Loading...
RES-2007-120RESOLUTION NO. 2007 -12 0 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ANAHEIM ADOPTING NEW FEE SCHEDULES FOR THE PUBLIC WORKS DEPARTMENT OF THE CITY OF ANAHEIM. WHEREAS, it is the policy of the City Council of the City of Anaheim to provide for the amount of fees to be established by resolution; and WHEREAS, the City Council has by resolution and ordinance heretofore established various fees in the Public Works Department of the City of Anaheim; and time; and WHEREAS, it is the desire of the City Council to revise and update said fees at this WHEREAS, the fees hereinafter reestablished do not exceed the estimated reasonable cost of providing the service for which the fee is charged; and WHEREAS, prior to approving said fees, the City Council has held at least one public meeting at which oral or written presentations could be made concerning said proposed fees as part of a regularly scheduled meeting of the City Council; and. WHEREAS, the City of Anaheim has heretofore complied with the applicable requirements of Chapter 8 of Division 1 of Title 7 of the Government Code of the State of California entitled Procedures for Adopting Various Fees; WHEREAS, the City Council further finds and determines that this establishment and amendment to fees is exempt from the provisions of the California Environmental Quality Act pursuant to Section 21080(b) (8) of the California Public Resources Code. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Anaheim that fees to be charged and collected by the Public Works Department of the City of Anaheim shall be as set forth in Exhibit A, which is attached hereto and incorporated by reference herein. BE IT FURTHER RESOLVED that fees established in this resolution shall become effective on the sixtieth day following the date of adoption of this Resolution, and shall supersede Ordinance 3896, Resolution 89R -371. and Resolution 93 -148, approved by the City Council concerning the collection of the hereinabove specified fees in the Public Works Department of the City of Anaheim. BE IT FURTHER RESOLVED that the rates set forth in Resolution 2006 -150 are hereby superseded to the extent of any conflict with the rates established herein. THE FOREGOING RESOLUTION is approved and adopted by the City Council of the City of Anaheim this 19th day of June 2007, by the following roil -call vote: AYES: Mayor Pringle, Council Members Hernandez, Sidhu, Galloway, Kring NOES: NONE ABSTAIN: NONE ABSENT: NONE ATTEST: TY CLERK OF THE s AN HEIM 65537.1 /bgranato /5 -15 -U7 2 MAYOR OF THE 7 INAHEIM Department of Public Works Proposed Fee Schedule FY 2007108 1. SERVICE FEES A. Traffic/Parking Studies B. Detour Plans/Traffic Control C. Plan Checking: 1 Regular 2 Consultant Services D. Construction Inspection 1 Regular 2 Overtime E. T.V. Sewer Inspection (2 hrs. minimum) F. Sewer /Hydrology Studies G. Right -of -Way Sketches H. Specific Plan /E.I.R. Reviews I. Misc. Technical Reviews J. Real Properly Services K. Contract Administration L. Sidewalk Waiver M. Final Map Documents N. Plans and Specifications O. Clerical Mailing Fee 2 PERMIT FEES A. Right -of -Way Construction: 1 Public Agencies /Public Utility 2 Public Utility Annual Blanket Permit C. Transportation* 3 SERVICE FEE DEPOSITS A. Traffic Studies B. Traffic Signal (plan check inspection C. Design Studies: 1 Sewer /Hydrology 2 Right -of -Way Sketches 3 Specific Plan Reviews 1 Proposed Rate FY07 /08 Rate Range $68 $68 $139 /hr. $139 /hr. $101 $123 /hr. (at contract rate) $93 $129 /hr. $140 $195 /hr. $93 $129 /hr. $112 $158 /hr. $98 $127 /hr. $101 $123 /hr. $101 $123 /hr. $98 $127 /hr. $104 $126 /hr. $256 Actual Cost $19.49 $57 /hr. $107 $447 3 Single Family (residential 4 Commercial /industrial $215 $60 B. Grading. 