c0.0 bib., ''°3 S., . _
•.' L:L... .0
g i 1 1 ii
- .. ' Iii-- 0 ,---- -[
I' ' ;`- - "i'.'' , N ,,- , , ,,,, ^^E ptc ' ""1 _,."' - --7 -- — -- .4 - -,', 3 ' 'i E X . I
1 7,..t.,---„.--_,,.,.- _41 a 1, -."' z ci ii i, i
.T
i- i,,
0 . '" ..!, .....1__
EYADR '",,,..• ' '" _.4) i ,c s 7
Q,
.„
I ,,,,- a , f , si r m-j --..:<:.:„,,..
...,,
lo '
r, t
igii
,......, iii,
Eli A L• 1 L ,-;
'g ig W.,.: ,_ — — 7r - : 13.1 1 .thequlis 2,000 feet
tikl \ - A\A c ,eJa'avi . 11 , „11,`,
•• - 1= 1
w iiI i i i; -„------ , ,,,.. '..
1 I
. ; „.,.. wic
, r L ,' „.„',!
(-- ( 5 N N., __.- 1 JP reek (801 VIII , %
i .--tri ).\ 1 t , t ••!•-■-■.- '' ....... . ke. *
==p H -- ig I i __I ■ i
RE .1 5 Cf.*" ‘171INWIll CRESCENT VE
1_3 _______
.0. , .....,, Figure 1
! ,. • o r , g 61 •
1-1- _ .. = , Li '4 x 3
'--- -i 4. : — • :; 8 - -- -
. ,„- , 1 C2 .\ ,,,,„,* , ,*,, _
sio 1 ,,, ---1,:...
.4_■;
0* \ _c
.1.t. WAY -.4, . ! ,_, 4 - ..b
'''- §114 . 1:1 .. i
- Study Area
':-------' \---1:1; KAM ST
'\''' \--", III \
-- . 0.1:i 1 1 11 A li,,I ii, ,.....,... .,„,„,
le r. .
LI II ‘ I' ' Al LINCOLN AVE IV D ,* I=-b ' ?Ti i 11( ,:i7 7NR= N■\,:::5-."1\---A Master Plan of Storm Drainage for
. ' ' 11
At . . .,E. Fullerton Creek Channel Tributary Area ......—.— ....---, Ivo
H-,,.., MAP. IN • , IP
--. i
• I ,,I[i- , . iii rt c ---- N . ,, c-1,-4
..... „ 1 NIA =2111 • _.- L:12_4c
\
IIM I I Will . , ROADWAY all■
4410 CH2MHILL
- i ni2:15P s MI T 114 ,,,, XI
I fr,1 r .111M1 k im , , E.:114H i
I ILT
-T.-.-i .E._I•vaA _ \ . mitak _ ,00.