83R-206 ..,..... RESOLUTION NO. 83R-206 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ANAHEIM FINALLY ACCEPTING THE COMPLETION AND THE FURNISHING OF ALL PLANT, LABOR, SER- VICES. MATERIALS AND EQUIPMENT AND ALL UTIL- ITIES AND TRANSPORTATION INCLUDING POWER, FUEL AND WATER. AND THE PERFORMANCE OF ALL WORK NECESSARY TO CONSTRUCT AND COMPLETE THE FOLLOWING PUBLIC IMPROVEf-1ENT, TO WIT: - NEIGHBORHOOD PRESERVATION AREA NO. 1 STREET AND UTILITY IMPROVEMENTS, CLEMENTINE ST., HELENA ST., CYPRESS ST., CHARTRES ST., IN THE CITY OF ANAHEIM, ACCOUNT NO. 46-793-6325-E35l0. WHEREAS, the City Council of the City of Anaheim did cause to be published in a newspaper of general circulation printed, published and circulated in the City of Anaheim, to wit: The Anaheim Bulletin, on the 5th and 12th days of August, __ , 19 82, a notice inviting sealed proposals for furnishing the following: All plant, labor, services, materials and equipment, and all utilities and transportation, includin~ power, fuel and water, and performing all work necessary to ' construct and complete in a ~ood and workmanlike man- ner, in strict accordance with the specifications, plans and drawin~s therefor on file in the Office of the City Engineer or City Clerk of the City of Anaheim, the following public improvement, to wit: Neighborhood Preservation Area No. 1 Street and Utility Improvements, Clementine, Helena, Cypress and Chartres Streets, in the City of Anaheim, consisting of clearing and grubbing, excavation, construction of A.C. pavement,- including heater-remix, construction of sidewalk and drive approaches, installation of street lighting, in- cluding luminaires, marbelite standards, conduit and pull boxes~ installation of 4", 8", 10" and 12" water main, gate valves, fire hydrant assemblies, and all appurtenant work as shown on the plans ~and delineated in the specifications on file in the office of the City Engineer, Account No~ 46-793-6325-E35l0, in accordance with the designs, plans, profiles and specifica- tions prepared by ~he Public Works Department and the notice inviting sealed proposals, which said notice ATT-40 -1- ""~.,'~".."'"-'''* specified that sealed proposals as specifiea in said notice would be received up unt il 2: 00 0 I clock P. M. of the 26th, day of Augus t . , 19 82 , and wh ich said not ice did state and declare that, pursuanr-to the provisions of Section 1770 of the Labor Code, the City Council of the City of Anaheim had ascertained the prevailing rate of wages for each type of labor needed to exe- cute said contract, and did state that the prevailing hourly wage scale so ascertained was on file in the Office of the City Clerk, ~-\ and vlHEREAS, on the 26th day of A~ust , 19.-a2.., at the hour of 2:00 o'clock P.M., the City Cler and the City En~ineer of the City of Anaheim did open said ~~aled proposals received up to that time for the furnishing of all plant, labor, services, materials and equipment, and all utilities and transportation, in- cluding power, .fuel and water, and performing all work necessary to construct and complete, in a good and workmanlike manner, in strict accordance with the specifications, plans and drawings therefor on file in the Office of the City Clerk of the City of Anaheim, the pUblic improvement hereinabove more particularly described and set forth, in public, in the City Council Chambe~ in the City Hall; Anaheim, California, and the City Engineer did tabulate the result of said sealed proposals and did make a report to the City Council at its second subsequent regular or adjourned re~ular,meeting; and " WHEREAS, the City Council of the City of Anaheim did, at its second subsequent regular or adjourned regular meeting, held on the 7th day of September J 1982 , at the hour of 1: 30 o'clock P.M., consider the sealed proposals submitted for furnish- in~ the materials and performin~ the work hereinabove more particu- larly described and set forth, and did thereupon find and determine that the sealed proposal submitted by R. J. NOBLE COMPANY. 