1 Flatland $122 2 Hillside $143 1 Annual Permit $90 /ea. 2 Single Trip $16 /ea. 'as authorized by Caltrans and the CA Vehicle Code. D. Permit Time Extension 50% of the original permit fee 1 Less than 100 Peak Trips $1,026 2 100 -250 Peak Trips $3,076 3 Over 250 Peak Trips $4,102 $30 sheet $3,588 $964 $193 $483 EXIHmT 4 Department of Public Works Proposed Fee Schedule FY 2007/08 4 Misc, Technical Reviews $964 5 Sewer Studies/Reviews a. Minor $3,096 b. Major $5,160 D. Plan Checking/Inspection 1 Tracts Single Family $732 /lot Multi-Family $305 /unit 2 Parcel Maps (map only) $3,001 3 Lot Line Adjustment $1,251 4 Special Projects: a. Street/Storm Drain $10 /tf Minimum Deposit $2,893 b. Sewer $11 /If Minimum Deposit $2,893 5 Minor Grading (no building pad) $367 6 Flatland Grading Plan: a. Less than 500 cy $1,285 b. 500 cy or more 7 Hillside Grading Plan: a. Less than 100 cy c. 10,001 100,000 cy d. 100,001 1,000,000 cy e. Over 1,000,000 cy 8 Reversion to Acreage 9 Certificate of Compliance 10 Certificate of Correction I. Permit Inspection Deposit (formerly excavation deposits) 1 Single Family-driveway approach 2 Single Family-sidewalk 9 Sewer Laterals 11 Groundwater InstalliDestruction Tee HO and 111 (Monitoring requires a 4-hr, min. deposit at the regular construction inspection rate. (Installation/destruction requires a 3-hr. min. deposit.) 13 Lane Closure Proposed Rate FY07/08 $3,471 $1,447 b. 100-10,000 cy $4,636 $7,407 $11,643 515,877 $1,157 $868 $290 E. Deed Preparation/Processing $386 F. Abandonment $1,397 G. Encroachment $1,081 H. NPDES Water Quality Management Plans $1,071 $103 min. $0.00 3 Commercial-driveway approach $408 min. 4 Commercial-sidewalk $327 min. 5 Industrial-driveway approach $408 min. 6 Industrial-sidewalk $327 min. 7 Misc. Commercial/Industrial $652 min. 8 Water/Electrical Service $652 min. 12 Telecommunications Master Plan $3,657 $652 min. 10 Groundwater Monitoring (annual) $416 ea. $311 ea. $52 /day Department of Public Works Proposed Fee Schedule FY 2007/08 4 IMPACT FEES A. Transportation Impact and Improvement Fee: 1 Single Family $1,577 /unit 2 Multi Family 3 Hotel/Motel 4 Office 5 Retail/Commercial 6 Industrial 7 Peak Hour Trip End $998 /trip B. Sewer Connection Fee ($250 min.) $350 /net acre C. Sewer Impact Fees (Anaheim Resort Area South Central Anaheim 1 Single Family $1,080 /unit 2 Multiple Famuy 81,211 /unit 3 Mobile Home $675 /unit 4 Hotel/Motel $540 /unit 5 Commercial/Recreational $215 /1000sf 6 Industrial $335 /1000sf D. Sewer Impact Fees Vest Anaheim) 1 Single Family per unit) $1,027 $1,727 $1,243 $276 2 Mutti-Family (per unit) $1,027 $1,727 81,243 $276 3 Corridor Residential (per unit) $1,027 $1,727 $1,243 $276 4 Mobile Home (per unit $1,027 $1,727 $1,243 $276 5 Hotel/Motel (per unit $345 $581 $417 $93 6 Mixed Use Residential (per unit) $1,027 $1,727 51,243 $276 7 Mixed Use Non-Residential 8 Commercial (per 1,000 sf of gfa) $477 $803 $579 $128 9 Industrial per 1,000 sf of gfa $334 $562 $405 $90 10 Institutional (per 1,000 sf of gfa) $287 $482 $347 $78 11 Quasi Public/Recreational $27 $46 $33 $7 E. Sewer Impact Fees East Anaheim 1 Single Family (per unit) Estate 2 Multi-Family (per unit) Low-medium 3 Mobile Home per unit $0 $0 $0 $0 4 Hotel/Motel (per unit) $0 $0 $0 $0 5 Commercial (per 1,000 sf) $0 $0 $0 $0 6 Industrial per 1,000 sf) $0 $0 $0 $0 7 Institutional (per 1,000 sf) $0 $0 $0 $0 F. Storm Drain Impact Fees (Anaheim Resort Area South Central