15505 East LipcoLn Ave., Orange, California 92666 for the construction, installation and completion of said Neighborhood Preservation Area No. 1 Street and Uti1it Im rovements emen 1ne ., e ena t., ypress t., artres' t., 1n t e 1ty of Anahe1m, Account No. 4b-/~3-b3L~-E3~lO, hereinabove mentioned and described, was the lowest responsible proposal submitted therefor, and thereupon accepted said bid and did award a contract to said" contractor for furnishin~ all plant, labor, services, materials and equipment and all utilities and transportation, including power, fuel and water, and performing all work necessary to construct and complete, in a good and workmanlike manner, in strict accordance with the specifications, plans and drawings, the said .public im- provement as specified in said notice inviting sealed proposals, and did authorize the Mayor and the City Clerk of the City of .Anaheim to execute a contract for and on behalf of the City of Anaheim with said contractor, which said contract was duly made and entered into on the 22nd day of September , 19~; and WHEREAS, the said contractor has furnished all plant, labor, services, materials and equipment and all utilities and transportation, and performed all work necessary for the construc- tion and completion, in a good and workmanlike manner, in strict -2- ~___~"'O'''''''''''''i''"",",,,,,,-_,,,,,,,, .II.. accordance with the specifications, plans and drawings of said public improvement as specified in the notice inviting sealed proposals and in the detailed designs, plans, drawings and speci- fications prepared by the Public Works Department, and the con- tract made and entered into with said contractor by the City of Anaheim; and WHEREAS, the Public Works Executive Director has duly certified to the construction and completion of said public im- provement hereinabove mentioned and described, in accordance with the plans and specifications and the contract documents duly made and entered into with said contractor; and WHEREAS, the City Council finds that said contractor has completed said public improvement hereinabove more particularly described in accordance with the provisions of the contract and the contract documents, and that notice of completion should be filed and payment of the balance due said contractor authorized in accordance with the contract documents. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Anaheim that all plant, labor, services, materials and equiDment and all utilities and transportation, and the per- formance of all work necessary to construct, install and complete in a good and workmanlike manner, in strict accordance with the specifications, plans and drawin~s therefor on file in the Office of the City Clerk of the City of Anaheim, together with the appur- tenances thereto, said public improvement hereinabove more parti- cularly described and set forth, in the City of Anaheim, by said contractor, be, and the same are hereby, accepted subject, never- theless, to all the terms, conditions and provisions of the contract documents, and that the balance due said contractor for said work be paid to said contractor thirty-five (35) days from and after final acceptance of said work as evidenced by the adoption of this resolution, but not sooner than thirty (30) days after the date of the filing of notice of completion, excepting only such sum or sums as may lawfully be withheld in accordance with the provisions of said contract and contract documents. That acceptance by the con- tractor of said payments made in accordance with said final estimate shall operate and shall be a release to the City of Anaheim, its officers, agents and employees from all claims and liabilities due the contractor for anything done or furnished or withheld or for anything relating to the work or any act or neglect of the City, its officers, agents and employees, excepting only claims against the City for amounts withheld by the City at the time of such payment. AND BE IT FURTHER RESOLVED that the Mayor be, and he is hereby, authorized to execute and file a notice of completion of said work as required by law. \ , -3- THE FOREGOING RESOLUTION is approved and adopted by the City Council of the City of Anaheim this 24th day of M.<=IY , 19.83. ATTEST: LINDA D. ROBERTS, CITY CLERK ASSISTANT ~ ~~EIM Ifm 5-16-83 -, \ STATE OF CALIFORNIA ) COUNTY OF ORANGE ) SSe CITY OF ANAHEIM ) I, LINDA D. ROBERTS, City Clerk of the City of Anaheim, do hereby certify that the foregoing Resolution No. 83R-206 was introduced and adopted at a regular meeting provided by law, of the City Council of the City of Anaheim held on ~ the 24th day of May, 1983, by the following vote of the members thereof: AYES: COUNCIL MEMBERS: Kaywood, Overholt, Bay and Roth NOES: COUNCIL MEMBERS: None ABSENT: COUNCIL MEMBERS: Pickler AND I FURTHER CERTIFY that the Mayor of the City of Anaheim signed said Resolution No. 83R-206 on the 24th day of May, 1983. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of the City of Anaheim this 24th day of May, 1983. LINDA D. ROBERTS, CITY CLERK BY 4s~~ ~8- (SEAL) I, LINDA D. ROBERTS, City Clerk of the City of Anaheim, do hereby certify that the foregoing Is the original of Resolution No. 83R-206 duly passed and adopted by the Anaheim City Council on May 24, 1983. LINDA D. ROBERTS, CITY CLERK BY ~#. ?ZS:<< , ASSISTANT CITY CLERK _____ ----\