Anaheim): 1 Single Family $14,825 /net acre 2 Multiple Family $18,878 /net acre 3 Mobile Home 4 Hotel/Motel, Commercial/Recreational industrial $27,015 /net acre *Per net acre of increased impervious area over existing conditions 3 Proposed Rate FY07/08 $1,008 /unit $1,145 /unit $2.85 /gsf $4.27 /gsf $1.10 /gsf Zone A Zone B Zone C Zone D $477 $803 $579 $128 Zone A Zone B $21,610 /net acre Zone C Zone D $612 $855 $0 $0 $0 $1,007 $0 $0 Department of Public Works Proposed Fee Schedule FY 2007/08 G. Sewer Assessment Areas: 1 Mohler Drive 2 Martella Lane 3 Willdan Road-Pleasant Pl. 4 Silver Dollar Lane 5 Eucalyptus Drive East) 6 Eucalyptus Drive West) 7 Timken Canyon 8 Timken Road 9 Peralta Hills Drive 10 Arboretum Road 11 Country Hill Road 12 Via Vista 13 Freeway Park 14 Kathryn-Lindsay Annexation: 15 Linbrook Park -Brookhurst 16 Lincoln Ave.-Westem St. 17 Lindsay St. tprior to annexation) $546 /lot 18 La Cresta Avenue 19 Monroe Avenue $560 /lot 20 Polk-Tyler-Coolidge 21 Thornton-Bra 22 Savana Street 23 Clementine St.-Elm St. $20,283 /acre 24 Coffman St.-Cypress St. $10,015 /acre H. Storm Drain Assessment Areas: 1 Anaheim Canyon Industrial $2,000 (Formerly authorized by 77R-601) 2 Monte Vista $3,552 (Formerly authorized by 77R-60'1) 3 Lakeview Avenue (Formerly authorized by 78R-726) 4 Clementine Street 5 Savana Street Proposed Rate PY07/08 $1,545 Jacre+lateral $5,371 Jacre+laterai $5,371 /acre+lateral $12,643 tacre+iateral $16,329 tacre+lateral $16,329 /acre+lateral $12,987 /a cre+lateral $5,798 /acre+lateral $893 /acre+Iateral $829 /acre+lateral $2,399 /acre+lateral $11,240 /acre+lateral $549 /lot -Bircher-Hilbers-Lindsay $669 /lot $730 /lot -Kathryn-Rancho-Wd $730 /lot (Formerly authorized by 78R-726) (Formerly authorized by B7R-197) $1,485 /lot 6 Howell Avenue-Sunciair Street $3,262 (Formerly authorized by 87R-198) 7 Weir Canyon $6,751 (Formeriy authorized by 87R-509) 8 Orangewood Avenue $2,563 (Formerly authorized by 89R-226) 9 Orangefair Lane-Commercial Street $9,230 (Formerly authorized by 89R-292) 10 Rivera M. H. Park/Fujishi9e Prop (Formerly authorized by 90R-65) 11 Lemon (Formerly authorized by 93R-149) $516 /lot $771 /acre $464 /lot $364 /iot $613 /acre+Iateral $2,436 $1,200 $3,575 $6,347 $7,150 Department of Public Works Proposed Fee Schedule FY 2007108 5 SUPPLEMENTAL FEES- PLATINUM TRIANGLE PROJECT AREA A. Traffic impact Fees C. Sewer Impact Fees 6 COPY FEES 2 Multiple Fami 3 Mobile Home- Gross floor building area development between the 0.4 and the 1.0 Floor Area Ratio ("FAR") A. Copies (8 1/2" x 11") and (8 1/2" x 14") B. Prints from Laser Fiche (8 1/2" x 11") and (11" x 17") C. Copies (11" x 17") D. Copies (18"x 24") and (24" x 36") E. Prints from Laser Fiche (18" x 24") and (24" x 36") F. Standard Detail Book Key: cy =cubic yard ea. =each gsf =gross square foot hr, =hour If =linear foot min. =minimum sf =square foot du =dwelling unit 5 Proposed Rate FY07/08 1 Condominium $2,876.77 /du 2 Apartment $3,896.82 /du 3 Office 4 Commercial $39.13 /gsf 5 Industrial /gsf B. Storm Drain impact Fees (Drainage District 27) 1 Single Family $86,143.79 /net acre $86,143.79 /net acre $86,143.79 /net acre 4 Hotel/ Motel, Commercial, Recreational, and Industrial $86,143.79 /net acre 1 All Land Uses $498 /1,000 gsf D. Arterial Highway Beautification Fees 1 All Land Uses $14,467 /gross acre $0.10 /page $0.75 /page $0.25 /page $2 /sheet $2 /sheet $15 /ea. G. Santiago Landslide (Executive Summary) $11 /ea. T W J CO Q I Ce 0 O 0 Z z Y W Q a- WQ' CL I- 0 0 LL 4) L N cr VJ L LU J 2 Q LL 4) F- A J 0 N 2a J C 2 cm Q c LL N J Q Z in d O O tL N L t6 W U 0- L LL N O a